You are on page 1of 5

*Harga Online *Harga Offline

No. Kode Daftar Pelatihan Durasi JUL AGUST SEPT OKT NOV DES
Class Class
1 KMP.001 Ahli K3 Muda 4,500,000 5,000,000 4 hari 11 sd 14 8 sd 11 12 sd 15 10 sd 13 1 sd 4 5 sd 8
2 KMP.002 Ahli K3 Madya 5,000,000 5,500,000 4 hari 11 sd 14 8 sd 11 12 sd 15 10 sd 13 1 sd 4 5 sd 8
3 KMP.003 Ahli K3 Umum 5,500,000 6,500,000 4 hari 11 sd 14 8 sd 11 12 sd 15 10 sd 13 1 sd 4 5 sd 8
4 KMP.004 Operator K3 Migas 5,500,000 6,500,000 4 hari 18 sd 21 15 sd 18 5 sd 8 17 sd 20 2 sd 5 7 sd 10
5 KMP.005 Pengawas K3 Migas 6,500,000 7,500,000 4 hari 18 sd 21 15 sd 18 5 sd 8 17 sd 20 2 sd 5 7 sd 10
6 KMP.006 Pengawas Utama K3 Migas 8,500,000 9,500,000 6 hari 18 sd 23 15 sd 20 5 sd 11 17 sd 22 7 sd 12 12 sd 17
7 KMP.007 Authorized Gas Tester 5,500,000 6,500,000 3 hari 20 sd 22 8 sd 10 7 sd 9 3 sd 5 7 sd 9 1 sd 3
8 KMP.008 Fireman I 5,000,000 5,500,000 3 hari 4 sd 6 3 sd 5 7 sd 9 5 sd 7 9 sd 11 6 sd 8
9 KMP.009 Fireman II 5,500,000 6,000,000 3 hari 4 sd 6 3 sd 5 7 sd 9 5 sd 7 9 sd 11 6 sd 8
10 KMP.010 Fireman Officer 6,000,000 6,500,000 3 hari 4 sd 6 3 sd 5 7 sd 9 5 sd 7 9 sd 11 6 sd 8
11 KMP.011 Fire Safety Manager 15,500,000 17,500,000 6 hari 4 sd 9 8 sd 13 19 sd 24 17 sd 22 14 sd 18 26 sd 31
12 KMP.012 Insiden Commander 5,500,000 6,500,000 3 hari 27 sd 29 24 sd 26 28 sd 30 24 sd 26 21 sd 23 19 sd 21
13 KMP.013 Internal Auditor SMK3 6,500,000 7,500,000 3 hari 13 sd 15 3 sd 5 28 sd 30 26 sd 28 14 sd 16 13 sd 15
14 KMP.014 Auditor SMK3 5,500,000 6,500,000 4 hari 12 sd 15 17 sd 20 5 sd 9 26 sd 29 15 sd 18 13 sd 16
15 KMP.015 HAZOPs 6,000,000 7,000,000 3 hari 13 sd 15 8 sd 10 1 sd 3 26 sd 28 21 sd 23 14 sd 16
16 KMP.016 Safety Inspector 6,500,000 7,500,000 4 hari 11 sd 14 3 sd 6 21 sd 24 17 sd 20 9 sd 11 14 sd 17
17 KMP.017 Investigasi Insiden 4,500,000 5,500,000 3 hari 18 sd 20 10 sd 12 21 sd 23 10 sd 12 23 sd 25 14 sd 16
18 KMP.018 Petugas P3K 5,500,000 6,500,000 3 hari 13 sd 15 15 sd 16 12 sd 14 26 sd 28 16 sd 18 19 sd 21
19 KMP.019 Safetyman Migas 5,500,000 6,500,000 3 hari 18 sd 20 22 sd 25 21 sd 23 17 sd 19 23 sd 25 26 sd 28
20 KMP.020 Safetyman Umum 4,500,000 5,500,000 3 hari 18 sd 20 22 sd 25 21 sd 23 17 sd 19 23 sd 25 26 sd 28
21 KMP.021 Industrial Higiene Muda 5,500,000 6,500,000 4 hari 25 sd 28 15 sd 18 26 sd 29 10 sd 13 23 sd 26 26 sd 29
22 KMP.022 Industrial Higiene Madya 6,000,000 7,000,000 4 hari 25 sd 28 8 sd 11 7 sd 10 12 sd 15 21 sd 24 19 sd 23
23 KMP.023 Industrial Higiene Utama 7,000,000 7,500,000 5 hari 4 sd 8 8 sd 12 12 sd 16 17 sd 21 14 sd 18 26 sd 30
24 KMP.024 Petugas Fasilitas K3 Kesehatan 5,500,000 6,500,000 4 hari 25 sd 28 22 sd 25 21 sd 24 24 sd 27 21 sd 24 12 sd 16
25 KMP.025 Petugas K3 Laboratorium 5,500,000 6,500,000 4 hari 18 sd 21 15 sd 18 19 sd 22 26 sd 29 23 sd 25 19 sd 23
26 KMP.026 Pengawas SMK3 Kontraktor (CSMS) 4,500,000 5,500,000 3 hari 25 sd 27 17 sd 19 21 sd 23 24 sd 26 28 sd 30 12 sd 14
27 KMP.027 Petugas Penanganan Bahaya Gas H2S 5,500,000 6,500,000 3 hari 20 sd 22 24 sd 26 21 sd 23 17 sd 19 2 sd 4 5 sd 7
