Professional Documents
Culture Documents
3 No. 1 & 2 steering gear operation (both running) - test hard over to 30 Deg
P/S.
(max time 28 secs)
NOTE: If using Sea Bridge for the intended voyage, then steering gear checks to be carried out
additionally from the Sea Bridge control.
Sign: _____________________ Name: _______________________ Rank:_____________