You are on page 1of 4
Montana Sate College of Engineering & Techuology & Techuolony ‘of Civil Ey 4 Technology Tieng OSM ay DU) Hn Reet Tek Rn iy 220 AM htt ne et 24 gyno Thane ys at CVEISI- Structural Theory 1 SF, 2020-2021 burst Semester Activity 5: Cable Supporting Distributed Lowt Problem 1: An electric wire having a mass per unit length of 0.6 kg/m Is strung between two Insulators at the same elevation that are 60 m apart. Knowing that the sag of the wire Is 1.5 m, determine the following: a. Maximum tension in the wire; and T#1774.GO7N. b. The length of the wire 32 @.colm Problem 2: Chain AB supports a horizontal, uniform steel beam having a mass per unit length of 85 kg/m. If the maximum tension in the chain fs not to exceed 8 kN, determine the following: 2 1-562m a. Horizontal distance a from A to the lowest point C of the chain; and S*G.336m b. The approximate length of chain Problem 3: Each cable of the side spans of the Golden Gate Bridge supports a load w = 10.2 kN/m along the horizontal. Knowing that for the side spans the maximum vertical distance h from each cable to the chord AB is 9 m and occurs at the midspan, determine the following: a. Maximum tension in each cable Ta # 7994. 928 KN b, Slope at B. Tes 8625. 347 KN 97 28.74" [ ID Nozeoi-acos | Name: Merwin Anchrew Ms Uy DateziofaAo | Sheets 1 equi a Pier Minas Site Hes of Fslony i) College of Engineering & Te iy oat ae (4) 2391 seg: iON 2 if Activity 5: Erobier_t_ Cable Supporting Distributed Load 20.6 kg/m L*¥GOm dthom Le case aon ies i DMazha-wS CE) =O eo s A a ans xed Ss THOS >= (5.886) ( 9 WE )eg ‘ zee — yt SH = 2648.7 w 20.6 kg/m > SBE Nim oe = 2? OS AITASEN ew 2 8823 a 4 7a ] Teper Wee Nw gore] ms Ms od S285 [neat «PCa tea let ad lem® + InCme Siam 2) *[eocotm] | th of the wir Preblens 2 =” ] Colm] lero’ wire. os iy hl ree Le6m Tmax = 8 KN ACL) B(G,0,4) x Pyt3e,, BR Bn An FO > Ay = Bx eaua( Dry tAy +B, - whom Ay +By SOL 404 800 q wat — eta + tndia® wv set TA Tray 1 & KN = BQO N of Civil Engineering & Technology P.O, Box No. Sb Tel. Nos. (063) 221-4030 Loc 130 063) 2351: Toalngeoeyaboo.com Homepage: iano ans el pio CVEIS51 - Structural Theory I S.Y. 2020-2021 First Semester Activity 5: Cable Supporting Distributed Load quadertic Sormula fel) Seer aye eee oo Bet) t 1G 888)" uC 7) HOt 2c007D 2Ot ae A= 4.286n op v7) : Aco, > Ye ie O2 EEO RD Clieas 0.132) eevee Sey 170. Ly=4x* sen ae *(,0) : 7 O26) =A0oy" + Loy ero *€6, 0.5 : OA! €.92 aCe?) t BLO) #(0) > Carat Ghe & *1982,-0.132); ian 2): ©0132) 2 Crse2% + Cus@2db& + > “ TWONSE = Ciesay%y + ¢ 282 (B-Ga > Yeo, TOr1B2 =5829% _ Bey. BDa + C1 oe 0; fi S. ; > 0,5) az ~ 2324 crsearcocy beg 615829" 6 c.sa25 (eset E 64 = -o.g, Yrax* 4 bx ae 7 ° Gaxeb s CF i + t e . [i ty W]e fl ll Oa tb *]dx S-|2o a 3 + Qabx?+ Coren] [F =/6, 336 ] a a » Froblem — By ZR, 7 Ox “Ay FO > A Ax Bx Bx DRY =Ay tBy- wel eo Ay t ®y = 650 20 Br A Sy sileeO SO, Ci\ BM, Sy - By OMS) = WLC )= 3308, -\4SOx-279250 20 . o mere GO By = 298 -~ SuNSO =O 62) AlO,0) @6%30,5) C4105, Ya) Name: Merwin Avdeciy Ms Uy fag Sheet: 3 Repubhe of the Faippines Mindanao State Unversity - Higan Insitute of Technology College of Engineering & T¢ gy & Technology Department of Civil Engineering & Technology Tibanga, 9200 Iligan City, P.O, Box No. S644 Tel, Nos. (063) 221-4050 Loe. 130 [fm Dire line (063) 2351 E-mail fblagaotayaboo com Homepage inp Zs asi eda phisoe SY (Ga CVEIS1 - Structural Theory I SLY. 2020-2021 First Semester Activity 5: Cable Supporting Distributed Load Ao,0) 86%30, 145) ee 4188 2 230 Serq 7 ae 7 27925 7 3904+ 2970 > 7g = GBS 6165, 63.5 ane SMES 63:3) rytaxtebeec PACO,0): Coy 2 ACOD+* lo) +C > (220,45)? CMS) * aCB30)* + BC330) GiaG ce Sic Zz 220q +b PCUes, = 163.5): (63.5) =aCles)?4 bCiGS) p= 2) -s204 62-5 = alles)" + ZB - 3200) (16s) Ay eso-p, « - B47 Ey Ax . Be a a rerlen rey = [8625.247 0] oti, ey, ID No: 208-0005 | Name:Mewin Andrew M. Uy ‘| Daaterio/,a/20| Sheet: | eee eee eee I

You might also like