DETAILS FOR GASIFIER-FURNACE AUTOMATION

2 Nos. of Gasifiers
will be supplying gas to 1
"Gasifier" are to be furnace. So, the Items given below under the head
doubled. PLC, PC, Control room will bo
common for both gasifier & furnace.

Description Instrument/l
Range/ Capacity Nos, Remarks
tem
ASIFIER
Air le i
Air inlet ressure
DP for air flow 000 mm WC 1 s 2
DPT 0-150 mm WC 1 s 2
ir blast tem erature
VVFD for air blower 0-120c 1 s
VVFD 20 kW 1 S

oal Fey•q/in
Limit switch of ski hoist
Limit switch 2
Vibro feeder
motor 1
Blinker weighing load cells Iset
Motor of hydraulic ower ack
motor 3kW 1
a Solenoid valves of hydraulic PP
sol. valves 5
• Pressure swiches of h draulic PP ness switch 4

Water System
Level switches for overhead tanks Level switch 4
Pumps Purn s 0.75 kW 2

Gas Outlet Line


Gas temperature 0-600c 3 7-
s
Gas pressure 0-400 mm WC 3 S

GAS HEADER
Gas temperature 0-600 s
Gas ressure 0-400 mm WC a s

FURNACE
Soaking zone temperature 0-1300 c 1 S
Heating zone temperature 0-1200 c 1 s
Preheating zone temperature 0-1000c 1 s
Flue duct temp before recup 0-1000c 1 s
Flue duct temp after recup 0-1000c 1 s
Combustion air tem near recu 1 S
Combustion air temp nea urnac 0-500c 2 s
Oxygen in flue gas
1
VVFD of furnace blower VVFD 60k 1 s
Flue duct pressure -5 to + 5 mm WC 1 s
Linear actuator of flue damper Actuator 1