Evaluation Index
Training Operation Manpower Asset Kaizen Safety
Achived
Rating Rating Rating Rating Rating Rating
Score
Ideal Current Ideal Current Ideal Current Ideal Current Ideal Current Ideal Current
Mandatory 6 6 14 12 2 2 26 26 2 2 10 8
Non Mandatory 2 0 12 12 2 2 6 6 2 0 0 0
Total 8 6 26 24 4 4 32 32 4 2 10 8
T-TEP Instructor should use T-TEP CD ROM [TEAM21], Computer system and LCD Projector during all training sessions.
YES
Usage : Instructor can use fully TEAM21 CD ó 2
Usage : Instructor can not use TEAM21 CD O 0
T-TEP Training
Insert Photograph
Target Date of completion
Date:
1.2. Whether the monthly tests are conducted as per schedule and reports of (n-1)the month are received at TKM within 5th of every nth month.
Institute should conduct the monthly tests as per schedule and should upload the results in T-TEP Web Portal within 5th of every nth month.
Scope of Improvement Snap Shot of the Online Web Portal Batch Details
WILL DO
Insert Photograph
Target Date of completion
Date:
1. Training
1.3. Are the study materials provided to institute easily accessible by the students ?
The study materials should be easily accessible to all students at the institute.
Condition Rating
Access given to all ó 2
YES
Access given to only few students ● 1
Access not given to all O 0
Insert Photograph
Target Date of completion
Date:
1.4. OJT : Does Institute attend On The Job Training at TKM designated Toyota Dealership.
Institute should attend all OJT Classes as per TKM Plan
Condition Rating
Attended all OJT Classes 100% ó 2
YES
Attended less then 100% OJT Classes O 0
DUE COVID
Insert Photograph
Target Date of completion
Date:
2. Operation
2.1. Epoxy Flooring : Is the epoxy/Industrial Tile flooring in the workshop well maintained
T-TEP workshop should have well maintained epoxy/Industrial Tile flooring in line with TKM Standard.
Insert Photograph
Target Date of completion
Date:
Condition Rating
well maintained wall Painting ó 2
YES
Poor wall Painting/needs repaint O 0
Insert Photograph
Target Date of completion
Date:
2. Operation
2.3. GT : Lift condition : Is the lift in working condition ? : BP: Pneumatic Line: Is the Pneumatic air line is in working condition ? & SA -NA
In GT T-TEP Workshop should have the lift in working condition. In BP T-TEP Workshop Pneumatic air line should be in good working condition without air leak
Working properly ó 2
YES
Not working properly/needs to repair O 0
Scope of Improvement Photograph of Lift / Pneumatic Line / attached video of the lift working
Insert Photograph
Target Date of completion
Date:
Good ó 2
YES
Satisfactory ● 1
Poor O 0
Insert Photograph
Target Date of completion
Date:
2. Operation
2.5. Flooring : Is the Flooring in good condition ?
T-TEP Classroom should have well maintained flooring.
Insert Photograph
Target Date of completion
Date:
YES
Scope of Improvement Photograph of the Classroom wall painting
Insert Photograph
Target Date of completion
Date:
2. Operation
2.7. Storage Area : Whether T-TEP Classroom has designated storage area?
T-TEP Classroom should have the storage area with all materials stored properly in place with signages.
Insert Photograph
Target Date of completion
Date:
Good ó 2
YES
Satisfactory ● 1
Poor O 0
Insert Photograph
Target Date of completion
Date:
2. Operation
2.9. Training Schedule : Does the institute has time table for T-TEP Training, displayed in the notice board ?
Institute should have time table ( min 4 hrs. / week ) in place in sync with T-TEP Syllabus provided by TKM and it should be displayed in the notice board.
Insert Photograph
Target Date of completion
Date:
Scope of Improvement Snap shot of the web portal / attached hard copies of portal
Insert Photograph
Target Date of completion
Date:
2. Operation
2.11. Does the institute have explained training schedule & importance of KPIs to all students?
Institute should explain training schedule and importance of KPIs to all students.
