DAILY PROGRESS REP

FIELD : OML 72 Project Name


LOC'N : KALAEKULE FIELD KCDP-B refurbishment campaign
Days on Location: 37

Daily Cost (USD): Cumulative Total ( USD):

SUMMARY OF WORK ACTI


DUR. TIME
From TO Oper
HRS CODE*
• Conducted Daily Toolbox Meeting with SEWOP & SellyFak Team. TBM Topic: Fire Preven
• Conducted Daily Temperature & BP checks for personnel onboard.
06.30 07.00 0.30 • Coordinated PTW process. Revalidated 2# CWP, Issued 1# new HWP. Suspended 2# CW
• Conducted JSA Review with verious task groups before the commencement of work acti

• Welded #2 nos lighting pole support (Ongoing) – Mezzanine Deck


08:00 12:00 4.00 • Continue Installation of Gratings (85%) – Mezzanine Deck
• Continue Installation of South side stair way and positioning intermediate landing betwee
• Commenced Installation of North side stairways from cellar to mezzanine Deck (30%)

12:00 13:00 1.00 Lunch

• Welded and Installed overhead lighting support #1 nos – Mezzanine Deck


• Decommissioned #3 nos Riser 45° Elbow / Bends from cellar deck
• Continue Welding of Hatch cover #6 – Main Deck
• Completed Welding of #2 nos lighting poles – Mezzanine Deck
13:00 18:00 5.00 • Completed scaffolding Risers Cellar to Spider Deck (100%)
• Modification of access scaffold from Main deck to Cellar Deck
• Commenced scaffolding for Beams on Installation of Cable trays – Cellar Deck
• Installation of Lighting fittings (45%) – Mezzanine Deck

18:00 18:30 0.30 • Progress meeting held

Total 11.00
AREA OF CONCERN
• Non Availability of pneumatic Cold Cutting machine for cutting of Wellhead Protection Can
• Non availability of Manual Industrial Hack Saw for the cutting of Wellhead protection CAN.
• Two additional Life Buoys required for use on KCDPA platform
• Contractor to get and mobilize 1.5''-2'' PVC pipes where welding and electrical cables will be conduited to avoid consistent impact
cables insulation and exposing all and sundry to electrical hazard.
• Fabrication of cover plate for the open ends of the jacket legs and helideck foundation pipes.
• The camp Boss is running out of FOOD STOCK.

24HRS FORECAST
• Safety Walkthrough
• Hygiene Inspection
• Continue Installation of Lighting pole support and overhead Light – Mezzanine Deck
• Continue Installation of Gratings – Mezzanine Deck
• Continue Installation of Southside stairways
• Continue Installation of Northside Stairways
• Commenced Fit-up of Riser elbow/bend and welding
• Continue welding of Hatch cover #6
• Continue lighting pole support installation – Main Deck
• Continue scaffolding on Beams for cable tray laying – Cellar Deck
• Continue Installation of Light fittings – Mezzanine Deck

Person in Charge
NAME ADEDEJI OLATUNJI
COMPANY WAEP COMPANY REP.

SIGNATURE
ILY PROGRESS REPORT
Report number 37
bishment campaign DATE 18-May-2021
SHEET 1 of 2

: Safety status Accident___0__, Incident ___1_NWR_

MMARY OF WORK ACTIVITIES


Operations

eam. TBM Topic: Fire Prevention During Welding Operation. Attendance = 67


board.
new HWP. Suspended 2# CWP and Closed 1# HWP.
commencement of work activities

Deck

intermediate landing between spider and cellar deck (30%)


o mezzanine Deck (30%)

zzanine Deck
deck

ck

k
ays – Cellar Deck

OF CONCERN

uited to avoid consistent impact by the personnel on the platform who usually step on the cables thus causing laceration on the

S FORECAST
MOSES OBOMANU
WAEP HSSE REP.
DAILY PROGRESS REPORT
FIELD : OML 72 Project Name: KCDP-B Refurbishment program Report number 37
LOC'N : KALAEKULE FIELD DATE 18-May-2021
Days on Location: 37 SHEET 2
: COMPANY REPRESENTATIVES WEATHER
1 Adedeji Olatunji Company man Weather was sunny Wind speed
CONTROL. NO. 1
2 Moses Obomanu HSSE Wind direction
Swells
JOB NO. 1
Sea
PERSONNEL MOVEMENT
ARRIVAL CO. DEPARTURE CO. TYPE POB LOCATION
WAEP 0 WAEP 0 L/B BULL RAY SEWOP 25 KALAEKULE FIELD
SELLYFAK 0 SELLYFAK 0
OTHERS 0