28 KMP.028 Kajian Resiko Kesehatan Kerja 5,500,000 6,500,000 4 hari 25 sd 28 23 sd 26 5 sd 8 18 sd 21 7 sd 10 26 sd 29
29 KMP.029 Ahli Supervisor K3 Konstruksi 5,500,000 6,500,000 4 hari 26 sd 29 16 sd 19 7 sd 10 19 sd 22 8 sd 11 5 sd 8
30 KMP.030 Ahli Muda K3 Konstruksi 5,500,000 6,500,000 4 hari 25 sd 28 9 sd 12 5 sd 8 17 sd 20 14 sd 17 6 sd 9
31 KMP.031 Ahli Madya K3 Konstruksi 6,000,000 7,000,000 5 hari 25 sd 29 22 sd 26 12 sd 16 24 sd 28 21 sd 25 26 sd 30
32 KMP.032 Ahli Utama K3 Konstruksi 7,000,000 7,500,000 5 hari 25 sd 29 8 sd 12 12 sd 16 24 sd 28 7 sd 11 26 sd 30
33 KMP.033 Ahli Muda Ruang Terbatas 6,000,000 7,000,000 3 hari 18 sd 20 1 sd 3 28 sd 30 10 sd 12 2 sd 4 27 sd 29
34 KMP.034 Ahli Madya Ruang Terbatas 6,500,000 7,500,000 3 hari 18 sd 20 1 sd 3 28 sd 30 3 sd 5 7 sd 9 27 sd 29
SERTIFIKASI OPERATOR, TEKNISI – BNSP
*Harga Online *Harga Offline
No. Kode Daftar Pelatihan Durasi
Class Class
35 KMP.035 Teknisi Ruang Terbatas-Confined Space 5,500,000 6,500,000 3 hari 18 sd 20 8 sd 10 28 sd 30 3 sd 5 9 sd 11 5 sd 7
36 KMP.036 Teknisi Ketinggian-WAH 5,500,000 6,500,000 3 hari 5 sd 7 16 sd 18 5 sd 7 5 sd 7 14 sd 16 6 sd 8
37 KMP.037 Rigging 5,500,000 6,500,000 3 hari 4 sd 6 3 sd 5 7 sd 9 5 sd 7 14 sd 16 6 sd 8
38 KMP.038 Operator Kran Mobil (Mobile Crane) 7,000,000 7,500,000 4 hari 25 sd 28 17 sd 20 5 sd 8 3 sd 6 7 sd 10 12 sd 15
39 KMP.039 Operator Kran Putar Tetap (Pedestal Crane) 7,000,000 7,500,000 4 hari 25 sd 28 17 sd 20 6 sd 9 3 sd 6 9 sd 12 12 sd 15
40 KMP.040 Operator Kran Jembatan (Overhead Crane) 7,000,000 7,500,000 4 hari 25 sd 28 17 sd 20 6 sd 9 3 sd 6 15 sd 18 12 sd 15
41 KMP.041 Operator Forklift 7,000,000 7,500,000 3 hari 13 sd 15 10 sd 12 7 sd 9 12 sd 14 22 sd 24 12 sd 14
42 KMP.042 Operator Scaffolding 7,000,000 7,500,000 3 hari 18 sd 20 22 sd 24 28 sd 30 12 sd 14 16 sd 18 12 sd 14
43 KMP.043 Operator Boiler 7,500,000 8,500,000 4 hari 5 sd 8 9 sd 12 28 sd 31 18 sd 21 14 sd 17 13 sd 16
44 KMP.044 Operasi Produksi 7,900,000 8,900,000 4 hari 25 sd 28 15 sd 18 19 sd 22 19 sd 22 21 sd 24 14 sd 17
45 KMP.045 Operator Perawatan Sumur 7,900,000 8,900,000 4 hari 11 sd 14 8 sd 11 26 sd 29 19 sd 22 23 sd 27 19 sd 23
46 KMP.046 Operator Blending 7,900,000 8,900,000 4 hari 26 sd 29 16 sd 19 12 sd 15 25 sd 28 22 sd 25 26 sd 30
47 KMP.047 Operator Pemrosesan Gas Bumi 7,900,000 8,900,000 4 hari 11 sd 14 16 sd 19 14 sd 17 26 sd 29 21 sd 24 19 sd 23
48 KMP.048 Operator Uji Lab Minyak 7,900,000 8,900,000 4 hari 11 sd 14 8 sd 11 14 sd 17 26 sd 29 23 sd 26 19 sd 23
49 KMP.049 Operator Uji Lab Gas Bumi 7,900,000 8,900,000 4 hari 11 sd 14 8 sd 11 14 sd 17 26 sd 29 23 sd 26 19 sd 23
50 KMP.050 Operator Uji Lab Petrokimia 7,900,000 8,900,000 4 hari 11 sd 14 8 sd 11 14 sd 17 26 sd 29 23 sd 26 19 sd 23
51 KMP.051 Operator Uji Lab Pelumas 7,900,000 8,900,000 4 hari 11 sd 14 8 sd 11 14 sd 17 26 sd 29 23 sd 26 19 sd 23
52 KMP.052 Operator Uji Lab BBM 7,900,000 8,900,000 4 hari 11 sd 14 8 sd 11 14 sd 17 26 sd 29 23 sd 26 19 sd 23
53 KMP.053 Operator Pengambilan Contoh Minyak dan Gas Bumi 7,900,000 8,900,000 4 hari 11 sd 14 8 sd 11 14 sd 17 26 sd 29 23 sd 26 19 sd 23

