Managing safely - project - delegate guidance

Introduction
As part of the Managing safely course, you have to complete a project and have it
assessed. You’ll be expected to carry out a risk assessment based on your own work
environment. You will need to record the risk assessment on either your company’s
designated form or the one provided by the trainer. Do not submit any additional material
in support of your project work. You can complete the project either by hand writing or
typing it onto a printed copy.

Before returning your project, check that it is fully completed including your name, date
and signature. This project must be your own work.

When you’ve completed your work, you should return it to your training provider by the
date they have advised.
Managing safely - project

Instructions
Please read all the instructions before starting work on your project.
The risk assessment project is broken down into a number of stages, which should flow
from start to finish, telling a complete story of your work area and the hazards, risks
and their required controls within it.
Your trainer has advised you of the risk assessment form to use for this process.
For this risk assessment project, it is important that you only choose hazards that
are not currently adequately controlled.
Your risk assessment must show the following about your work area:
• A brief description of the work area being assessed
• A brief description of the tasks being performed in the work area
• A listing of four (4) hazards in the work area, with each one followed through the
risk assessment process
• List who may be harmed by the hazard
• State how they may be harmed
• Describe the risk controls already in place
• Calculate a risk rating – using the IOSH 5 x 5 matrix or an appropriate
company-specific system
• Describe any additonal controls needed
• Calculate a risk rating for the new controls (the residual risk)
• State who will action or monitor any further controls
• State when the actions or monitoring needs to take place
In addition it must also show the following basic information:
• Your name
• Date and time of the risk assessment
• Your training provider’s name
• Your signature
• The risk assessment review date
If you are using the IOSH risk assessment project template, we recommend that you
use:
• the 5 x 5 risk rating calculator
• the action level table – for further controls
If you are using your own company risk assessment form for the project, we recommend
that you provide a copy (to the trainer) of
• the risk rating guidance.
Risk assessment form

Name of assessor Safa Ahmed Date December 21th, 2022

Time 10:00 AM Work area Welding Workshop, 1200 m2 with up to 60 people


Task being assessed Cutting and Welding processes

New risk
How might Existing Risk rating rating Action/ Action/
What is the Who might be Additional
people be risk control (Residual) monitored by monitored by
hazard? harmed? controls
harmed? measures whom? when?
L C R L C R
Electricity: Workers Workers using All worker were 4 4 16 1. Stop the work 1 4 4 HSE Officer & Immediately
Worker was using damaged power trained to use and do not allow HSE Engineer
damaged electrical
power tools having
tools might get power tools. the workers to
exposed circuit serious personal use damaged
and cuts injuries such as power tools.
electric burns or 2. Arrange
muscle another good
contraction condition drill
machine from
workshop to
complete the
task.
3- Do inspection
of all tools and
remove all
damaged tools
for repair,
Slips & Trips: All workers and anyone can trip 1. Electric cable 2 4 8 1. Remove 1 1 1 Supervisor and 3 weeks
At the main engineers using from trailing was double trailing cable Electrical
entrance of that pedestrian cable and fall insulated. from pedestrian Manager
Risk assessment form
workshop there path way of from same level 2. Tripping path way and
was a trailing workshop that might result hazard signage stop the activity.
cable of drill in injuries such was displayed. 2. Install
machine in as cuts, bruises, additional
pedestrian path wounds, socket plugin
way any one can dislocation and points in area to
trip and fall. broken boons. avoid cables on
path ways.
3. Arrange good
quality battery
powered drill
machines to
avoid trailing
cables and avoid
electricity
hazard.
Risk assessment form

New risk
How might Existing Risk rating rating Action/ Action/
What is the Who might be Additional
people be risk control (Residual) monitored by monitored by
hazard? harmed? controls
harmed? measures whom? when?
L C R L C R
Working All maintenance There is high 1. At start of 4 5 20 1. Hold the 1 5 5 HSE Officer, 1 month
at height: workers working probability of activity tool box activity and HSE Engineer
During on temporary fall of workers talk was remove the and Scaffolding
maintenance scaffolding from height, that conducted and workers from supervisor
activity workers platform are at may lead to attendance sheet poorly erected
were working on risk. sever personal was available. scaffolding
temporary injuries such as 2. For platform.
incomplete cuts, wounds, scaffolding 2. Install
scaffolding bone fractures, platform proper missing boards
platform. joint dislocation, access and egress and put proper
spinal cord was provided. guardrails on
injuries and even sides of
death. scaffolding
platform.
3. Carryout
proper
inspection of
scaffold and
post the
scaffolding tag
after inspection
by competent
scaffold
inspector or
supervisor.
4. Provide
continuous
Risk assessment form
supervision for
high-risk
activity being
performed at
height at height.
5. Arrange
detailed training
session for all
the workers
about safety at
working at
height.
6. Provide fall
body harnesses
with double
lanyard for 100
% tie off to all
workers
working on
temporary
scaffolding
platform.
Fire: Crew members welder was not 1. 10-lb Fire 3 4 12 1. Clean the area 1 3 3 HSE Engineer 1 week
In waste material involved in hot using proper extinguisher was and remove and workshop
storage area, work activity and personal available near by combustible supervisor
unsafe hot work other workers protective the welding material placed
activity was working in waste equipment such activity. near hot work
being carried out material storage as welding face 2. Hot work activity to avid
near combustible area. shield, it can warning signage fire.
material so there cause damage to was displayed 2. Put charged
are high chances the eye, skin of fire water hose
of fire. welder. And on site near by
unsafe condition the hot work
Risk assessment form
and act can lead activity.
to fire and 3. Appoint
explosion competent fire
resulting in huge watch on site to
property and monitor hot
equipment work activity.
damage, also 4. Provide
serious burn activity specific
injuries and PPEs including
fatalities of welding helmets
workers. for welders and
face shield for
other crew
workers
involved in
activity.

Review date June 21th, 2023 Signature

Training provider name Dr. Riyadh Monowr