TOTAL 0 0 25
HEALTH, SAFETY AND ENVIRONMENT STATISTICS SECURITY UPDATES
DESCRIPTION WAEP SELLYFAK TODAY Cummulative DETAILS
FATALITY (FA) 0 0 0 0
LOST TIME INJURY/INCIDENT (LTI) 0 0 0 0
MANHOURS 24 552 576 17,108 SECURITY REPORT- AREA COOL AND CALM. NO SECURITY THREAT.
MARINE INCIDENT 0 0 0 0
PROPERTY DAMAGE (PD) 0 0 0 0
FIRE INCIDENT 0 0 0 0
ENVIRONMENTAL INCIDENT 0 0 0 0
RESTRICTED WORKDAY CASE (RWDC) 0 0 0 0
MEDICAL TREATMENT CASE (MTC) 0 0 0 0
FIRST AID CASE (FAC) 0 0 0 0
NEAR MISS INCIDENT (NM) 0 0 0 0
UNSAFE / SUBSTANDARD ACT 1 0 1 33
UNSAFE / SUBSTANDARD CONDITION 1 3 4 46
SAFE / STANDARD CONDITION 0 1 1 8
OCCUPATIONAL ILLNESS 0 0 0 0
TBT MEETING (DAILY) 1 1 1 63
HSE COMM. MEETING (1 PER MONTH) + Wkly HSE Meetings 0 0 0 4
DRILLS (ABANDON/FIRE/MOB/H2S/MED) 0 0 0 4
RISK ASSESSMENT (RA) MEETING 0 0 0 4
PERMIT TO WORK (PTW) 3 3 3 61
HSE TRAINING / INDUCTIONS 0 0 0 16
HSE INSPECTION (MONTHLY) / AUDITS 0 1 1 26
OCCUPATIONAL HEALTH / HYGIENE INSP. 0 0 0 5
MANAGEMENT HSE VISITS 0 0 0 0
TOTAL CREW ONBOARD ACTIVITY BREAK DOWN AND PERCENTAGE PROGRESS on KCDP-B

POB % Completion
TITLE POB Nigerian/other TITLE previous % completion
Nigerian/other today

WAEP SELLYFAK Installation of gratings at the spider deck 10 15


COMPANY MAN 1 PROJECT CONSTRU. SUPT 1 Lighting poles base installation on Main deck 5 25
HSSE 1 SAFETY OFFICER 2 Installation of cable trays on Mezzanine deck 0 85
QA/QC ENGR 1 Lighting poles base installation on Cellar Deck 0 15
RIGGER 1 Installation of handrails on the spider deck 40 10
ELECTR./INSTRU ENGRS./SUPT 7 Installation of handrails on the boatlanding 55 25
MATERIALS MAN 1 Installation of Southside stairway from Spider deck to Cellar deck 0 30
SCAFFOLDERS SUPERV. 1 Installation of Northside Stairway from cellar deck to main deck 0 15
SCAFFOLDERS 7 installation of gratings on the cellar deck and cellar deck extension 0 0
WELDERS 5 Temporary installation of gratings on the spider deck 50 10
FITTERS 5 Temporary installation of gratings at the boatlanding. 50 10
MATES 8 Decommissioning of corroded/hanging structural members on the main deck 100 0
MECHANIC 0 Decommissioning of corroded/hanging structural members on the mezzanine deck 100 0
RHINO OPERATOR 1 Decommissioning of corroded/hanging structural members on the cellar deck 95 1
RHINO MECHANIC 1 Decommissioning of corroded/hanging structural members on the spider deck deck
ELECTRICIAN 2 Fabrication and installation of beams on the mezzanine deck/wellhead area 100 0
PROJECT ENGR. 1 Installation of beams on the cellar deck
SUB-TOTAL 2 0 44 Lifting and welding of cellar deck cut off drainage plates(small member) 100 0
TOTAL 46 Wellhead hatch cover fabrication 55 10
Lifting and welding of cellar deck cut off drainage plates(Large member) 100 0
TOTAL CREW ON SITE Detachment and removal of wellhead covers 30 40
SUMMARY PERSONNEL ON SITE STORES (NGN)
COMPANY NO. COMPANY NO. FUEL(LTRS) FRESH WATER (LTRS) LUB. OIL HYDRAULIC OIL
WAEP 2 PREVIOUS 15,000 PREVIOUS 88,400 PREVIOUS 330 PREVIOUS
SELLYFAK 44 TODAY 1,600 TODAY 10,600 TODAY 10 TODAY
RECV 30,000.0 RECV 31,600.0 RECV - RECV
TO DATE 43,400.0 TO DATE 77,800.0 TO DATE 320.0 TO DATE

