Professional Documents
Culture Documents
Dear ma’am,
1 to Designated Area
Hauling Unit: Self-Loading
Hauling Capacity: ± 20 Cubic Meter per Trip
Construction Debris / Waste to be loaded by others / MDC ₱ 415.00
Hauling of Construction Debris / Waste from MDC Compound
2 to Designated Area
Hauling & Loading Unit: Self-Loading & Backhoe
Hauling Capacity: ± 20 Cubic Meter per Trip
Construction Debris / Waste to be loaded by EBMT&CI ₱ 540.00
Thanking you and assuring you of our best services.
Yours faithfully,
EDWIN B. MARZAN
CEO / PRESIDENT