54 KMP.054 Operator Pengambilan Contoh BBM, BBN, dan Pelumas 7,900,000 8,900,000 4 hari 18 sd 21 15 sd 18 14 sd 17 25 sd 28 24 sd 27 26 sd 29
55 KMP.055 Juru Bor Seismic 8,500,000 9,500,000 4 hari 4 sd 7 2 sd 5 5 sd 8 24 sd 20 14 sd 17 12 sd 15
56 KMP.056 Juru Tanam Seismic 8,500,000 9,500,000 4 hari 4 sd 7 2 sd 5 5 sd 8 24 sd 20 14 sd 17 26 sd 29
57 KMP.057 Juru Tembak Seismic 8,500,000 9,500,000 4 hari 4 sd 7 2 sd 5 5 sd 8 24 sd 20 14 sd 17 26 sd 29
58 KMP.058 Juru Ukur Seismic 8,500,000 9,500,000 4 hari 4 sd 7 2 sd 5 5 sd 8 24 sd 20 14 sd 17 26 sd 29
59 KMP.059 Juru Aduk Fluida Pengeboran 8,500,000 9,500,000 4 hari 4 sd 7 2 sd 5 5 sd 8 24 sd 20 14 sd 17 26 sd 29
60 KMP.060 Marine Guard 9,000,000 9,900,000 5 hari 25 sd 29 22 sd 26 5 sd 9 24 sd 21 14 sd 18 12 sd 16
61 KMP.061 Quality Control Scaffolding 7,500,000 8,500,000 3 hari 4 sd 8 16 sd 18 7 sd 9 25 sd 27 28 sd 30 5 sd 7
62 KMP.062 Teknisi and Maintenance Scaffolding 7,500,000 8,500,000 3 hari 19 sd 21 9 sd 11 7 sd 9 26 sd 28 14 sd 16 13 sd 15
63 KMP.063 Teknisi Instrumentasi 7,500,000 8,500,000 4 hari 4 sd 7 8 sd 11 5 sd 8 24 sd 27 16 sd 19 12 sd 25
64 KMP.064 Teknisi Sistem Pembangkit Migas 8,500,000 9,500,000 5 hari 4 sd 8 8 sd 12 5 sd 9 24 sd 28 21 sd 25 5 sd 9
65 KMP.065 Teknisi Sistem Distribusi Migas 8,500,000 9,500,000 5 hari 11 sd 15 15 sd 19 12 sd 16 10 sd 14 7 sd 11 6 sd 10
66 KMP.066 Teknisi Sistem Utilitas Migas 8,500,000 9,500,000 5 hari 25 sd 29 22 sd 26 19 sd 23 11 sd 15 7 sd 11 6 sd 10
67 KMP.067 Teknisi Perawatan Mekanik 7,500,000 8,500,000 4 hari 25 sd 28 22 sd 25 26 sd 29 3 sd 6 7 sd 11 6 sd 10
68 KMP.068 Teknisi Pressure Relieve Device 8,500,000 9,500,000 4 hari 18 sd 21 15 sd 18 21 sd 24 25 sd 28 7 sd 11 6 sd 10
69 KMP.069 Teknisi Operasi Yunior CDU 8,500,000 9,500,000 4 hari 11 sd 14 8 sd 11 21 sd 24 4 sd 7 7 sd 11 6 sd 10
70 KMP.070 Driller 8,500,000 9,500,000 5 hari 25 sd 29 22 sd 26 19 sd 23 17 sd 21 21 sd 25 12 sd 16
71 KMP.071 Tool Pusher 9,500,000 10,500,000 6 hari 25 sd 31 15 sd 20 19 sd 24 17 sd 22 21 sd 26 12 sd17
72 KMP.072 Pipe Fitter 8,500,000 9,500,000 4 hari 4 sd 7 8 sd 11 12 sd 15 24 sd 27 7 sd 10 6 sd 9
73 KMP.073 Pengukur Isi Tangki Minyak Bumi dan Hasil Olahan 8,500,000 9,500,000 4 hari 11 sd 14 15 sd 18 27 sd 30 17 sd 20 8 sd 11 6 sd 9
