You are on page 1of 2

Table of Specification

# of
Objectives/
Items/
Content Knowledge Comprehensive Application
% of
Area/ Topics
test
Installation is
planned and
prepared to
ensure OH&S
policies and
procedures
are followed, (5) (2) (3) (10)
the work is 10% 4% 6% 20%
appropriately
sequenced in
accordance
with
requirements

Computer
(2) (3) (5) (10)
operating
4% 6% 10% 20%
systems
Appropriate
personnel are
consulted to
ensure the
work is (1) (1) (3) (5)
coordinated 2% 2% 6% 10%
effectively
with others
involved on
the work site

Computer PC (2) (3) (10) (15)


Hardware 4% 6% 20% 30%
Tools, (5) (3) (2) (10)
equipment 10% 6% 4% 20%
and testing
devices
needed to
carry out the
installation
work are
obtained in
accordance
with
established
procedures
and checked
for correct
operation and
safety

(15) (12) (23) (50)


TOTAL
34% 24% 42% 100%

You might also like