Kekurangan FAT Tanggal : 25-Jan-23 Kekurangan Sample FAT Tanggal : 25-Jan-23

Update : 23-Jan-23 Update : 23-Jan-23

Size Kurang Kurang Size Kurang Kurang


(mm²) (km) (Drum) (mm²) (km) (Drum)
2 x 10 249,000 83 2 x 10 30,000 10
3 x 70 54,000 54 3 x 70 9,000 9
2 x 16 2 x 16

Report Output TC 2 x 10 Report Output TC 2 x 16

Cabling Repair Cabling Repa


Sif Meter Drum Meter Drum Sif Meter Drum Meter
1 30,000 10 12000 5 1 0 0 0
2 30,000 10 4000 1 2 0 0 0
3 30,000 10 17,000 5 3 0 0 0
TOTAL 90,000 30 17,000 11 TOTAL 0 0 0

Report Output Cabling Based On MES Report Packing


Size Actual MES Plan MES Size Cabling Repair
2 x 10 2,040,000 279,464,000 2 x 10 31 6
3 x 70 523,590 33,263,697 3 x 70 19 18

List Problem Mesin

Mesin Problem Status


7B Sanfeng 1 Perbaikan Motor Take Up Done
MTB Taihan Perbaikan gearbox
MTB Itosin Perbaikan Drive Final Capstan
12B ja Kraft Push Button Pay Off Done
7B NHT Carbon Brush Take Up Done
MTB 3 JC Dofama Bearing Take Up Done
Ext. WTL 2 Extruder Trip Done
MTB Euro Alpha Sering Trip
25-Jan-23
23-Jan-23

Output TC 2 x 16 Report Output TC 3 x 70

Repair Cabling Repair


Meter Drum Sif Meter Drum Meter Drum
0 0 1 9000 9 5000 4
0 0 2 9000 9 8,000 8
0 0 3 9000 9 4,000 4
0 0 TOTAL 0 27 12,000 16

Report Packing
Repair Total
6 37
18 37