74 KMP.074 Mud Logger Wellsite Geology 8,500,000 9,500,000 4 hari 25 sd 28 22 sd 25 21 sd 24 10 sd 13 22 sd 26 19 sd 23
75 KMP.075 Pressure Engineer Wellsite Geology 8,500,000 9,500,000 5 hari 11 sd 15 15 sd 19 5 sd 9 24 sd 28 21 sd 25 26 sd 30
76 KMP.076 Wellsite Geologist 8,500,000 9,500,000 6 hari 4 sd 9 8 sd 13 12 sd 17 24 sd 29 21 sd 26 12 sd 17
77 KMP.077 Loading Master 8,500,000 9,500,000 3 hari 18 sd 20 16 sd 18 28 sd 30 25 sd 27 7 sd 9 12 sd 15
78 KMP.078 Welder SMAW / GMAW kls 1 (5G - 6G) - 14,500,000 4 hari 25 sd 28 22 sd 25 19 sd 22 24 sd 27 8 sd 11 7 sd 10
79 KMP.079 Welder SMAW / GMAW kls 2 (3G - 5G) - 13,500,000 4 hari 18 sd 21 22 sd 25 19 sd 22 24 sd 27 8 sd 11 7 sd 10
80 KMP.080 Welder SMAW / GMAW kls 1 (1G - 2G) - 12,500,000 4 hari 4 sd 7 22 sd 25 19 sd 22 24 sd 27 8 sd 11 7 sd 10
SERTIFIKASI PENGAWAS, INSPECTOR – BNSP
*Harga Online *Harga Offline
No. Kode Daftar Pelatihan Durasi
Class Class
78 KMP.078 Supervisor Teknisi Listrik Migas 9,900,000 10,900,000 6 hari 11 sd 16 15 sd 20 5 sd 10 3 sd 8 21 sd 26 12 sd 17
79 KMP.079 Supervisor Perawatan Mekanik 9,900,000 10,900,000 6 hari 18 sd 23 22 sd 27 12 sd 17 17 sd 22 21 sd 26 5 sd 10
80 KMP.080 Pengawas / Inspector Scaffolding 9,500,000 10,500,000 3 hari 19 sd 21 8 sd 10 7 sd 9 3 sd 5 7 sd 9 6 sd 8
81 KMP.081 Pengawas Operasi Produksi 9,500,000 10,500,000 5 hari 25 sd 29 22 sd 26 19 sd 23 25 sd 29 7 sd 11 26 sd 30
82 KMP.082 Pengawas Instrumentasi 9,500,000 10,500,000 5 hari 18 sd 22 15 sd 19 5 sd 9 4 sd 8 14 sd 18 5 sd 9
83 KMP.083 Pengawas Operasi Boiler 9,500,000 10,500,000 5 hari 11 sd 15 8 sd 12 12 sd 16 10 sd 14 14 sd 18 5 sd 9
84 KMP.084 Pengawas Pressure Relieve Device 9,900,000 10,900,000 6 hari 11 sd 16 15 sd 20 12 sd 17 3 sd 8 7 sd 12 5 sd 10
85 KMP.085 Ahli Rekam Seismic 9,500,000 10,500,000 4 hari 11 sd 14 15 sd 18 19 sd 22 17 sd 20 14 sd 17 13 sd 16
86 KMP.086 Ahli Topografi Seismik 9,500,000 10,500,000 4 hari 11 sd 14 15 sd 18 19 sd 22 17 sd 20 14 sd 17 13 sd 16
87 KMP.087 Ahli Fluida Pengeboran 9,500,000 10,500,000 5 hari 18 sd 22 22 sd 26 19 sd 23 24 sd 28 21 sd 25 26 sd 30
88 KMP.088 Rig Inspector 11,000,000 12,500,000 6 hari 25 sd 30 22 sd 27 5 sd 10 3 sd 8 21 sd 26 12 sd 17
