You are on page 1of 1

Point of ○ Run CPU ○ DI2, DS4

TCD - 042 CNV Over Current(DI4) Application


Detection ● Speed CPU ● DI4
[Actions to take]
[Meaning]
1. Verify if power voltage R,S, and T are connected to PT1.
When the current of the motor exceeds limit. Switching is stopped to prevent motor and 1) For 380V, R-phase power →PT1-3, S-phase→PT1-7, T-phase→PT1-11
IGBT damage.
2) For 400V, R-phase power →PT1-4, S-phase→PT1-8, T-phase→PT1-12

[Diagram] 3) For 346V, R-phase power →PT1-2, S-phase→PT1-6, T-phase→PT1-10


2. Verify if second side of PT1 is connected to DPP-310 PCB.
CONV
( PT1-21→PP1, PT1-22→ PP4, PT1-23→PP3)
3. Verify if the optical cable of DPC-300 PCB R+,R-,S+,S-,T+,T- are well
R
R connected to R,S,T stack and DPP-300 PCB & IGBT FG PCB are well
S
S
T connected to each other.(Refer to TCD43, 44, 45).
4. Verify if HCT cable is well connected to VBC in DPC-300(Verify if U-phase
cable is connected to U-phase HCT and V-phase to V-phase HCT).
5. Check HCT power +15V and -15V.
6. Check DPC-300 PCB OC level voltage( Normally, F16 IC(LM293)
No. 5 voltage is 9.03V ±0.05.).
DPP-300 R stack DPP-300 S stack DPP-300 T stack
CONV+ CONV- CONV+ CONV- CONV+ CONV- 7. Check the HCT direction(Normally, HCT is directed downward (⇒))
Optical 8. Check IGBT.
광케이블
Cable
9. Replace DPP-300 PCB.
10. Replace DPC-300 PCB.
R+ R- S+ S- T+ T-
DPC-300
OPT2 P15 P5
GND -15V [How to inspect IGBT]
R94
Signal +15V R148 Be sure to open the resistance of FG PCB attached to IGBT before inspection.
5 + CONV-OC
F16
- R103
VBC-3
HCT 3 4 1 2
R96
R95 C64
Connector
커넥터 VBC-7
Condition + - Analog Tester Digital Tester

C1-C2E1 C2E1 G ∞ ∞
HCT
Short G C2E1 ∞ ∞

G-C2E1 C2E1 C1 ∞ Around 10k Ω


Short C1 C2E1 10Ω or less ∞

C2E1-E2 E2 G ∞ ∞
Short G E2 ∞ ∞

G-E2 E2 C2E1 ∞ Around 10k Ω


Short C2E1 E2 10Ω or less ∞