You are on page 1of 9

c.

v
Abubaker Abdullah Mohammed
Contact No :00966578997056
E-mail address: - ababmoas@yahoo.com
abubaker111987@ gmail.com
linkedin.com/in/abubaker-alsofyani-a246217a

Summary
● A competent senior Mechanical/project /Gas engineer with excellent communication,
organization & coordination skills as well as more than 10 years’ hands on experience in the
Achievement Oil & Gas industry. Involved in Design, Installation, Operations & troubleshooting on
operating plant.
● More than 5 projects in oil and gas (LPG –LNG-SNG- FFS-WTU&IF), power plant, refinery,
Education cement factory and Ice plant.

● M.Sc. – Mechanical engineering- King Saud University- Saudi Arabia-2018.


● B.Sc. In industrial engineering.
● High advanced level in English
● Diploma in computer
Professional
Experience Procurements and project Manager
(NOV 2020 – present).

● Interviews supplier representatives regarding specifications, costs, inspection, and similar problems
relating to technical details and equipment.
● Focusing on procurement as it relates to the field of industrial and engineering, for
overseeing/controlling the acquisition of technical goods and services for industrial operations or
projects.
● Assessments, Evaluation of suppliers ,Negotiation of contracts, Awarding of the contracts
● Managing projects/suppliers .
● Conduct industry research to identify potential suppliers of production lines and industrial
machinery .
● Evaluate suppliers based on products, services, technical specification and prices
● Negotiate contracts/agreements for purchasing of materials Select suppliers; administer contracts
throughout the project.
● Analyze price and technical proposals, , and other data and information to determine reasonable price
and best supplier .
● Formulate policies and procedures for bid proposals and procurement of goods and services.
● Negotiate, renegotiate, and administer contracts with suppliers, vendors, and other representatives.
● Research and evaluate suppliers, based on price, quality, selection, service, support, availability,
reliability, production and distribution capabilities, and the supplier's reputation and history.
● Review catalogs, industry periodicals, directories, trade journals, and Internet sites and consult with
other department personnel to locate necessary goods and services.
● Confer with staff, users, and vendors to discuss defective or unacceptable goods or services and

1
determine corrective action.
● Monitor changes affecting supply and demand, tracking market conditions, price trends, or futures
markets.
● Evaluate and monitor contract performance to ensure compliance with contractual obligations and to
determine need for changes.
● Interview vendors and visit suppliers' plants and distribution centers to examine and learn about
products, services, and prices.
● Write and review product specifications, maintaining a working technical knowledge of the goods or
services to be purchased.
● Developing constructive and cooperative working relationships with others, and maintaining them
over time.
● Analyzing information and evaluating results to choose the best solution and solve problems.
● Providing guidance and expert advice to management or other groups on technical, systems-, or
process-related topics.
● Communicating with people outside the organization, representing the organization to customers, the
public, government, and other external sources .
● Experience in strategic purchasing as well as experience in negotiation and contract design
● Experience in an industrial and manufacturing company, especially in the field of
industrial ,mechanical and process engineering .
● Provide technical details and leadership to sourcing and development of suppliers with respect to
technology, performance, quality, cost, logistics and delivery .
● Work with Engineering (Design and Manufacturing Engineers) team to define process parameters
and criteria to ensure supplier process capability is effective to meet product and process
requirements.
● Keep up with current and developing manufacturing and engineering trends that concern product
quality.
● Comply with the Health, Safety and Environmental Policies .
● Experience in Sourcing, Engineering, Quality, Manufacturing and program management .

PROJECTS MANAGER
Dorar Tammam company –Riyadh -Saudi Arabia
Saudi Arabia (Oct 2018 – oct 2020).