89 KMP.089 Welding Inspector 14,500,000 23,500,000 12 hari 18 sd 30 15 sd 27 5 sd 17 17 sd 29 14 sd 26 5 sd 17
90 KMP.090 Inspektur Crane 11,000,000 12,500,000 4 hari 25 sd 26 22 sd 25 5 sd 8 3 sd 6 1 sd 4 6 sd 9
91 KMP.091 Inspektur Bejana Tekan 11,000,000 12,500,000 6 hari 4 sd 9 8 sd 13 19 sd 24 17 sd 22 14 sd 19 12 sd 17
92 KMP.092 Inspektur Handak 11,000,000 12,500,000 6 hari 4 sd 9 8 sd 13 19 sd 24 17 sd 22 14 sd 19 12 sd 17
93 KMP.093 Ispektur Pipa Penyalur 11,000,000 12,500,000 6 hari 4 sd 9 8 sd 13 19 sd 24 17 sd 22 14 sd 19 12 sd 17
94 KMP.094 Inspektur Rotating Equipment 11,000,000 12,500,000 6 hari 4 sd 9 8 sd 13 19 sd 24 17 sd 22 14 sd 19 12 sd 17
95 KMP.095 Inspektur Tanki Timbun 11,000,000 12,500,000 6 hari 11 sd 16 15 sd 20 19 sd 24 10 sd 15 7 sd 12 5 sd 10
96 KMP.096 Inspektur SKPI 11,000,000 12,500,000 6 hari 11 sd 16 15 sd 20 19 sd 24 10 sd 15 7 sd 12 5 sd 10
97 KMP.097 Ahli K3 Listrik 11,000,000 12,500,000 4 hari 18 sd 23 15 sd 20 26 sd 29 3 sd 8 21 sd 24 19 sd 23
98 KMP.098 Inspektur Platfoam 11,000,000 12,500,000 6 hari 18 sd 23 15 sd 20 19 sd 24 17 sd 22 21 sd 26 12 sd 17
99 KMP.099 RBI Basic Level 1 11,000,000 12,500,000 6 hari 18 sd 23 22 sd 27 19 sd 24 3 sd 8 21 sd 26 12 sd 17
100 KMP.100 RBI Engineer Level 1 11,000,000 12,500,000 6 hari 25 sd 30 22 sd 27 19 sd 24 3 sd 8 21 sd 26 12 sd 17
101 KMP.101 Teknisi K3 Listrik 5,500,000 6,500,000 4 hari 18 sd 23 15 sd 20 26 sd 29 3 sd 8 21 sd 24 13 sd 16
SERTIFIKASI K3 PERTAMBANGAN
*Harga Online *Harga Offline
No. Kode Daftar Pelatihan Durasi
Class Class
Dasar-Dasar K3L Pertambangan (Workhop K3
102 KMP.102 5,500,000 6,500,000 3 hari 5 sd 7 3 sd 5 14 sd 16 19 sd 21 28 sd 30 13 sd 15
Pertambangan)
103 KMP.103 Pengawas Pertambangan Tingkat Pertama (POP) 5,900,000 7,500,000 4 hari 25 sd 28 22 sd 25 27 sd 30 17 sd 20 15 sd 18 13 sd 16
104 KMP.104 Pengawas Pertambangan Tingkat Madya (POM) 6,900,000 8,500,000 4 hari 25 sd 28 22 sd 25 27 sd 30 17 sd 20 15 sd 18 13 sd 16
105 KMP.105 Pengawas Pertambangan Tingkat Utama (POU) - 12,000,000 5 hari 11 sd 15 22 sd 25 27 sd 30 17 sd 20 15 sd 18 13 sd 16
Pengelola K3 Pertambangan (Safety Officer untuk
106 KMP.106 6,900,000 8,500,000 3 hari 13 sd 15 10 sd 12 27 sd 30 24 sd 26 7 sd 9 5 sd 7
Pertambangan)

