AG COMPRESSION FACILITY 50MMscfd & 16" Gas Pipline from AG PL to Amenam-Kpono Level-1 Data

Entire Plan : Finish Date


100% 21/11/2023

Finish Date of:


46.0 34

95% 03/11/2023
Entire Plan
44.0

90% 26/10/2023
42.0

Analysis

85% 20/10/2023
40.0
Iterations: 1000

38.0 80% 14/10/2023

Statistics
36.0
75% 10/10/2023

Minimum: 31/08/2023
34.0

70% 06/10/2023
Maximum: 21/11/2023

32.0

Mean: 27/09/2023
65% 02/10/2023

30.0
Bar Width: day

60% 28/09/2023
28.0

26.0 55% 25/09/2023 Highlighters

Cumulative Frequency
Selected: 50% 22/09/2023
24.0
Hits

50% 22/09/2023

Deterministic 50%
22.0

45% 20/09/2023
P90 Contingency 34

20.0

80% 14/10/2023
40% 18/09/2023

18.0

35% 16/09/2023
16.0

30% 15/09/2023
14.0

12.0
25% 13/09/2023

10.0
20% 12/09/2023

8.0

15% 11/09/2023

6.0

10% 09/09/2023

4.0

5% 07/09/2023
2.0

0.0 0% 31/08/2023
31/08/2023 05/09/2023 10/09/2023 15/09/2023 20/09/2023 25/09/2023 30/09/2023 05/10/2023 10/10/2023 15/10/2023 20/10/2023 25/10/2023 30/10/2023 04/11/2023 09/11/2023 14/11/2023 19/11/2023
Distribution (start of inte rval)