● Manage and monitor projects with respect to: engineering calculation, BOQ, details engineering ,
selection and sizing Gas and firefighting projects regard to tanks, equipment (pumps, compressors),
vaporizers, piping sizing, system and all related items and accessories.
● Technical proposals preparation, pricing and engineering rectification of LPG and firefighting
projects.
● Meet clients, site visit and technical soultion regard to industrial and gas, firefighting, plumbing
projects.
● Supervise civil and mechanical works, piping, welding, hydrotest and purging.
● Follow up and guide equipment’s installation, piping installation as per plant layout drawing
&procedures.
● Review , revise ,modify and submittal of materials and shop drawing .
● Design and supervise firefighting system specification, no of sprinklers, distance ,head ,height ,tank
sizing ,pipe sizing ,pumps selection ,drawing details to commercial and industrial projects .
● Manage and Supervise installation, and commissioning of gas project and related accessories.
● Supervise civil and mechanical works, installation, piping, welding, hydrotest and commissioning.
● Continues development and problems solving related to engineering specifications, installation and
construction of gas projects.
● Monitoring compliance to applicable codes, practices, QA/QC policies, performance standards and
specifications.
● professional and expert with LPG codes, piping codes as per NFPA codes, IGFC, ASME standard, API
and GASCO requirements.
● Highly experience and proficient regard to all safety and LPG project accessories and items.
PROJECTS MANAGER
Company: National Gas Company –Dammam-SAUDI ARABIA
Date: (Dec 2017 – OCT 2018).