Explained to all ó 2
YES
Explained to few students. ● 1
Not explained O 0
Insert Photograph
Target Date of completion
Date:
2.12. Does the institute have Plan for Adherence of T-TEP Syllabus.
Institute should Plan & Adhere T-TEP Syllabus.
Insert Photograph
Target Date of completion
Date:
2. Operation
2.13. Does the institute have Communication Adherence (Monthly Reporting through Web Portal)
Institute should update monthly Examination & Attendance Report in T-TEP Online Web Portal
On time report ó 2
NO
Delay more than week or more O 0
Scope of Improvement Snap shot of the Web Portal update /Attach hard copy of the portal
Insert Photograph
Target Date of completion
Date:
3. Manpower
3.1. Instructors : Does the institute has TKM trained instructors ?
T-TEP workshop should have minimum of 1 for 1 Batch & 2 for 2 Batches [units] instructors trained at TKM training centers.
No trained instructor O 0
3.2. Instructors : Does the institute has backup Instructors Trained by TKM ?
T-TEP workshop should have minimum of 1 backup instructor trained at TKM training centers.
4.2. Air Conditioner / Fans: Are the AC/Fans in the T-TEP Classroom are working properly?
AC/Fans in the T-TEP Classroom should work properly.
Insert Photograph
Target Date of completion
Date:
4. Asset
4.3. Is the classroom have Whiteboard in good condition ?
T-TEP Classroom should have white boards in good conditions in which the instructor can use for training with no problem
Insert Photograph
Target Date of completion
Date:
Working properly 2
YES
Not working properly O 0
Insert Photograph
Target Date of completion
Date:
4. Asset
4.5. LCD Projector : Is the LCD Projector in good condition.
T-TEP Classroom should have the LCD Projector which is in good condition with proper working.
Working properly 2
YES
Not working properly O 0
Insert Photograph
Target Date of completion
Date:
Insert Photograph
Target Date of completion
Date:
4. Asset
4.7. Lighting : Is the T-TEP Workshop has good Illumination?
T-TEP workshop should have good illumination (about 400 - 500 lux). All lights installed in the Workshop should be in the working condition.
4.8. Air Conditioner / Fans: Are the AC/Fans in the T-TEP Workshop are working properly?
AC/Fans in the T-TEP workshop should work properly.
Insert Photograph
Target Date of completion
Date:
4. Asset
4.9. Is the roof in the workshop in good condition ?
T-TEP Workshop should have roof which is in good condition
Good 2
YES
Poor O 0
Insert Photograph
Target Date of completion
Date:
Insert Photograph
Target Date of completion
Date:
4. Asset
4.11. Measuring Instruments : Are all measuring instruments are properly calibrated ?
All the measuring instruments should be usable condition with proper calibration.
Measuring Instruments :Vernier Calipers,Micrometer,Dial Gauge,Caliper Gauge,Cylinder Gauge,Plastigage,Spark Plug Gauge,Thickness Gauge, Filler gauge, Hydrometer, Straight edge, V- Block (Large), Surface Plate, Torque Wrench.
4.12. Power & Air connections : Are all power & air [Pneumatic] connections are in good conditions.
All power & air [Pneumatic] connections should be in good condition.
Insert Photograph
Target Date of completion
Date:
5. Kaizen
5.1. Kaizen Submission: does Institute submit Kaizen on Quarterly basis
T-TEP Institute should submit Kaizens on Every Quarter
Insert Photograph
Target Date of completion
Date:
Once In year O 0
WILL DO
Insert Photograph
Target Date of completion
Date:
6. Safety
6.1. Safety Awareness: does all students have awareness of safety
Institute should display safety awareness posters other then TKM provided
add Questions
Target Date of completion
Date:
6.2. Safety PPE's : Does Institute have procured all kind of safety PPE's as per Toyota Standards
BP Institute: Institute should have procure safety PPE's as per Annexure 3.6 [Recurring investment once in a year].
GT & SA Institutes: Safety Shoes & Cotton gloves
Insert Photograph
Target Date of completion
Date:
6.4. Fire Extinguisher : Does Installed Fire Extinguisher are in working condition.
Institute should refill & calibrate [Monthly check] Fire Extinguisher as per Standards