M BOOK OF VENADAR BANK BUILDING

Sl No Description No L B D CF Quantity Remark

1 CIVIL WORKS

5.9.5
10 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams,
girders bressumers and cantilevers
GF beams sides (B1C1,B2C2,B4C4,B6C6) 8 3.08 0.38 9.363
GF beams sides (C1D1,C3D3,C6D6) 6 3.38 0.38 7.706
GF beams sides (D1E1,D3E3,D6E6) 6 3.41 0.38 7.775
GF beams sides (E1F1,E3F3,E5F5,E6F6) 8 3.97 0.38 12.069
GF beams sides (B1B6,C1C6) 4 9.46 0.38 14.379
GF beams sides (D1D6) 2 10.01 0.38 7.608
GF beams sides (E1E6) 2 9.71 0.38 7.380
GF beams sides (F1F6) 2 9.96 0.38 7.570
Cantilever beam 10 0.9 0.25 2.250
Cantilever end cap 5 0.25 0.25 0.313
pillar sides 4 1 0.38 1.520
pillar sides 6 0.8 0.38 1.824
pillar sides 2 0.7 0.38 0.532
pillar sides 1 0.4 0.38 0.152
pillar sides 1 0.45 0.38 0.171
pillar sides 1 0.5 0.38 0.190
pillar sides 4 0.6 0.38 0.912
Net Total Quantity 81.714

5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access
13
platform

GF slab area 1 15.15 12.31 186.497


GF slab area side 1 62.88 0.12 7.546
Net Total Quantity 194.043
5.22.6
18 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically
Treated bars of grade Fe-500D or more

