The EMP is prepared with a view to facilitate effective environmental management of the project in general and implementation of the
mitigation measures in particular. The mitigation measures for reducing the adverse environmental impacts together constitute a part of
EMP.
The environmental issues, which need management and planning for the construction and operation phases are summarized below:
Excavation and Tarpaulin sheet covers will be used on the materials Traffic will be regulated through
Air quality paving of site to avoid dusting during transportation, storage and proper signage, instruction &
Construction of handling. parking spaces.
building structure Peripheral barricading will be done to prevent dust As per CPCB guideline, adequate
Vehicular movement emission spreading outside the project premises. stack height will be provided.
for transportation of Uniform piling of sand and proper storage to avoid Regular preventive maintenance of
materials and dusting. the DG set will be carried out.
equipment The vehicles having PUCs and spark arrestors will Greenbelt (tree covered and lawn
Super structure only allowed for the transportation. covered green area) will be
(finishing work, Fume generation due to welding and allied activities developed and maintained within/
painting, electrical will be negligible and restricted to project site. around the premises to improve air
work etc.) Dust Mitigation Measures for Construction quality.
Dismantling of Activities: [As per the Gazzete Notification G.S.R.
temporary structure 94(E) dated 25th January, 2018.]
and site cleaning Loose materials like sand, cement or other fine
Various construction Personal protective equipments like earplugs, dust Fire protection system viz. fire
Safety activities masks, nose masks, safety shoes, helmets, hand extinguishers, hydrant system,
Raw material gloves, etc will be provided to all workers. sprinkler system, hose reel, fire
handling and storage All workers will be trained to use welding shields pumps, manually operated electric
Instrument/ and follow safer practice. fire alarm system etc. will be
equipment handling Commit to make provision related to first aid and provided as per National Building
training to be provided to the construction workers. Code of India 2005 (Part 4 – Fire
Maintaining hoists and lifts, lifting machines, and Life Safety) and / local
chains, ropes, and other lifting tackles in good authority requirements.
condition. Such systems will be tested and
“H” frame scaffolds & ladders made of mild steel put into operation and proper care
will be used. will be taken for its effective
Completely Concealed Copper Wiring. operation during emergency, if
All electrical fittings / equipment used will meet any.
the relevant IS standards. A lightning arrester will be
Structural design of the project considering the provided and properly earthed to
seismic zone norms for earthquake resistant prevent damage to the building
structures. when the lightning strikes.
First Aid Box will be made readily available in First aid emergency kits will be
adequate quantity at all the times. provided in adequate quantity at
Sanitation facilities, resting area, drinking water, all the times.
municipal solid waste collection facility etc. will be An underground water storage
provided for construction workers. tank will be provided.
Commit to register the project under “The Building All the lifts have a provision to
& Other Construction Workers (Regulation of ground automatically in case of
Employment and Conditions of Service) Act, 1996”. electricity failure.
Emergency lighting &auto glow
signage will be provided to guide
the people towards exits and
assembly points during
emergency.
Main entry / exit will be separate
and clearly marked. All the
staircases and lifts will open out at
ground level for emergency
evacuation.
* These expenses will be incurred during period of construction which will commence in year 2022 post grant of environmental clearance from
your Hon. Committee.