NOTES :

1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE


NOTED.
2. PEDESTRIAN PAVEMENT MATERIALS TO BE CONTRACT
SPECIFIC. ALSO REFER TO ADM TILING STRATEGY.
3. IN ACCORDANCE WITH THE TCDM, KERB PAINTING IN ABU
DHABI DENOTES PARKING CLASSIFICATIONS AND
RESTRICTIONS. THE COLOURS USED SHOW THE
FOLLOWING:

* KERBS PAINTED GREY - STANDARD KERB


- NEW KERBING IS NOT TO BE
PAINTED GREY

* KERBS PAINTED - STANDARD PARKING CHARGES


BLUE AND BLACK APPLY
500
TRANSITION LENGTH
KERB TYPE B * KERBS PAINTED - PARKING PROHIBITED
TOP OF PAVEMENT YELLOW AND GREY - TO BE APPLIED AT SECTORS
WHERE PAID PARKING IS
100

OPERATED

* KERBS PAINTED - VISIBILITY MARKING


YELLOW (JUNCTIONS, ENTRY/EXITS,

200
INTERSECTIONS,
ROUNDABOUTS,
AND TRAFFIC
SEPARATION ISLANDS )
KERB TYPE D
* KERBS PAINTED RED - PARKING PROHIBITED
(ADJACENT TO FIRE
TYPICAL TRANSITION KERB DETAIL HYDRANTS)

N.T.S.
* KERBS PAINTED BLUE - PARKING FOR DISABLED
PERSONS

4. WHERE KERB TYPE D IS USED AT DRIVEWAY LOCATIONS,


INTERLOCKING VEHICULAR PAVEMENT SECTION SHALL BE
PLACED ACROSS FULL WIDTH OF SIDEWALK FOR ENTIRE
LENGTH OF KERB TYPE D AND TRANSITION KERBS. AT
DRIVEWAY LOCATIONS, DRAINAGE IS TO BE REVIEWED TO
ENSURE THAT NO SURFACE WATER FLOWS TO THE
PLOTS.
5. FOR CAST-IN-SITU KERBS, CONSTRUCT TRANSVERSE
JOINTS EVERY 4.0m (NORMAL). CAST-IN-SITU KERBS ONLY
TO BE USED AS DIRECTED BY THE ENGINEER.
6. CONCRETE FOUNDATION TO BE ON SUBBASE OR
SUBGRADE AS DIRECTED BY THE ENGINEER.
7. FLUSH KERB TYPE F (300 x 150) IS TO BE USED AT RAISED
PEDESTRIAN CROSSING.

nternation
tak I al
O ! 01213! "#$%
P.O.Box: 39192
&'()*+,
Abu Dhabi
150 205 100 HYDRAULICALLY PRESSED PRECAST U.A.E. $-$.$/

UPSTAND KERB (150MMx305MM)

5cm x 3cm
FINISHED FOOTPATH LEVEL

ROAD LEVEL

50
CONCRETE
HAUNCHING

150
25
00 30 JAN 2023 ISSUED FOR CONSTRUCTION HK AJ
REV. Date ISSUED FOR BY CHK

20
MASTER DEVELOPER / OWNER :

50
IMKAN
2 AL Bateen street, Cl Tower, Mezzanine
BLOCK PAVING ROAD OR PARKING PAVEMENT 200 BLOCK PAVING ROAD OR PARKING PAVEMENT Floor, Abu Dhabi, United Arab Emirates
(150) CONCRETE FOUNDATION Tel: +971 2 652 3888
(SEE NOTE 6) 480
Fax:

DRY PACK
TOP OF FINAL CEMENT MORTAR DESIGN CONSULTANT & SUPERVISION:
PAVEMENT OTAK INTERNATIONAL
17th Floor, 1701&1702 AL MASAOOD TOWER
FATIMA BINT MUBARAK STREET
MOUNTABLE KERB PO BOX 39192, ABU DHABI, UAE
80

T +971 2 621 2611


F +971 2 621 4811
N.T.S.
PROJECT NAME :

CONSTRUCTION OF HOUSING AND


200
INFRASTRUCTURE FOR 96 VILLAS
CONCRETE
(300)

IN QASR AL JURF
400

HAUNCHING
(PHASE-1, ZONE 1.3, AREA-4)
DEVELOPMENT :

QASR AL JURF, ABU DHABI


200

PHASE ZONE :

PHASE 1 ZONE 1.3, AREA 4


20

SECTOR NO : PLOT TYPE :


50

CONCRETE
FOUNDATION AL JURF
(SEE NOTE 6 )
DRY PACK DISCIPLINE :
CEMENT MORTAR
CIVIL
FLUSH KERB TYPE F SHEET TYPE :
N.T.S.
INFRASTRUCTURE

SHEET TITLE:

STANDARDS DETAIL
TYPICAL KERB DETAILS

SCALE DRAWING NUMBER REV.

N.T.S IMK-C-179-SD-IFC-0651 00