NO WORK DESCRIPTION QTY VOLUME PRICE TOTAL
1 PAINTING LINE RELOCATION WORKS
DEINSTALLATION WORK
I Preparation
1 Equipment tagging 1 Ls 2,500,000 2,500,000
2 Worktool/Equipment preparation 1 Ls
3 Temporary partition installation 60 m3 27,500 1,650,000
V Equipment/Mechanical
All equipment de installation 1 Ls 62,500,000 62,500,000
1 Conveyor Line Oven
2 Spray Booth
3 Filtration unit
4 Air shower Unit
5 Batch oven
6 Mixing room.
VI Finishing
2 Roof repair /installation with SAKURA Plafon 250 M3 250,000 62,500,000
1 Partition re installation, repair 200 m3 220,000 44,000,000
3 Wall & room finishing 1 Ls 10,000,000 10,000,000
4 Electrical Installation Finishing 1 Ls 10,000,000 10,000,000
6 Clearing works 1 Ls 7,500,000 7,500,000
V Equipment/Mechanical
All equipment placing, leveling, Installation and testing 1 Ls 105,000,000 110,000,000
And troubleshooting
1 Conveyor Line Oven
2 Spray Booth
3 Filtration unit
4 Air shower Unit
5 Batch oven
6 Mixing room.
TOTAL 362,400,000