Professional Documents
Culture Documents
No 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
NOTE1: Detailed timeline with workflow will be provided once the engineering design/drawing will finalized
NOTE2: Electrical/Mechanical (Bulk items) would be shipped once it would be 01 container
NOTE3: We will try to digout cancelled order from international vendors to decrement into proposed time duration