Over the course of 10 days, the EIM Immersion Batch 3 worked on various electrical installation and maintenance tasks at Libon Agro Industrial High School. These included disassembling and repairing a ceiling fan motor, cleaning the storage room, installing wiring and outlets, and fixing broken wires. Their supervisor, Sir Jose Seva, oversaw their work and assigned them new tasks each day to practice their electrical skills.
Over the course of 10 days, the EIM Immersion Batch 3 worked on various electrical installation and maintenance tasks at Libon Agro Industrial High School. These included disassembling and repairing a ceiling fan motor, cleaning the storage room, installing wiring and outlets, and fixing broken wires. Their supervisor, Sir Jose Seva, oversaw their work and assigned them new tasks each day to practice their electrical skills.
Over the course of 10 days, the EIM Immersion Batch 3 worked on various electrical installation and maintenance tasks at Libon Agro Industrial High School. These included disassembling and repairing a ceiling fan motor, cleaning the storage room, installing wiring and outlets, and fixing broken wires. Their supervisor, Sir Jose Seva, oversaw their work and assigned them new tasks each day to practice their electrical skills.
THURSDAY , JUNE,2 AT THE 8 O’ CLOCK IN THE MORNING WE
DISASSEMBLE THE CEILLING FAN MOTTOR AGAIN TO FIND AND SEE WHAT’S THE PROBLEM WITH IT. AND IN OUR OPEN WE WILL SEE THE DETACHED WIRE AND WE ATTACHED USING A SOLDEING IRON. BUT ITS ROTATION IS STILL WEAK. DAY 6
MONDAY JUNE,6 AT THE TIME OF 7:17AM SIR.JOSE WE
WERE GIVEN THE TASK TO CLEAN THE STORAGE OF EIM LAB TOOLS AND AFTER THAT, WE FIXED THE OUTLET IN ROOM 5 OF GRADE 9 OLA, BUILDING AND THEN WE INSTALLED THE SUPPLY ELICTRICITY IN THE INSTRUMENT STORAGE ROOM AND WE INSTALLED ONE BULB, AND ONE EXTENTION WIRE. DAY 1
MONDAY MAY 30, FIRST DAY OF OUR IMMERSION
SIR,JOSE SEVA GAVE AS A TASK TO INSTALL WIRE OF CEILLING FAN, FOR ITS TO WORK AND TO BE USED. DAY2
TUESDAY MAY,31 AT THE TIME OF 8:30 AM. SIR. JOSE
SEVA CALLED US AGAIN BECAUSE HE TOLD US TO REPEAT AND REPAIR THE CEILLING FAN BECAUSE IT WAS JUST A WEAK CYCLE, AND HE PUT AN OIL ON THE CEILLING FAN TO GET STRONGER CYCLE, BUT IT WAS STILL REALY WEAK ROTATE. DAY 3
WEDNESDAY JUNE,1 AT THE TIME OF 8:19AM WE OPEN
IT AGAIN WITH US BECAUSE SIR. JOSE SEVA HE WANTED TO SEE WHAT THE PROBLEM AND WHAT WAS THE WRONG IN THE CEILLING FAN, THATS HOW WE FOUND OUT THE WIRE INSIDE WAS DETACHED BECAUSE IT WAS OPENED REPEATEDLY. DAY 9
THURSDAY, JUNE,9 AT THE TIME OF 9 O’CLOCK IN THE MORNING
SIR. CARATAO. HE ASKED HELP AGAIN TO INSTALLED THE OUTLET IN THE STORAGE ROOM OF THE INSTRUMENT BUT THE WIRE HE GAVE US IS BROKEN SO WE FIXED IT TO USE. DAY 10
FRIDAY,JUNE,10 DAY 5
JUNE,3 FRIDAY, AT THE TIME OF 9:45AM. SIR CARATAO ON
SUBJECT TEACHER OF INQUIRIES.DURING HIS CLASS WE ARE CALLED THE TEAM WORK IMMERSION TO FIX AND CLEAN AND INSTALLED WIRING OF THE INSTRUMENT STORAGE ROOM. DAY 7
TUESDAY,JUNE 7:NO ACTIVITY
DAY 8
WEDNESDAY: JUNE 8: NO ACTIVIT
LIBON AGRO IDUSTRIAL HIGH SCHOOL
EIM IMMERSION BATCH 3
LEADER : BRYAN BAGASALA C.
ASSISTANT LEADER: ROLLY DAET JR MEMBERS: JOVAN BALLARBARE IAN SATUITO F. RAINIER IAN ABILA EDGAR DEPAZ MICHAEL ANDES GWEN LAMAY