CEMENT MILL-1 SHUT DOWN JOB -18/08/2019

SR. No. JOB DISCRIPTION Man hour


Cement mill 1 SA box terminal connection checking Ccr side , field
1 2day
side and loop cheking checking job.
Cement mill 1 I/O room DCS card wire and field wire conection
2 2day
termination checking .
Bag house fan damper connection checking and damper calibration
3 4
jobs.
Z1P12 and Z1P13 drive ZSS pulser unite removing for Machanical
4 4
mainteance job.
Z1 A01,Z1B01 and Z1C01 feeder isolation for Machanical mainteance
5 4
job.
Z1 B01fly ash hopper air ariation system timer proper mounting job and
6 4
trial checking.
Cleaning and maintenance to be done of all techo generators of weigh
7 feeders. Z1A01, Z1C01 AND Z1B01 speed proximity mounting 8
checking .
Inlet trunion bearing temperature rtd checking and New JB mounting
8 8
transmitter(rtd connection job) calibration job.
Oil level cup cleaned and oil leakage to be checked and arrested.
9 Proximity switch to be checked, connection checking in JB out let 4
tunion bearing
Out let tunion bearing temperature transmitter fixing in new location
10 8
with rain protected cover and checking jobs .
Z1M01T3 Cement temperature rtd checking , calibration to be done
11 4
and connection checking.
Speed monitors and pulsar to be checked of Z1P12 and Z1P13 if
12 4
required to be changed
Symeto gear oil levels start and run oil cup checking , oil leakage
13 4
checking and connection level sensor checking ..
Barring position limit switch to be checked , connections to be
14 4
checking .
Z1M03 T08 bearing temperature Tx checking and calibration and
15 4
connection checking .
Z1M03 T09 Winding temperature to be checked and calibrated and
15 4
connection to be tightened.
Symetro gear bearing temp. to be calibration and connection checking
16 4
jobs.
Z1U01 And Z1M14 Speed monitor and pulsar to be checked if required
17 4
to be changed. Pulsar and connection checking jobs.
Symetro gear oil temperature tx. calibration and connection checking
18 4
jobs.
Vibration sensor to be fixed (axial and vertical after clearance from
19 4
mechanical. and connection to be done
Z1 pholaphone unite removing and pholaphone phone re-mounting
20 4
jobs .
08/2019

MAN POWER REMARK


1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1 Machanical and
Helper process help
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper

1Technician and 1
Helper

1Technician and 1 After Machanical


Helper clearance

1Technician and 1
Helper

1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper
1Technician and 1
Helper