column C1 16 mm 30 0.500 1.580 23.700

column C2 16 mm 52 0.500 1.580 41.080

column C3 16 mm 52 0.500 0.889 23.114

column LAP 16 MM 44 0.800 1.580 55.616

column LAP 12MM 44 0.700 0.889 27.381

column LAP 16mm 30 0.800 1.580 37.920

column LAP 16mm 8 0.800 1.580 10.112

strong room wall 0.000

outer vertical 10 mm 70 0.500 0.617 21.595

inner vertical 10 mm 57 0.500 0.617 17.585

horizontal outer 10 mm 4 10.620 0.617 26.210

horizontal inner 10 mm 4 10.620 0.617 26.210

Beam B2( B1F1,B6F6) 0.000

TOP& BOTTOM 16 MM 8 15.140 1.580 191.370

LAP 16 MM 8 0.800 1.580 10.112

END TOP 16 MM 8 1.800 1.580 22.752

END TOP 16 MM 12 3.200 1.580 60.672


MID BOTTOM 16 MM 16 1.800 1.580 45.504

STIRRUPS 8MM 196 1.200 0.395 92.904

Beam B2( B2C2,B4C4) 0.000

TOP& BOTTOM 16 MM 8 3.780 1.580 47.779

END TOP 16 MM 8 1.500 1.580 18.960

MID BOTTOM 16 MM 4 1.700 1.580 10.744

STIRRUPS 8MM 44 1.200 0.395 20.856

Beam B2( C3F3) 0.000

TOP& BOTTOM 16 MM 4 11.860 1.580 74.955

LAP 16 MM 4 0.800 1.580 5.056

END TOP 16 MM 4 1.800 1.580 11.376

END TOP 16 MM 4 3.200 1.580 20.224

MID BOTTOM 16 MM 6 1.800 1.580 17.064

STIRRUPS 8MM 76 1.200 0.395 36.024

Beam B2( E5F5) 0.000

TOP& BOTTOM 16 MM 4 4.670 1.580 29.514

END TOP 16 MM 4 1.800 1.580 11.376

MID BOTTOM 16 MM 2 1.800 1.580 5.688

STIRRUPS 8MM 28 1.200 0.395 13.272

Beam B2( B1B4,C1C4) 0.000

TOP& BOTTOM 16 MM 8 6.700 1.580 84.688

END TOP 16 MM 4 1.700 1.580 10.744

END TOP 16 MM 4 2.500 1.580 15.800

END TOP 16 MM 4 1.000 1.580 6.320

MID BOTTOM 16 MM 4 1.900 1.580 12.008

MID BOTTOM 16 MM 4 1.000 1.580 6.320

STIRRUPS 8MM 72 1.200 0.395 34.128

Beam B3( B4B6,C4C6) 0.000

TOP& BOTTOM 20 MM 8 5.360 2.460 105.485

END TOP 16 MM 8 2.100 1.580 26.544

MID BOTTOM 16 MM 4 2.400 1.580 15.168

STIRRUPS 8MM 64 1.200 0.395 30.336

Beam B4( D1D6) 0.000

TOP& BOTTOM 20 MM 4 12.000 2.460 118.080

END 20 MM 4 1.900 2.460 18.696

END 20 MM 2 3.500 2.460 17.220

MID TOP 20 MM 2 2.250 2.460 11.070

MID BOTTOM 20 MM 4 2.250 2.460 22.140

STIRRUPS 8MM 72 1.300 0.395 36.972

Beam B3( E1E3) 0.000

TOP& BOTTOM 20 MM 4 6.500 2.460 63.960

END TOP 16 MM 4 1.900 1.580 12.008

MID BOTTOM 16 MM 2 2.500 1.580 7.900

STIRRUPS 8MM 36 1.200 0.395 17.064


Beam B2( E3E6) 0.000
TOP& BOTTOM 16 MM 4 6.500 1.580 41.080
END TOP 16 MM 4 1.100 1.580 6.952
END TOP 16 MM 4 2.000 1.580 12.640
END TOP 16 MM 4 1.000 1.580 6.320
MID BOTTOM 16 MM 4 1.500 1.580 9.480
STIRRUPS 8MM 34 1.200 0.395 16.116
Beam B2( F1F3) 0.000
TOP& BOTTOM 16 MM 4 6.160 1.580 38.931
END TOP 16 MM 4 1.900 1.580 12.008
MID BOTTOM 16 MM 2 2.500 1.580 7.900
STIRRUPS 8MM 32 1.200 0.395 15.168
Beam B2( F5F6) 0.000
TOP& BOTTOM 16 MM 4 3.300 1.580 20.856
END TOP 16 MM 4 1.100 1.580 6.952
MID BOTTOM 16 MM 2 1.500 1.580 4.740
STIRRUPS 8MM 18 1.200 0.395 8.532
CANTILEVER BEAM 0.000
TOP & BOTTOM 16 MM 20 1.6 1.580 50.560
STIRRUPS 8MM 30 1 0.395 11.850
TOTAL LAP 0.000
LAP 16MM 20 0.8 1.580 25.280
LAP 20 MM 8 1 2.460 19.680
0.000
Slab Reinforcement 0.000
president / secretary room 48 4.65 0.395 88.164
main bar 8mm 40 6.02 0.395 95.116
distributer 8mm 18 1.9 0.395 13.509
extra bar 8mm 18 1.7 0.395 12.087
extra bar 8mm 20 1.5 0.395 11.850
extra bar 8mm 20 2.7 0.395 21.330

office room
main bar 8mm 88 7.7 0.395 267.652
distributer 8mm 76 12.3 0.395 369.246
extra bar 8mm 24 1.9 0.395 18.012
extra bar 8mm 24 3.2 0.395 30.336
extra bar 8mm 20 2.8 0.395 22.120
extra bar 8mm 20 3 0.395 23.700
extra bar 8mm 20 1.9 0.395 15.010
lap 8mm 120 0.4 0.395 18.960

bathroom area
main bar 8mm 38 3.7 0.395 55.537
distributer 8mm 32 4.4 0.395 55.616
extra bar 8mm 14 1.2 0.395 6.636
extra bar 8mm 14 1.5 0.395 8.295
extra bar 8mm 18 1.8 0.395 12.798

store area
main bar 8mm 44 3.7 0.395 64.306
distributer 8mm 34 6 0.395 80.580
extra bar 8mm 16 1.5 0.395 9.480
extra bar 8mm 16 2.4 0.395 15.168
extra bar 8mm 28 1.4 0.395 15.484

porch area
main bar 8mm 40 3.8 0.395 60.040
distributer 8mm 28 4.6 0.395 50.876
extra bar 8mm 12 1.2 0.395 5.688
extra bar 8mm 12 2.2 0.395 10.428
extra bar 8mm 24 1.5 0.395 14.220

strong room
bottom bar 10mm 15 3.05 0.617 28.228
bottom bar 10mm 21 2 0.617 25.914
top bar 10mm 15 3.7 0.617 34.244
top bar 10mm 21 2.8 0.617 36.280
roof projection distributer 8mm 2 15.1 0.395 11.929
roof projection distributer 8mm 2 12.25 0.395 9.678
roof projection distributer 8mm 2 6.7 0.395 5.293
roof projection distributer 8mm 2 3.5 0.395 2.765
front projection 8mm 11 15.1 0.395 65.610
Total lap 8mm 160 0.4 0.395 25.280

5.33.2
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement
concrete for reinforced cement concrete work, using cement content as per approved design mix,
including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing
15 and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without impairing strength and durability as per direction of
Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less
cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor
V level
Beam B2( B1F1,B6F6) 2 14.84 0.2 0.380 2.256
Beam B2( B2C2,B4C4) 2 3.48 0.25 0.380 0.661
Beam B2( C3F3) 1 11.16 0.2 0.380 0.848
Beam B2( E5F5) 1 3.97 0.2 0.380 0.302
Beam B2( B1B2,C1C2) 2 3.8 0.2 0.380 0.578
Beam B2( B2B4,C2C4) 2 2 0.25 0.380 0.380
Beam B3( B4B6,C4C6) 2 4.66 0.2 0.380 0.708
Beam B4( D1D6) 1 10.86 0.25 0.380 1.032
Beam B3( E1E6) 1 10.66 0.2 0.380 0.810
Beam B2( F1F3) 1 5.46 0.2 0.380 0.415
Beam B2( F5F6) 1 2.8 0.2 0.380 0.213
CANTILEVER BEAM 5 0.9 0.25 0.250 0.281
STRONG ROOM EXTRA 1 2 3.08 0.080 0.493
PILLAR EXTRA 11 0.25 0.05 0.380 0.052
ROOF SLAB 1 15.15 12.31 0.120 22.380
stair deduction 1 -2.6 4.17 0.120 -1.301