NAME ADEDEJI OLATUNJI MOSES OBOMANU


COMPANY WAEP COMPANY REP. WAEP HSSE REP.

SIGNATURE SIGNATURE_________________________________
37
18-May-2021
2
WEATHER
SSW 5 kts
SW
1-2ft
1-2 ft (Calm)

LOCATION

TY UPDATES
DETAILS

OL AND CALM. NO SECURITY THREAT.

KCDP-B

% Completion to date

25.00
30.00
85.00
15.00
50.00
80.00
30.00
15.00
-
60.00
60.00
100.00
100.00
96.00
-
100.00
100.00
100.00
65.00
100.00
70.00
STORES (NGN)
HYDRAULIC OIL
15,860
0
-
15,860.0
WAEP(Nigerian/others) SELLYFAK(Nigerian/others)-KCDP-B
S/N Arrival
NAMES DESIGNATION Dep.Date NAMES
Date
1 ADEDEJI OLATUNJI PROJECT ENGR 28/04/21 UDUAK MONDAY

2 PERCY IBITOYE HSSE 28/04/21 ALEXANDAR ATADIOSE


3 MOSES OBOMANU HSSE 8/5/2021 KENNETH WOGU
4 HAPPY AGBEYI WELLS LEAD 8/5/2021 OVIE HENRY
5 PETER ODIJE WELLS SUPV. 8/5/2021 FUNSO BANKOLE
6 JOSEPH CHINYE GEOLOGIST 8/5/2021 JEROME TOBI
7 SAMUEL ABULIHME PETROLEUM ENGR 8/5/2021 GBENGA MOBOLADE
8 TOBI OLASEHINDE PETROPHYSICS 8/5/2021 ONWUBUYA ONYEBUCHI JOHN
9 SAMUEL UZOR
10 ALIYU MOHAMMED
11 REUBEN ERIGBE
12 MOONSHINE OTOMEWO
13 GABRIEL AGEZEH
14 RICHARD OWHE
15 VICTOR CHARLES NONJU
16 EMMANUEL PETERS
17 PETER ONYEJU
18 KINGSLEY ADIASO

19 PRINCE EMORE

20 HAPPY EDEHIRI
21 WISDOM DICK
22 NSIKAK UDOKA
23 FRANK OGBEBOR

IMOEKOR AGHOMON
24
25 KINGSLEY OKUNGOSIE
26 EMEM BASSEY

27 AUGUSTINE AMADIKE

28 DICKSON FUNFADE

29 BIWEI MOSES

30 ABAYOMI OLUDARE
31 RICHARD SUNDAY
32 JIM COOKEY
33 NELSON EBUBE OGBOKA
34 ABRAHAM SUNNY
35 BOB-MANUEL FUBARA
36 DANIEL MICHAEL SEGUN
37 FELIX AMGBARE
38 UDEME UDOH
39 INYANG ENIM
40 LOUIS NNDUBOKWU
41 EMMANUEL TOM
42 DICKSON USORO
43 GOODLUCK EKEKE
44 SANUSI HAMED
45
46