● Prepare technical proposals, quotations and engineering rectification of firefighting and LPG projects.
● undertake engineering calculation, BOQ, details engineering and process selection regard to tanks,
equipment (pumps, compressors), vaporizers, piping sizing, gas detection system and all related
accessories.
● Follow up and control Piping fabrication and installation accordingly Specifications, ES Priorities and
available approved Construction Drawings.
● Design and supervise firefighting system specification, no of sprinklers, distance, head, height, tank
capacity sizing, pipe sizing ,pumps selection ,drawing details to commercial and industrial projects .
● Meet clients, site visit and technical offer studies regard to industrial and residential gas projects.
● Manage and Supervise installation, and commissioning of gas project and related accessories.
● Supervise civil and mechanical works, installation, piping, welding, hydrotest and commissioning.
● Continues development and problems solving related to engineering specifications, installation and
construction of gas projects.
● Discuss complicated mechanical problems and make long term restore solutions.
● Monitoring compliance to applicable codes, practices, QA/QC policies, performance standards and
specifications
● Delegated tasks and responsibilities to appropriate personnel.
● professional and expert with LPG codes, piping codes as per NFPA codes, IGFC, ASME standard, API
and GASCO requirements.
Leader of Engineering and maintenance .
Company: ALGANOOB cement company.
Hodeida –Alsaleef (oct 2015-sep 2016).
● Follow up and plan equipment’s installation, piping installation as per plant layout drawing
&procedures.
● Monitor and control corrective action of problems and equipment failures on commissioning and start
up.
● Co-ordinate and schedule activities, track and review progress, evaluate quality and provide feedback.
● Prepare maintenance inspection plan and check lists per each machine related to parameters and
components.
● Carried out and manage technicians on all preventive maintenance requirements (observation,
checking, repairing, replacement, overhaul, calibration, of equipment failure and recommended for
corrective action.
● Prepare preventive maintenance plan of factory unit .
Mechanical supervisor( site, workshop)
Company: TANMIA for oil and construction limited.
Client : YEMEN LNG COMPANY –BALHAF-SABWA (June2014-june 2015).
DEPT : MAINTENANCE SERVICES.
● Supervise, planning and monitor workshop fabrication and site activities installation.
● Interacting daily with the clients to interpret their needs and requirements and representing them in
the field.
● Follow up and control Piping fabrication and installation accordingly Specifications, ES Priorities and
available approved Construction Drawings.
● Responsibility for monitored workmanship quality and taking necessary actions to maintain
satisfactory standards. Preparation Risks assessment and method statement for different hazard
classification zones of MINT activity.
● Ensure team members are working safely and following safe work practices for construction site.
● Prepare drawing and sketches of complicated mechanical/piping activities and submit for approve
and fabrication.
Daily update (WO)work order activities balancing and weekly workload report with planning
department .
● Discuss complicated mechanical problems with PVV ,Inspection dept and sharing long term restore
solutions as: Piping vibration ,piping supports .
● Preparation Risks assessment and method statement for different hazard classification zones of MINT
activity.
● Monitor Materials ,fitting selection for repair maintenance of piping according to specification and
standard .
● Study and analysis items fabrication and installation method to avoid plant equipment conflicts on
erection .
● Follow up equipment reliability ,materials availability and audit recourses request s of needing
materials .
● Monitor and plan manpower and equipment availability accordingly to avoid resources shortage .
● Assist in materials preparation and Supervise fabrications items related E&C Dept of MCHE project
NO #538.Prepare drawing and sketches of complicated mechanical activities and submit for
approve and fabrication .
● Supervise and monitor shutdown activities of fabrication team with day and night shift.
● Weekly to introduce HSE presentation to our fabrication team.
Mechanical site engineer leader
Company: TANMIA for oil and construction limited.
Client : TOTAL Exploration & Production –YEMEN-block 10.
Project scope: CCU Extension project (WTU and IF) (April 2013-May2014).
● Follow up and control Piping fabrication and installation accordingly Specifications, ES Priorities and
available approved Construction Drawings.
● Follow up and control injection facilities pipeline and installation accordingly Specifications, ES
Priorities and available approved Construction Drawings.
● Supervise fabrication, welding and installation injection pipe line to wells according to specification.
● Investigate and solving problems of non-confirm piping and tanks drawing conflicts /as built drawing
and submit TQ modification proposals to SECMOT for Approval on various PVV modifications.
● Check with TOTAL team for punch list comments of PVV to be closed off by final activities clearance .
● Follow up and monitors the latest update of piping drawing (IFC, IFA, AFC) prior to construction.
● Checking by Isometric for the pipng was installed in the correct location, orientation, alignment and
plumpness.
● Monitoring compliance to applicable codes, practices, QA/QC policies, performance standards and
specifications.
● Supervise fabrication and erection of oil skim tank, clean water tank according to specification.
● Responsibility for monitored workmanship quality and taking necessary actions to maintain
satisfactory standards, included the preparation of punch lists and associated rectification programs
● Cooperate and communicate effectively with project manager to provide assistance and technical
support
● Daily coordination for work activities requests with civil, survey, transport, lifting sections.
● Delegated tasks and responsibilities to appropriate personnel.
● Experience certificate as QA\QC supervisor issued by TOTAL.
● In addition to my position lead mechanical supervisor also I work as QA/QC supervisor.
QA /QC mechanical engineer
Company : TANMIA for oil and construction limited
Client : YLNG - SAFER FACILITIES – Marib (Augt 2012-April 2013).
Project scope:
● Addition LPG storages and loading facilities (upstream and downstream).
● Coordinating with Engineering and Construction and liaise with the Client on details engineering
requirements.
● supervise fabrication ,welding and installation LPG pipe line from CPU (upstream to downstream
● LPG bullets) according to specification.
● Supervise and inspect fabrication and welding activities of fire water tank erection.
● Assist Prepared the required (WPSs) and (PQRs) for SMAW and GTAW processes.
● Control and prepare hydro test requirement, and submit RIT for witness, review and approval.
● Inspect and record painting inspection report, touch up report of piping, tanks and old bullets .
● Prepare the daily fit up report, daily welding report and Hydro test Record.
● Supervise commissioning and inspection of odorant injection, loading bye, air receiver and booster
pumps.
● carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning
And Pre-Commissioning requirements for the project.
● piping checking after hydro test to complete the post punch list prior to sign-off the test packages
Before signing the completion of piping / mechanical.
● Guide and monitor fabrication and welding team on leakage repair solution of LPG bullets
commissioning.
● Attend weekly meeting to discuss quality problems and the optimal solution
● Experience certificate as QA\QC engineer issued by YLNG.
● Experience certificate as QA\QC engineer issued by SEPOC.

