METHOD STATEMENT VITAL Fire Alarm System Job / Contract Name Yam Street Job | Contract Number ve 90145 Date Jul 2013 Method Statement Written By Vital Energi Utilities Ltd Method Statement Approved By Corresponding Risk Assessment No Signature of Approver INTRODUCTION This Method Statement describes the specific safe working methods which will be used to carry out the work. It gives details of flow the work will be carried out and what health and safety issues and controls are involved. The content of this Method Statement reflects the finding of the relevant Risk Assessment(s) 2. DESCRIPTION OF WORK Fire Alarm System Maximo PM Number: 3019 Work Type: PM Job Seq, Description of Task to be completed 40 “Ensure that all safety barriers. signage, isolstions and permits are in place, if requi 20 “Visually inspect the controt Panel foc signs of damage, contamination 30 “Ensure panel display is operating correctly, Visual Display Units are in good working order and touch screens: keys opetate carrectly (if fitted}, 40 “Check sensors are free from dust and oc debris, basting electrical connections with clean air aerosot to prevent build-up of dust. 50 ‘Check all switches for obvious signs of damage and correct operation. 60 “Ensure there are no fault/alarm indications, 70 “inspect dears fer corract operation, lubricate if necessary. 80 *Check correct operation of door interlack mechanism and adiust if necessary. 30 *Clean out interior, blasting electrical connections with clean air aerasol to_pravent build-up of dust, 100 “inspect all cables for signs af damage. 410 *Check condition of ‘break glasses’ 120 ‘inspect fuse carrier & fuse holders for signs of overheating. 130 ‘Visually inspect the internal and external of the control panel for any signs of electrical arcing or damage. 140 ‘inspect circuit breakers for signs of overheating, 450 *Clean or replace filters on the fan if fitted 169 “Test functionality of fan by turning down the set pcint and observing the fan starts up remembering to turn the ‘selling back to previous setting (should be approx. 25°C} if fitted 470 +i SMS test facility is installed on eontrol panel, tes. 180 ‘Test all indication lamps if possible. 490 ‘Maintain good housekeeping al all times; Tidy the work area, removing any. waste products generated during the routine. 200 “Remove all barriers, signage and isolations befare signing off permitis. 210 +Retum the Contrat Panel back into service,

You might also like