47

48
49
50
51

52

53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

73
SUB-TOTAL 8
GRAND TOTAL

NOTE: MV AQUADEFENDER WAS IN THE FIELD BEFORE THE MOBILIZATION OF REFURBISHMENT CREW ON THE 20
THE NAMES AND NUMBER OF THE SECURITY VESSEL CREW HERE ONLY CAPTURES THE VESSEL CREW MEMBERS
CHANGE AS AT WHEN DUE.
W
SELLYFAK(Nigerian/others)-KCDP-B SELLYFAK(Nigerian/others)-KCDP-A MV TRION LAN
Arrival
DESIGNATION Arrival Date Dep.Date NAMES DESIGNATION Dep.Date NAMES
Date
MATE 8/5/2021 AKPAN SOLOMON MECHANIC 8/5/2021 WILLIAM TOM
MATE 8/5/2021 Enobong Atat SCAFFOLDER 8/5/2021 ABRAHAM THOMSON UDOM
ELECTRICIAN 8/5/2021 Matthew Omoregie E&I 8/5/2021 ABAYOMI DUROJAYE
SCAFFOLDER 12/5/2021 INNOCENT OGAR
PROJ. ENGR 8/5/2021 IFEANYI GANOBI
MAT. CO-ORD 8/5/2021 KINGSLEY OKON EYO
CONST. SUPT. 8/5/2021 GIFT FRIDAY(MENE)
E&I SUPT. 8/5/2021 EMMANUEL EKPO
WELDER 8/5/2021 ALPHA ODEY
WELDER 8/5/2021 OWARUME FESTUS
WELDER 8/5/2021 ALEXANDER E. IGWE
WELDER 8/5/2021 DAVIDS DICKSON
FITTER 8/5/2021 BIFEM DILIMONO
FITTER 8/5/2021 OLAROYE JACKSON
FITTER 8/5/2021 PROSPER ISHMAEL
SCAFFOLDER 8/5/2021 EBADAN HENRY
FITTER 12/5/2021 ONONGHA EKIPNSE E.
E&I 8/5/2021

WELDER 12/5/2021

E&I 8/5/2021

MATE 8/5/2021
MATE 8/5/2021
MATE 8/5/2021
HSE
12/5/2021
COORDINATOR
QC 12/5/2021
SCAFFOLDER 12/5/2021

FITTER 12/5/2021

RHINO OPERATOR 12/5/2021

RHINO OPERATOR 12/5/2021

MATE 12/5/2021
MATE 12/5/2021
SCAFFOLDER 12/5/2021
E&I 12/5/2021
E&I 12/5/2021
HSE OFFICER 12/5/2021
MATE 12/5/2021
E&I 12/5/2021
SCAFFOLDER 12/5/2021
SCAFFOLDER 12/5/2021
E&I 12/5/2021
SCAFFOLDER 12/5/2021
SCAFFOLDER 12/5/2021
E&I 12/5/2021
TELECOMS 16/5/2021

44 3

FURBISHMENT CREW ON THE 20/03/2021,BUT DEVELOPED MECHANICAL PROBLEMS AND LEFT KALAEKULE FIELD ON THE 26
ES THE VESSEL CREW MEMBERS AND NOT THE SECURITY PERSONNEL AS SEEN IN DPR#2 VESSEL CREW,THIS IS BECAUSE W
WORKERS SCHEDULE/MOVEMENT
MV TRION LANNISTER(Nigerian/others),PSV M/V SEEKER (Nigerian/others),SECURITY
Arrival Arrival
NAMES DESIGNATION Dep.Date NAMES DESIGNATION Dep.Date
Date Date
WILLIAM TOM CAPTAIN 20/3/21 CLINTON ATIMRI MASTER 26/03/2021
ABRAHAM THOMSON UDOM CHIEF ENGR. 20/3/21 SUNDAY EKWERE CHIEF ENGR. 26/03/2022
ABAYOMI DUROJAYE CHIEF MATE 20/3/21 PEKENE MARCH J. CHIEF MATE 26/03/2023
INNOCENT OGAR 2ND MATE 20/3/21 IGBUDU MARTINS 2ND ENGR 26/03/2024
IFEANYI GANOBI 3RD ENGR 20/3/21 JOEL U. M OKEREKE ELECTRICIAN 26/03/2025
KINGSLEY OKON EYO BOSUN 20/3/21 DAUDA ALIH COOK 26/03/2026
GIFT FRIDAY(MENE) COOK 20/3/21 OGBONNA DANIEL O. AB 26/03/2027
EMMANUEL EKPO ELECTRICIAN 20/3/21 RICHARD TIMISHE AB 26/03/2028
ALPHA ODEY COOK 20/3/21 KELECHUKWU ANENE OILER 26/03/2029
OWARUME FESTUS AB 20/3/21
ALEXANDER E. IGWE AB 20/3/21
DAVIDS DICKSON AB 20/3/21
BIFEM DILIMONO OS 20/3/21
OLAROYE JACKSON OILER 1 20/3/21
PROSPER ISHMAEL OILER 2 20/3/21
EBADAN HENRY OILER 3 20/3/21
ONONGHA EKIPNSE E. ENGINE CADET 20/3/21
17 16
152

