TIME-LINE FOR EQUIPMENT SUPPLY & SERVICES


Sr. Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23
Project Activities / Tasks Days
Equipment Supply

No 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th

1 Equipment Order Confirming / Placement 10 ~ 15


2 ITEMS LOT 01 45 ~ 60 ITEMS LOT 01
3 ITEMS LOT 02 60 ~ 90 ITEMS LOT 02
4 ITEMS LOT 03 90 ~ 120 ITEMS LOT 03
5 ITEMS LOT 04 120 ~ 150 ITEMS LOT 04
6 ITEMS LOT 05 150 ~ 180 ITEMS LOT 05
7 ITEMS LOT 06 180 ~ 210 ITEMS LOT 06

8 Conceptual & Basic Engineering Design/Drawing 10 ~ 15


Scope of Services

9 Detailed Engineering Design/Drawing 15 ~ 30


10 Installation of Engine and auxiliary equipments 30 ~ 45
11 Installation of Electrical Control, LV & MV System 30 ~ 45
12 Pre-commissioning (Electrical/Mechanical) 10 ~ 15
13 Commissioning (Electrical/Mechanical) 10 ~ 15
14 1St Start-up and Load Testing of 02 Engines 5~7
15 Handing over & Documentation 10 ~ 15

NOTE1: Detailed timeline with workflow will be provided once the engineering design/drawing will finalized
NOTE2: Electrical/Mechanical (Bulk items) would be shipped once it would be 01 container

NOTE3: We will try to digout cancelled order from international vendors to decrement into proposed time duration

ITEMS LOT 01 QTY ITEMS LOT 03 QTY ITEMS LOT 04 QTY


1 Engine service platform 2 GENSET CONTROL & AUTOMATION SYSTEM 1 STARTING AIR SYSTEM
1
2 Maintenance Water collecting tank with Replenishing OPERATOR'S SYSTEM SCADA 2 Compressor Module(1W+1S) 1 set
1 set
pump with Pipe line, Fittings, Instruments and Valves 2 Engine Central Control Panel 2 CONTROL AIR Compressor
3 LT/HT Expansion tank 2 set Engine Start/Stop, Emergency shutdown, Alarm and shutdown, Control Air Receiver with Automatic Draining Equipment,
2
4 All valves, Safeties,Instruments, piping LT/HT In/Out etc 1 lot Engine synchronizing system, Load and speed control system, Pressure reducer and all piping, fittings, valves etc. I lot
5 Intake air Silencer including duct upstream of Voltage and P.F control system Adsorption dryer with Auto Drain 1
2
turbocharger and ducting from Turbo charge to Charge 3 LV-Switchgear 3 VENTILATION
6 Starting Air Receiver with Automatic Draining Station Trafo. Incoming Breaker Panel 1 Ventilation Unit 2
1
Equipment and all piping, Fittings and Valves etc. Black Start Incoming Breaker Panel 1
7 Piping and valves for all systems 1 lot Plant Motors Control Panel (CAP) 1 ITEMS LOT 05 QTY
8 Cable Tray, Accessories and Supports 1 lot Common Auxiliary Panel (CAP) 1 1 RADIATORs
9 Battery Bank 1 Radiator Fan Control Panel (RFCP) 1 LT/HT Radiator Along with Support structures,Foundation grouting 2
10 DC system for MV system control (110VDC/24VDC) 1 Uninterrupted power supply (UPS) 1 bolts, Ladder with railing & Maintenance platform
4 CABLES AND ACCESSORIES I lot 2 FCM (Fuel Conditioning Module)
ITEMS LOT 02 QTY 5 MAIN SWITCHGEAR (MV SYSTEM) Operating with Electric Heater with Mixing Tank, Fuel Filters, 1 Unit
1 Leakage Oil Module 2 Generator Incomer Breaker 2 Control panels
2 Exhaust gas Silencer With Expansion joint for exhaust Outgoing Breaker - Station transformer 1 3 CHARGE AIR SYSTEM
2
gas duct (Engine to Chimney) having support structure, Outgoing Breaker Feeder 1 Intake air filter Unit
Insulation of all exhaust piping. 2 Neutral Ground Resistor Panel
Exhaust gas stack structure with all supports and Vacuum Contactor 2 ITEMS LOT 06 QTY
foundation grouting bolts. Neutral Ground Resistor (NGR) 1 1 LUBE OIL SYSTEM
3 Control Air Receiver with Automatic Draining Lube Oil supply Pump
1 lot
Equipment, Pressure reducer and all piping, fittings, LO separators
4 Adsorption dryer with Auto Drain 1 Switch cabinet 2
5 Station auxiliary transformer - 630KVA 1 Electrical heated lube oil pre-heater
6 HFO Separator Sludge collector and sludge pump
1 Unit
Compact Module as 1-Working - 1 Stand by Feed pump
Lube Oil Pipe Line, Valves and fittings