REVISION TABLE
ATTACHMENTS
REVISIONS
PAGE REMARKS REVISIONS REMARKS
ATT. PAGES
1 2 3 4 5 6 1 2 3 4 5 6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24 EXHIBITS
25 REVISIONS
EXHI. PAGES REMARKS
26 1 2 3 4 5 6
27
28
29
30
31
32
33
34
35
36
37
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
TABLE OF CONTENT
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
9.2 Fire and Gas Detection ------------------------------------------------------------17
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
17.1 Crane and Lifting Equipment ----------------------------------------------------29
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
1. INTRODUCTION
This procedure details emergency contingency plan for this job site. Personnel involve in the
emergency procedure shall have an adequate training and practices to be carried out on
regular basis.
2. GOLDS AND SCOPE
This procedure has specific elements that detail emergency procedure to protect, minimize
impact of personal injuries or loss of assets. This document applies for activities of CIVIL
WORKS AND PIPE-RACK INSTALLATION.
3. REFERENCE
a. COMPANY PROCEDURE
1) Medical Emergency Response Plan
2) 596-HSE-PR004 AIM Emergency Preparedness and Response Procedure
b. CONTRACTOR PROSEDURE
HSE Manual (HSE Requirments Point 4.13- Emergency Preparedness)
4. ABBREVATION
a. PM : Project Manager
b. HSE : Health Safety & Environment
c. Medevec : Medical Evacuation
d. AIM : South Processing Unit
e. ERP : Emergency Response Plan
f. CPY : Company - PT. MERDEKA MINING SERVIS
g. CTR : Contractor - PT. AGI PERKASA KOSNTRUKSI
h. ERT : Emergency Response Team
5. AUTHORIZATION OF RESPONSIBILITIES
a. COMPANY
1) Project Manager (PM)
PM is responsible for :
Facilitating the necessary transportation maens For Medevac when needed
2) CPY Construction Supervisor
Responsible to ensure all works delivered by CTR in safety manner. Perform
good reporting to CPY CONSTRUCTION Superintendent. In case of emergeny,
CPY Supervisor is responsible to communicate the incident happened to CPY
superintendent and site authorities. CPY CONSTRUCTION supervisor must
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
ensure all contractor action have been done referring to project bridging ERP.
CPY Supervisor is a responsible to ensure emergency drill or exercise
performed regularly (monthly). He shall responsible to monitor the injuries
person is evacuated in safe manner.
b. CONTRACTOR
1) Contractor Respresentative/PJO
In case of emergency, The Contractor Representative and/or PJO have the same
responsibilities. They have the entire responsibility to initiate a Medevac after
consultation with the Medic on site. They also have a responsibility communicated
authority family injury person (IP)/victim, media and other relevant parties.
PJO/contractor representative mostly stationed at site office.
RESPONSIBILITIES ACTIVITIES
1. Overall implementation and regular 1. Provision of adequate emergency
review of the Emergency Response resources to the ERT
Plan. 2. Notification of Emergency Response
2. Make a decision, based on the situations to CPY and CTR
severity of the emergency, to initiate Management
the Medevac Procedure.
RESPONSIBILITIES ACTIVITIES
1. Implementation, coordination and 1. Organize initial and ongaing refresh
review of the Emergency Response training in:
Plan and Procedures. a. PPE Usage
2. Ensure adequate Personal Protective b. Fire Fighting
Equipment (PPE) devoted to the c. First Aid
project d. Emergency Response
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
3. Establishment, training and 2. Conduct regular drills of emergency
perfomence of the Emergency response procedures and resources
Response Team (ERT) 3. Assint in incident/injury
4. Coordinate medical evacuation of investigations, prepare major
personnel from site according to the incident/injury reports and notify
information given by the medic. relevant authorities
5. Advise MERDEKA MINING SERVIS and 4. Maintain information boards that
relevant authorietes of details of outline emergency response
incidents accurring on work project procedure
area.
RESPONSIBILITIES ACTIVITIES
1. Mobilize and coordinate the ERT 1. Maintain a personal log of events
members in the event of site 2. Liaison and coordinate response
emergencies activities
2. Maintain communication and regular
briefing CTR Management
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
locations emergency situation
5) All Personnel
All project personnel are accountable to their appropriate managers for the following
responsibilities, accountabilities and assignment of activities concerning emergency
response.
RESPONSIBILITIES ACTIVITIES
1. Participate in the adhere to 1. Participate in emergency drills and
emergency response procedure training applicable to ERP
2. Reporting of all incident/injury to 2. Stop all work and the make
immediate supervisor and medic equipment inactive following and
emergency shutdown
No Equipment
1 Megaphones
2 Fire Extinguisher
3 Basket Stretcher
4 First Aid Bag Tipe C
5 Light Vehicle
6 Eye Washer
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
APPENDIX A
MEDICAL EVACUATION & EMERGENCY FLOW CHART
Incident/
Accident
CRT-ERT
YES
NEED ASSIST CPY ERT Assist
OF CPY ERT To Intervened the incident
NO MEDEVAC
After Tretment Vitcim MTI
Back to Work FAP Designated Hospitals
Doctor Givi
Treatment and
Required to Medivac
Inform Vitcim
Condition to :
- CTR Management
- CAR
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
APENDIX B
EMERGENCY RESPON TEAM
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
3 Hasrafil HSE Supervisor First Aider 082291500501 Giving first aid victim,
tredment, determining, when
and what victim heve to
evacuantion clinic
Memberikan pertolongan
pertama pada korban,
perawatan, menentukan
kapan dan apakah korban
harus di evakuasi ke klinik.
4 Rika Rahim HSE Officer Evacuation 085256372709 Giving first aid to victim,
Team tredment,determing when
and whether victim have to
evacuation clinic FAP
MTI/IMIP
Memberikan pertolongan
pertama pada korban,
pengobatan menentukan
kapan dan apakan harus di
evakusi ke klinik MTI/IMIP
5 PT.MTI/MMS Driver Ambulance 081343661601 Assist medic to procces the
Driver evacuation and wait the
instruction from medic
continue
Membantu medis melakukan
evakuasi dan menunggu
instuksi dari medis
selanjutnya.
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
APPENDIX C
EMERGENCY CONTACT NUMBER
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
APPENDIX D
PROJECT HSE ORGANIZATION CHART
BASO AMIRULLAH
HSE Coordinator
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
EMERGENCY RESPON PLAN
Revision : 0 Status : IFA
Document Type : PLN System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename:
Document number
CONTRACT NO.:
HSE MANAGEMENT PLAN
Revision : 0 Status
Document Type : System/Subsystem : 0 Discipline : HSE Revision Date :
Contractor Document : PT. AGI PERKASA KONSTRUKSI Page 43 of 46
This document is the property of PT AGI PERKASA KONSTRUKSI and shall not be disclosed to third parties or reproduced without permission of the COMPANY
Electronic Filename: