You are on page 1of 1

DAILY PRE-START CHECKLIST FOR CRAWLER CRANE

Site Name Type of Work Equipment


(Arabic) (Arabic) Number (Arabic)
Manufacturer
Model (Arabic) Capacity (Arabic)
(Arabic)
Year
Date of First Use Date of Inspection
Manufactured
(Arabic) (Arabic)
(Arabic)

12 3 Anti-Two Block
Sheave (Arabic)
(Arabic)

Wire Rope Anti-Reverse


1 (Arabic) 2 (Arabic)

13 Wire Drum 9 Brake 7 Structure/Boom


(Arabic) (Arabic) (Arabic)

14
Counterweight
(Arabic)

Hook & Safety Latch


5 (Arabic)
15 Track & Lower Frame
(Arabic)

10
Rearview Mirror
(Arabic)

Relief Limiting Device 8


4
(Arabic) Angle Indicator
(Arabic)
11
Horn
(Arabic)
6
Overload Protection
(Arabic)

Certification Oil Leakage Steel Base Plate Fire Extinguisher


16 18 20 22
(Arabic) (Arabic) (Arabic) (Arabic)
Permit to Work Banksman/Signal Man Lifting Gears Alcohol Test
17 19 21 23
(Arabic) (Arabic) (Arabic) (Arabic)
Operator Const. Team (Sig) HSE Personnel (Sig)
(Sig) Arabic)
(Arabic) (Arabic) (Arabic) (Arabic) (Arabic)
(Keep the copy of Daily Pre-Start Equipment Checklist on Site for the Job Duration. Submit a copy to the Project HSE Department , if
requested/required) (Arabic)
Acceptable; Need Further Check; Not Applicable
Note: Mark appropriate boxes
with:(Arabic)
 (Arabic)  Unacceptable;
(Arabic)
 (Arabic)
NA
(Arabic)

HDGSK JV HSE Rev.0

You might also like