Mobilization-Plan Compress
Mobilization-Plan Compress
Contents
1. MOBILISATION PLAN SCOPE.......................................................................................................................2
1.1 MOBILISATION TEAM..........................................................................................................................3
The Contractor will appoint and maintain a Mobilization Team for the duration of the Project according to the Project
duration. It will be made up as a minimum of:
• Project Management and Construction department to provide resource by means of technical support on engineering
and construction considerations in relation to the Contract
• the Mobilization Team will work closely with the Project Manager to effect mobilization of the Contract to:
• provide a smooth hand-over from all existing arrangements and activities leading up to the Commencement Date.
• agree a set of activities with the client for all significant events during the mobilization period.
• identify and work with activity specialists within the Contractors’ organization to ensure all appropriate policies and
procedures are put in place in a timely and complete manner to ensure compliance with all aspects of the Contract
obligations. The Contractor will provide the client with an adequate notice to existing sub-contractors where appropriate.
1.1 MOBILISATION TEAM
1.1.3 SHE
Plan has been prepared in coordination with the SHE Department, Quality Department and Planning and Other Dust
control plan.
Upon authorization to proceed, mobilization activities will commence. The construction and set-up of the primary
support/staging area of the project will take place.