KULE FIELD ON THE 26/03/2021,AND WAS REPLACED BY AQUASEARCH SAME DAY. ALSO
REW,THIS IS BECAUSE WE THE MOBILE SECURITY PERSONNEL MANAGES THEIR CREW
MENT
MV AQUASHIELD III (Nigerian/others),SECURITY MV CLEMENTINA(Nigerian/others),FSIV
Arrival Arrival
NAMES DESIGNATION Dep.Date NAMES DESIGNATION
Date Date
MICHAEL UGULAPELEWEI MASTER 20/03/2021 GOLDEN UKULI CAPTAIN 20/03/2021
PAUL AKPAN CHIEF ENGR 20/03/2022 TIMON ELLIOT PEREMO. CHIEF ENGR 20/03/2022
EKEFIA GILBERT CHIEF OFF. 20/03/2023 BASSEY EMMANUEL U. CHIEF MATE 20/03/2023
UKONG NDIFREKE D. 2ND ENGR 20/03/2024 EDWIN ONYEAGHALA BOSUN 20/03/2024
SAMUEL KORIE ELECTRICIAN 20/03/2025 OLOMU JOSEPH COOK 20/03/2025
EMENIKE COLLINS AB 1 20/03/2026 RONALD CHINDA AB 20/03/2026
NAPOLEON EREKOSIMA AB 2 20/03/2027 UBU OGHENERO O. OILER 20/03/2027
JAJA JOSHUA CHINEDUM COOK 20/03/2028 EKEOCHA MICHAEL CADET 20/03/2028
EZENOKOLO VALENTINE OILER 20/03/2029 OCHUKO MANSION BASE ENGR. 20/03/2029
CHRISTIAN DEDE BASE ELECT. 20/03/2030
10 16
others),FSIV L/B BULL RAY(Nigerian/others),SEWOP BLUE SHARK(Nigerian/others),SEWOP
Arrival
Dep.Date NAMES DESIGNATION Dep.Date NAMES DESIGNATION
Date
ROBERT M. JACKOWSKI(USA) CAPTAIN 12/4/2021 TERRY LAMPERT(USA) CAPTAIN
JAMES DICKSON CHIEF ENGR 12/4/2021 HAPPY EKHORAGBON MEDIC
STEPHEN OCHUKO CHIEF MATE 12/4/2021 OTUGO SOLOMON CHIEF OFF.
SUNDAY IJOMAH 2ND ENGR 12/4/2021 EJIRO ERUENAH CHIEF ENGR
UCHE IKWEGBALI ELECTRICIAN 12/4/2021 ODAKPO DON WILSON 2ND ENGR.
ANAYO EKEOCHA OILER 12/4/2021 FRANKLIN ULOGO AB/CR.OPT
PETER AKPOBI OILER 12/4/2021 FIDELIS IROZUEH AB/CR.OPT
DAVID IDHOGBI A/B 12/4/2021 DANIEL ANDREW OILER
WILSON ESHIET A/B 12/4/2021 ALBERT TAIRE AB/CR.OPT
HAPPY EGERE A/B 12/4/2021 FREEDOM OSOKPRO A/B
DALHATU LAWAL A/B 12/4/2021 MOSES OPALUWA CAMP B.
KELVIN EVUEYERE A/B 12/4/2021 CHRISTOPHER ASIODU COOK
JONAH EGHELEME A/B 12/4/2021 AGADA G. SUNDAY BAKER
SUNDAY LAZARUS CAMP BOSS 12/4/2021 DEGEMA FELIX STEWARD
KEKEVE RICHARD UKRI STEWARD 12/4/2021 DESTINY OHWOFASA H.KEEPER
JOHN UDOFOT BAKER 12/4/2021 ABEL AKHIGBE LAUNDRY
UFOMA ONIOVOSA STEWARD 12/4/2021
AUSTIN EBRUDU MEDIC 12/4/2021

EDEDEY EDWIN LAUNRY MAN 29/04/21

EWHE SUNDAY ROOM MAN 29/04/21

RECORD WAHBODE ROOM MAN 29/04/21


OKOKON AKPAN COOK 29/04/21
22 16
erian/others),SEWOP
Arrival
Dep.Date
Date
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021
27/4/2021

You might also like