RISK VALUE
Likelihood (1-4)
Low, Medium
Severity (1-4)
HAZARDS RISKS CONTROL MEASURES
Risk Level =
High)
Falling From Height Falls from height during sprinkler relocation 3 2 low Follow working from height risk
assessment specific to access
equipment being used
When doing relocation at height be sure
to employ assist some helper
safe system of work including having
another operative to assist with
Usage of hand tools Injury to user 3 1 low Ensure the tools are correct for the job
Cuts and abrasions Ensure the tools are in good order
Operative should be aware of safe usage
of tool
Ladder Falls from ladder/ stepladder 3 2 low Ladder to be securely footed or tied
Falling objects during use.
Manual Handling and Slips Footer to wear hard hat (PPE).
Do not lift heavy/ awkward loads whilst on
ladder/ stepladder. Care should be taken
when moving/ carrying ladder (2 persons
required) or stepladder.
Page 1 of 2
Date: 01-July-2022
AL BOSHIA Risk assessment
Project Spar Kahlifa City –Emirates Post Building
Risk Level > 11, High Risk (take immediate action to eliminate the risk or implement appropriate controls to lower the risk)
= 4 – 11, Medium Risk (take timely action to implement appropriate controls to lower or minimize risk)
< 4 Low Risk (continued operation is permissible with minimal controls)