106 KMP.107 Sistem Manajemen Keselamatan Pertambangan (SMKP) 6,900,000 8,500,000 3 hari 4 sd 6 8 sd 10 14 sd 16 26 sd 28 28 sd 30 26 sd 28

SERTIFIKASI KOMPETENSI TENAGA TEKNIK KETENAGALISTRIKAN – ESDM


*Harga Online *Harga Offline
No. Kode Daftar Pelatihan Durasi
Class Class
Bidang Pembangkit Tenaga Listrik
• Konsultansi Perencanaan
• Konsultansi Pengawasan
• Pembangunan dan Pemasangan
107 KMP.107 Rp 9,000,000 Rp 10,500,000 4 hari 4 sd 7 2 sd 5 21 sd 24 18 sd 21 14 sd 17 12 sd 15
• Pemeriksaan dan Pengujian
• Pengoperasian
• Pemeliharaan

Bidang Transmisi Tenaga Listrik


• Konsultansi Perencanaan
• Konsultansi Pengawasan
• Pembangunan dan Pemasangan
108 KMP.108 Rp 9,000,000 Rp 10,500,000 4 hari 26 sd 29 23 sd 26 26 sd 29 24 sd 27 14 sd 17 12 sd 15
• Pemeriksaan dan Pengujian
• Pengoperasian
• Pemeliharaan
Bidang Distribusi Tenaga Listrik
• Konsultansi Perencanaan
• Konsultansi Pengawasan
• Pembangunan dan Pemasangan
109 KMP.109 Rp 9,000,000 Rp 10,500,000 4 hari 25 sd 28 22 sd 25 26 sd 29 24 sd 27 14 sd 17 12 sd 15
• Pemeriksaan dan Pengujian
• Pengoperasian
• Pemeliharaan

Bidang Instalasi Pemanfaatan Tenaga Listrik


• Konsultansi Perencanaan
• Konsultansi Pengawasan
110 KMP.110 • Pembangunan dan Pemasangan Rp 9,000,000 Rp 10,500,000 4 hari 18 sd 21 8 sd 11 20 sd 23 24 sd 27 14 sd 17 12 sd 15
• Pemeriksaan dan Pengujian
• Pemeliharaan

You might also like