You are on page 1of 8

1st VO for Sermsang Offshore

Monopile Foundation Review


Troung Thanh Tra Vinh Wind Power JSC

Customer Reference: 10658602


Document No.: L2C210414-THBK-P-01-B
Date of issue: 2021/01/07
Date of last revision: N/A

DNV GL Thailand Co Ltd


Customer Details (the “Customer”)

Customer Name: Troung Thanh Tra Vinh Wind Power JSC


Nha Mat Halmet, Truong Lonh Hoa
Customer Address: commune, Tran Vinh province, Duyen Hai
Town, VIETNAM, 940000
Customer Reference: 10658602
Contact Person: Yaowapa Klaonopparat

DNV GL Company Details (“DNV GL”)

DNV GL Legal Entity: DNV GL Thailand Co Ltd


DNV GL Organisation Unit: TBC
DNV GL Address: 15th Floor, Unit 1501-1502, SJ Infinite I Business
Complex, 349 Vibhavadi-Rangsit Road, Chompol,
Chatuchak, Bangkok, 10900
DNV GL Telephone No.: +66(0)2-115-9868
DNV GL Doc. No.: L2C210414-THBK-P-01-B

About this document (the “Proposal”)

Proposal Title: 1st VO for Sermsang Offshore Monopile Foundation


Review
Date of Issue: 2021/01/07
Date of Last Revision: N/A
Validity of Proposal: 30 days from date of issue
Terms and Conditions: See Appendix A and Section 5, Contractual
Document Classification: Commercial in ConfidenceCommercial in
Confidence

About DNV GL
Driven by our purpose of safeguarding life, property and the environment, DNV GL enables organizations
to advance the safety and sustainability of their business. We provide classification and technical
assurance along with software and independent expert advisory services to the maritime, oil and gas,
and energy industries. We also provide certification services to customers across a wide range of
industries. Operating in more than 100 countries, our 16,000 professionals are dedicated to helping our
customers make the world safer, smarter and greener.

DNV GL Thailand Co Ltd Page ii


Important Notice and Disclaimer

This proposal (“Proposal”) is prepared and issued by DNV GL Vietnam Ltd. (trading as DNV GL) for the
sole use of the recipient named on its title page (the “Customer”) for whom this Proposal is prepared.
Neither this Proposal, nor any discussions, correspondence or other activities in connection with this
Proposal shall form a relationship of responsibility (and whether in contract or in tort, including without
limitation negligence) regarding its subject matter without the Customer (or with the agreement of
DNV GL any third parties) entering into a written agreement with DNV GL in accordance with DNV GL’s
terms and conditions contained or referred to in this Proposal. This Proposal may only be reproduced
and circulated in accordance with the Document Classification and associated conditions stipulated or
referred to in this Proposal.

This Proposal has been produced from information at the date of this Proposal and, where applicable,
information relating to dates and periods referred to in this Proposal. The Proposal does not imply that
any information is not subject to change.

Confidentiality – Commercial in Confidence

This proposal may contain information that is business sensitive to DNV GL. No part of the proposal or
information received during the bid process may be used, duplicated or disclosed for any other purpose.
Any such use of DNV GL’s information is regarded as an infringement of DNV GL intellectual property
rights. This proposal is not to be disclosed outside the Customer’s organisation.
For DNV GL Thailand Co Ltd

Prepared by: Checked by:

Das Na Songkhla Thomas Leonard


Senior Engineer, Thailand Country Manager, DNV GL Energy, Thailand & Idonesia

Approved by:

Thomas Leonard
Country Manager, DNV GL Energy, Thailand & Idonesia

DNV GL Thailand Co Ltd Page iii


Table of contents
1 INTRODUCTION .............................................................................................................. 2

2 SCOPE OF VARIATION ..................................................................................................... 3


2.1 Task 1 – Design Review Support 3
2.2 Budget 3
2.3 Deliverables 4

DNV GL Thailand Co Ltd Page 1


1 INTRODUCTION
DNV GL (Thailand) Co., Ltd., trading as DNV GL, is pleased to submit this variation proposal (the
“Proposal”) in response to a request from Sermsang Power Corporation Public Limited Company (the
“Customer”).

The variation order is to continue review of the monopile foundation design review of the project.

Customer requires the services of an experienced independent engineering consultant to help review
technical documents give confidence that the monopile design solution is suitable and that a steel order
can be placed before 2021. Should you have any questions in relation to this proposal please direct them
to:

Das Na Songkhla
Senior Engineer, Renewables Advisory
DNV GL – Energy, Thailand

E-mail: das.na.songkhla@dnvgl.com
Phone: +6696-919-9894

DNV GL Thailand Co Ltd Page 2


2 SCOPE OF VARIATION

2.1 Task 1 – Design Review Support


DNV GL will continue review of the monopile foundation design review.

DNVGL has limited time to review and comment on design report and drawings. Therefore, based on
experience the review will concentrate on areas that drive the monopile design for shallow water location
of the coast of Vietnam.

The key drivers are:

• Soil interpretation and modelling (impacts the monopile stiffness and embedment length)

• Natural frequency assessment (impacts the monopile stiffness, diameter and dynamics)

• Fatigue loading (impacts the wall thickness).

• Extreme loading (impacts the embedment length).

Following the initial review, DNVGL will discuss with the Customer how the support the project ongoing
by either an Owner’s Engineer Role or Certification / Verification.

2.2 Budget
DNV GL will undertake this work on a time and material basis, with the initial agreed budget covering
support into the early January 2021.
The following T&M budget is proposed:

Total budget
Engineer Role Rate Hours (budget)
(Baht)

Das Na Songkhla
Project manager 3,500 Baht/hour 8 28,000
Project manager

Structural and
Nathan Muir £174 / hr
design method 32 224,000
Project manager (7,000 Baht/hr)
review
Structural and
Huw Traylor £174 / hr
design method 8 56,000
Principal Engineer (7,000 Baht/hr)
review
Zefeng Zhou
Geotechnical and
Senior 1340 DKK /hr
design method 16 105,600
Geotechnical (6,600 Baht/hr)
review
Engineer
Pauline Suzuki
Geotechnical and
Senior 1500 NOK/h
design method 48 259,100
Geotechnical (5,500 Baht/hr)
review
Engineer

Total (Baht) 671,900

DNV GL Thailand Co Ltd Page 3


2.3 Deliverables
The deliverable will be in the form of a comment review sheet (CRS) for the document reviewed. It is
expected that three CRS to be issued on 15/01/2021.

DNV GL Thailand Co Ltd Page 4


DNV GL and Customer confirm that this variation order (VO) is an integral part of the Agreement/ Main
contract referred herein. Except for the impacts or revision agreed under this variation order, other
terms and conditions under the said Agreement/Main contract shall remain in effect. No deliverables will
be made until a signed variation order is in place.

The Variation Order shall be effective from the singing date.

☒ DNV GL is in complete agreement with the cost and schedule impact set out above.

☐ DNV GL does not agree with the above, but confirms receipt of this Variation Order.
See attached, for viewpoints.

Place: Ho Chi Minh City, VietnamBangkok, Thailand


Date: 23-03-202007-01-2021
for DNV GL

Thomas Leonard
Country Manager
DNV GL Thailand Ltd.

Accepted by Customer:
The undersigned represents and warrants that he/she has the necessary authority to sign on behalf of
and bind Customer.

Place:
Date:
for Customer

Mr. Passakorn Panyarattanakorn

Truong Thanh Tra Vinh Wind Power


Joint Stock Company