Mechanical site engineer


Yemen company for sugar refinery project (50000Ton steel weight)
-Offshore - Hodeida .
executed projects:
● Sugar refinery plant project (2000ton/day)- (May. 2011 – Augt 2012)
Piping engineer
● supervise and monitor Piping fabrication and installation accordingly Specifications, Priorities and
Availability of update Construction Drawings.
● Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports Details, orientation
drawings and vendor drawings).
● f low up and inspect workshop activities for pre-fabrication and installation like orientation,
alignment and plumpness Of Piping, (CS, SS) of process refinery plant (25 km length piping) .
● Quantities estimation of activities (structural, piping, pipe support s) was completed by the
contractors.
● Follow up BOQ availability to plan piping fabrication priorities according to materials availability.
● Prepare tenders and cost estimation of fabrication and installation of PVV (piping, tanks, conveyor,
structural, pipe rack and valves, pumps, filters, fan ).
● control NCR fabrication and installation of piping, valves, tanks and guide for corrective action.
● cost estimation and analysis per tendering items by classify measurement unit (M 3 ,M2 ,L.M, lump
sum) .
● Analysis quantities of piping and piping supports and delegated to confident contractors.
● Inspection and approved of all the work quality have been achieved by the subcontractor.
● BOQ preparation of PVV (piping, tanks, fitting, steel grade, pumps, valves).
● Experience Certificate as piping engineer for construction, fabrication, commissioning of refinery
plant that prepared and designed by Desmet company.
site engineer
● Supervise Fabrication More Than 1000 Tons of Hoppers, tanks, cyclone, designed by Desmet &
Thermax Co
● Quantities calculation (Mechanical, Civil) and prepare work tenders of construction (fabrication and
erection)
● Ensure that Fabrication work is in line with applicable quality, technical standard and company
instruction.
● Responsibility for monitored workmanship quality and taking necessary actions to maintain
satisfactory standards.
● prepare BOQ of tanks, equipment, skill and non-skill workers and prepare details
specification of items can’t get by drawing.
● Check, and suggest modification proposals with Thermax regarding to piping, tanks need to be
rectified.
● Supervise Installation, Assembling, Alignment various Equipment and Devices, Cooling Tower,
Mixers, Tanks, Pumps, Heat Exchangers, compressors, Air preheated and economizer unit.
● Prepare punch list regarding to fabrication and guide contractors to close them off.
● Assist in solving Piping Problems, piping clash and Technical Problems in the plant.
Site engineer
● Power plant project and WTU (July. 2010 –May. 2011)
scope of work:
● Monitor action of welding technology SMAW, GTAW, and finding solutions to welding problems.
● Supervise, guide and direct erection and fabrication of air preheated and economizer units.
● Coordination with the clients regarding to TQ investigating of piping need to be rectify.
● cost estimation of fabrication and installation per items by classify measurement unit (M 3 ,M2 ,L.M,
lump sum) and direct mounting to subcontractors .
● supervise and monitor fabrication, painting of Tanks, piping and power plant chimney.
● Responsibility of monitoring the fabrication shop to insure the quality of piping fabrications, welding,
implementation of the required NDE, and Hydrostatic testing in accordance with the codes and
standards.
● cost and quantities estimation of painting works ,sand blast works and insulation work of tanks ,
and piping.
● Inspect and monitor fit up piping preparation, welding techniques of SS,CS .
● supervise ,inspect and make approval for fabricated tanks such (plumpness report, leveling report,
Roundness report ,hydrostatic test record.) .
● Lead & motivated Teams of Work: Fabrication Team, Piping Team, Erection Team and
supervise more than 10 contractors for different services.
inspection, commissioning of power plant that prepared and design by THERMAX Co.
Civil site supervisor
Social fund for development –Taiz 2009-2010.
● Undertake check and monitors quality of work and materials.
● Prepare daily and weekly reports of skills and no skills workers and materials.
● Quantity estimation of implemented activities and submit to the consultant engineer.
● Make recommendation and punch list of activities need to be rectify.
● Guide and monitor specification implement and quality assurance.
● Prepare and control all documents of activities and tasks.

