You are on page 1of 2

Job Hazard Analysis

Job:
Installation of Water Pump
. Manila Bay Thread Corporation
Department or location: 107 Lopez Jaena Street, Brgy Tanong, Marikina City
Igloo Supply Chain Philippines

Task or Step Hazards Controls

Dismantling of Pole Hazard in using chainsaw Observe proper handling of tools

Welding of Pipes Worker has a hazard of welding residues Use full face welding masks for eye protection

Heavy water pump can injure the worker Observe proper handling techniques and a spotter is required
Installation of Water Pump carrying it to guide the lifters

Manila Bay Spinning Mills, Inc.


JHA by:

June 16, 2022


Date:
List of Tools: List of Vehicles:

1. Portable Welding Machine 1. Boom Truck – CAE 8017

2. 1 Roll - Extension Wire 2. Manlift – RME 279

3. 1 Set – Cutting Outfit

4. 2 Pcs – Open Wrench

5. Chainsaw

List of Personnel: Scope of Works:

1. Engr. Rogelio Bangloy 1. Dismantling of Pole

2. Ramer Benedicto 2. Welding of Pipes

3. Junel Apan 3. Installation of Water Pump

4. Romel Plaza

5. Jully Berdera

6. Joven Gecoso

You might also like