s st of officers were present in the meeting is attached in the Annexure-
original plan.
1) In the existing arrangement there are 28No's of Matha's within 74mtr of OAR which are
around
getting power supply from the TPCODL existing Distribution substations installed
the Lord Jagannath Temple .It has been intimated by OBC &Tata project post completion
of SMPP work these Math's supply will be fed from proposed Temple utility substations
infrastructure. TPCODL will not consider any scope of work in the revised estimate for
2) OBCC & Tata project informed that existing high mast lighting supply will be fed from
Temple electrical infrastructure. TPCODL will not consider any scope of work for power
OBCC & Tata informed that they will be requiring 4No's of LT connection from
3) project
TPCODL with in the 75Mtr of OAR corridor. Each connection load will be approx. 100Amp.
TPCODL informed that existing LT FDP designs are not suitable to feed a concentration
load 100Amp for which new design FDP will be required to be procured & installed.
3ph
SMPP
supply to 4no's connection with new FDP will be
The scope of work for releasing power
connections will be shown by Tata
considered in final estimate. Location of these new
&inputs the estimate will be revised & submitted to OBCC & Tata Projects.
Cable instead of 3.5C X240Sqmm
5) TPCODL has proposed LT Cable 4CX300Sqmm LT
been standardised by TPCODL & not
cable .TPcODL informed that the cable sizes has
cable size is 300sqmm
procuring any LT Cable with 240sqmm. The nearby or equivalent
being used by TPCODL.
to add the support & angle cost in the revised
6) Tata project & OBCC requested TPCODL
estimate .These supports & angles are required for supporting HT & LT Cable while laying
HOG-NEG-TPCODL
4 Mr Niranjan Khuntia
Divisional Manager, PED- TPCODL
5. Mr Smruti Ranjan Swian
Asst Manager(Elect),Paschimdwar TPCODL
6. Mr Susant Kumar Biswal
Lead Engineer, NEG - TPCODL
7. Mr. Sumanta Pradhan