Professio
nal ● Prepare for course training for CSWIP 3.1
● prepare for course training (integration of Piping inspection) API 570, pressure vessels inspection
Training API510
● Intensive Labor Work Project-methods and implement: SFD-Taiz – Yemen.
● Project Management (Raining Water Collection Project: SFD-Taiz – Yemen.
● QA and projects management training course of consultant’s engineers - SFD-Taiz – Yemen.
● Maintenance program, : Taiz – Yemen
● Electric Generators(AC/DC): Taiz – Yemen
● Pumps types –Taiz

Experienc ● Lead and manage mechanical work: piping, structural, tanks.


e ● Quality inspection techniques (NDT, DT).
● Risk assessment ,permit to work ,job safety analysis ,method statement .
● Experience in stress analysis of (piping, structural, tanks, supports).
● Non confirorm report -as built drawing -TQ .
● BOQ -Bids analysis ,technical proposal .
● Inspection codes of PVV.
● BOM preparation for PVV.
● Expert with LPG: NFPA54 , 58, IFGC ,gas detection , items and all related accessories regard to
industrial and commercial gas system .
● Design, engineering calculation of sprinklers and firefighting system- FM200 .
● Design and calculation of Fire and Gas detections, control panel and alarm system.
● Familiar and expert with firefighting systems standards and codes
● Feasibility study of project /piping.
● Design, selection and calculation of: pumps, compressor, piping ,tanks of LPG ,FFS and all related
● Manage and monitor LPG project, firefighting, plumbing, gas and fire detection system, Gas alarm
detection system, fire alarm detection system .
● selection and sizing of piping ,valves ,vessels ,tanks .
● Metallurgy and strength of materials.
● experience with types of (pumps, compressors, valves, heat exchanger dryers, cooling tower, agitators
and mixers, conveyor, filters, blowers.fan,) .
● civil work design and analysis (foundations,columns,beams,slabs) .
● NFPA Codes: (1314,20,53, 54 ,57 ,58,70)
Skills ● Piping inspection API 570 ,574, Tanks inspection API 653, pressure vessels inspection API510, 572.
● Experience with ASME codes and design parameters :
-ASME design code of PVV (B31.1,B31.3,B31.4,B31.8, VIII, II-A,C ,IX, V )
● Experience with ASTM standard .
● Experience with API codes :
● -API(5L ,6D,520,570,1104,1107,1110,610, 650,620 ,598,) .
● Experience with AWS codes :
-AWS(D1.1,A5.1,A5.5,A5.4,A5.9 A5.17,A5.18, A5.27,A5.28), EN .
● surface preparation and painting procedures.
● Familiar with PLC,DCS, CNC.

● Reliable ,organize with a good leadership.


● Methods statements, procedures and risk assessment preparation.
● Failure modes effects and analysis (FMEA).
● Interpret complex mechanical and technical drawings.
Safety ● Estimate and recourses planning 4m(man, machine, materials, methods) .
● Continuous improvement techniques (PDCA, DAMIC, 5W,5S, ).
training ● PID, PFD and plant layout.
● AutoCAD (2D-3D)
● Primavera- Microsoft project program.
● HSE (TOTAL Yemen, YLNG Mass training 1,2,3Weekly Tanmia HSE presentation ).
● Simulation(modeling)& numerical programs (Mintab, Arena, Input Analyzer).
● knowledge with rules and procedures of :SEPOC ,TOTAL ,YLNG .

● Confined space
● Work at height
● Postures-Gestures-Tools
● PPE
● Permit to work
● Lifting
● Powered System
● -Management Change
● Fall Protection
● First Aid Awareness Training
● Hazardous Waste Management
● Firefighting training
● Manual Handling
● Risk based inspection
● Heat Stress

Language Arabic : fluent


English: Excellent –high advanced level (verbal and writing ).

Reference Available upon request

Recommendation: please see my profile on LinkedIn

-Recommendation paragraph linkedin.com/in/abubaker-alsofyani-a246217a

You might also like