“PUSHPAK-2”

Annexure-G: Environmental Management Plan with budget allocation details

 The EMP is prepared with a view to facilitate effective environmental management of the project in general and implementation of the
mitigation measures in particular. The mitigation measures for reducing the adverse environmental impacts together constitute a part of
EMP.
 The environmental issues, which need management and planning for the construction and operation phases are summarized below:

Environmental Mitigation Measures / Control Arrangement


Attributes Impacting Activities
During Construction During Operation
Water and  Usage of Water  Water requirement during the construction phase  Water requirement during the
wastewater  Wastewater disposal will be met through local water tanker suppliers. operation phase will be met
 Water demand will be reduced by use of curing through AUDA water supply.
agents, super plasticizers and other best construction  Low water consuming devices viz.
practices. diffused water taps and twin
 Domestic wastewater (sewage) will be disposed off flushing system, fixtures for
through Septic tank/soak pit system at the site. showers, toilet, flushing and
aerators/ diffusers or pressure
reducing devices etc. will be
provided.
 Rain water harvesting structure
will be constructed. During rainy
season, the whole system (roof
catchment, pipes, screens, first
flush, filters, and tanks) will be
checked before and after each rain
and preferably cleaned after every
dry period exceeding a month and
proper measures will be taken.
 Wastewater generated will be
treated in an onsite sewage
treatment plant. Most of the treated
water will be used for gardening
within the premises and the

Annexures of Form – 1A Page - 10


“PUSHPAK-2”

Environmental Mitigation Measures / Control Arrangement


Attributes Impacting Activities
During Construction During Operation
remaining if any will be reused in
toilet flushing in the proposed
service blocks/discharged to
AUDA drainage line along with
the flushing water.
Soil / Land  Excavation activities  Top soil will be stored onsite and used for
 Cutting and filling development of greenbelt. ---
of earth material
Municipal solid /  Solid Waste  All municipal solid waste will be properly stored on  The municipal solid waste will be
hazardous waste Management and site before it is collected by AMC for its ultimate segregated in to dry/ wet waste
Disposal disposal. and stored on site.
 Used oil and used drums, bags/liners, steel scrap if  The wet waste will be composted
any will be sold to authorized recyclers. in an organic waste converter
(OWC) and compost will be used
for green belt development. The
remnant quantity will be collected
by AUDA.

 Excavation and  Tarpaulin sheet covers will be used on the materials  Traffic will be regulated through
Air quality paving of site to avoid dusting during transportation, storage and proper signage, instruction &
 Construction of handling. parking spaces.
building structure  Peripheral barricading will be done to prevent dust  As per CPCB guideline, adequate
 Vehicular movement emission spreading outside the project premises. stack height will be provided.
for transportation of  Uniform piling of sand and proper storage to avoid Regular preventive maintenance of
materials and dusting. the DG set will be carried out.
equipment  The vehicles having PUCs and spark arrestors will  Greenbelt (tree covered and lawn
 Super structure only allowed for the transportation. covered green area) will be
(finishing work,  Fume generation due to welding and allied activities developed and maintained within/
painting, electrical will be negligible and restricted to project site. around the premises to improve air
work etc.) Dust Mitigation Measures for Construction quality.
 Dismantling of Activities: [As per the Gazzete Notification G.S.R.
temporary structure 94(E) dated 25th January, 2018.]
and site cleaning  Loose materials like sand, cement or other fine

Annexures of Form – 1A Page - 11


“PUSHPAK-2”

 Vehicle movement materials will be stored in covered or enclosed


due to occupants areas to avoid the fugitive emission.
and visitors  The area of excavation will be wetted prior to
 Stack emission from mobilization of equipment during active
DG Set excavation.
 Wind-breaker of 10 meters height will be
provided in such a way that minimizes dust
dispersal.
 Water sprinkling system will be adopted to
suppress dust.
 Grinding and cutting of building materials will
be within closed area made by curtains/barrier
etc.
 All areas for storing construction wastes /
material to be demarcated and preferably
barricaded particularly those materials that have
potential to be dust borne.
No waste will be dumped on road side. It will be
stored at a designated place.
 Transport material that are easily wind borne
will be covered by a sheet made of either jute,
tarpaulin, plastic or any other effective material
during transportation.
 Mitigation measures for dust suppression will be
displayed prominently at the construction site for
easy public viewing.
 Vehicle movement  To reduce the noise generation during the  D. G. Set will be of enclosed type
Noise for transportation of transportation activities; the vehicles will be kept with necessary acoustic enclosures to
materials and periodically serviced and maintained as per the mitigate the impact of noise.
equipment. requirement of latest trend in automobile industry.  Well-developed greenbelt along the
 Vehicle movement  All the vibrating parts will be checked periodically periphery as well as roadside
due to occupants and serviced to reduce the noise generation and the plantation to maintain noise level.
and visitors. sound producing equipment will be enclosed in the Peripheral compound wall to
sound proofing enclosure. maintain noise level outside the
premises.

Annexures of Form – 1A Page - 12


“PUSHPAK-2”

 Various construction  Personal protective equipments like earplugs, dust  Fire protection system viz. fire
Safety activities masks, nose masks, safety shoes, helmets, hand extinguishers, hydrant system,
 Raw material gloves, etc will be provided to all workers. sprinkler system, hose reel, fire
handling and storage  All workers will be trained to use welding shields pumps, manually operated electric
 Instrument/ and follow safer practice. fire alarm system etc. will be
equipment handling  Commit to make provision related to first aid and provided as per National Building
training to be provided to the construction workers. Code of India 2005 (Part 4 – Fire
 Maintaining hoists and lifts, lifting machines, and Life Safety) and / local
chains, ropes, and other lifting tackles in good authority requirements.
condition.  Such systems will be tested and
 “H” frame scaffolds & ladders made of mild steel put into operation and proper care
will be used. will be taken for its effective
 Completely Concealed Copper Wiring. operation during emergency, if
 All electrical fittings / equipment used will meet any.
the relevant IS standards.  A lightning arrester will be
 Structural design of the project considering the provided and properly earthed to
seismic zone norms for earthquake resistant prevent damage to the building
structures. when the lightning strikes.
 First Aid Box will be made readily available in  First aid emergency kits will be
adequate quantity at all the times. provided in adequate quantity at
 Sanitation facilities, resting area, drinking water, all the times.
municipal solid waste collection facility etc. will be  An underground water storage
provided for construction workers. tank will be provided.
 Commit to register the project under “The Building  All the lifts have a provision to
& Other Construction Workers (Regulation of ground automatically in case of
Employment and Conditions of Service) Act, 1996”. electricity failure.
 Emergency lighting &auto glow
signage will be provided to guide
the people towards exits and
assembly points during
emergency.
 Main entry / exit will be separate
and clearly marked. All the
staircases and lifts will open out at
ground level for emergency
evacuation.

Annexures of Form – 1A Page - 13


“PUSHPAK-2”

 Emergency power back up system


will be provided.
 Adequate peripheral marginal
space will be provided for free
movement of fire tender/
emergency vehicle around the
premises.
 Movement of  Traffic management will be ensured.  Traffic will be regulated through
Parking/ traffic vehicles throughout proper signage, instruction &
congestion the construction parking spaces.
phase and operation  Separate entry & exit will be
phase provided.
 Internal roads with 7.5 m width for
movement of vehicles and also for
fire tender (in case of emergency)
will be provided.
 Ample parking spaces will be
provided at surface, basement level
as per the NBC / GDCR norms.
 Speed limit within the premises
will be minimum to reduce traffic
congestion.
 Sign post will be provided for
smooth traffic flow and also
inculcate residents to follow traffic
rules.
Others  Eco-friendly building materials:  For Energy conservation:
---  Maximum use of Ready Mix Concrete (RMC), fly  Roof top solar panels will be
ash paver blocks for pavements/walkways, most of provided.
the carpentry structures will be made up of  Various energy conservation
processed engineering wood instead of wood, measures viz. use of LED lights for
maximum use of Portland Pozzolano Cement (PPC) common areas like staircases, foyer
containing high amount of fly ash. etc., use of highly efficient
transformers & variable frequency
drive motors etc. will be
implemented as proposed.

Annexures of Form – 1A Page - 14


“PUSHPAK-2”

 Energy efficient devices,


appliances, motors and pumps
conforming to the Bureau of
Energy Efficiency norms will be
used.

Recurring cost per Implementation Plan For


Sr. Capital cost Capital Expenditure
Head Basis for cost estimates annum
No. (Rs. in lacs)
(Rs. in lacs) 2022-23 2023-24 2024-25
Dust Mitigation Measures 4.6 1.2 1.54 1.53 1.53
1. Air
Stack and DG room 4.0 1.0 -- -- 4.0
200 KLD – Activated Sludge Process Type STP,
2. Water Area Required – approx 150 Sq. m. 40.0 2.0 -- -- 60.0
Dual plumbing system
642 Kg/Day
(Wet waste – 385 Kg/day,
Solid and hazardous
3. Dry waste – 257 Kg/day) 8.0 2.0 -- -- 8.0
waste management
Automatic OWC = 500 kg capacity
Area required – 8.75 Sq.m.
Provision of acoustic enclosures for individual
noise generating construction equipments like
D.G. Set etc.
4. Noise Control 2.0 1.0 2.0 -- --
Servicing of equipments used for construction
activities.
Provision of ear plugs/ear muffs.
The recurring cost would be incurred on hiring
Environment
5. of consultants and payment of various statutory -- 0.2 -- -- --
monitoring
fees to regulatory agencies.
Collection system, treatment and recharge well -
6. Rain water 4.0 0.5 -- 4.0 --
02 nos. P. W.C.
7. Green belt 125 nos. Trees and Lawn Area Development 1.25 0.5 0.42 0.42 0.41

Annexures of Form – 1A Page - 15


“PUSHPAK-2”

Recurring cost per Implementation Plan For


Sr. Capital cost Capital Expenditure
Head Basis for cost estimates annum
No. (Rs. in lacs)
(Rs. in lacs) 2022-23 2023-24 2024-25

Roof Top Solar – 67 KW;


8. Solar Energy 33.5 1.0 -- -- 33.5
Terrace Space require – 522.05 Sq.m.

Provide Fire Fighting Systems as per Fire


Opinion from AUDA and Fire and Safety
9. Fire & Safety 50.0 -- -- 25.0 25.0
Equipment and PPE’s will be provided to
workers during Construction Phase.
Conducting following activities for the
development and beautification of
“Odhav gam lake”
Cleaning
Tree plantation and green belt
Providing solar street lights
Providing sitting arrangements
10. CER Planting of trees and its maintenance and 72.70 -- 20.9 20.9 30.9
providing solar street lighting in ICDS
angan wadi kendra-1 & 18, Odhav within a
radius of 5 km around the project site.
Providing roof top solar panels and their
maintenance in following public schools.
Providing roof top solar panels and their
maintenance in following Health Centers.
11. Amenities Providing of amenities facility for worker 1.0 0.3 1.0 -- --

Total 221.05 9.7 25.86 59.85 135.34

* These expenses will be incurred during period of construction which will commence in year 2022 post grant of environmental clearance from
your Hon. Committee.