This engineering document presents plans for proposed roofing works on Building 5201 at the Regional Science High School III in East Kalayaan, SBFZ. It includes a roof framing plan and elevation, dated January 8, 2018. The engineer overseeing the project is Eduardo B. Reyes Jr.
This engineering document presents plans for proposed roofing works on Building 5201 at the Regional Science High School III in East Kalayaan, SBFZ. It includes a roof framing plan and elevation, dated January 8, 2018. The engineer overseeing the project is Eduardo B. Reyes Jr.
This engineering document presents plans for proposed roofing works on Building 5201 at the Regional Science High School III in East Kalayaan, SBFZ. It includes a roof framing plan and elevation, dated January 8, 2018. The engineer overseeing the project is Eduardo B. Reyes Jr.
E NG INE E R SHEET CONTENT CADD DATE P RO JE CT T ITLE OWNER PROJECT NO.
PROPOSED ROOFING WORKS
EDUARDO B. REYES JR. F O R B U I L D I N G 5 2 0 1 ROOF FRAMING PLAN ROOF F RA M ING E L EV AT ION LOCA TIO N REGIONAL SCIENCE HIGH SCHOOL III SHEET NO. P R C NO : 77 200 P T R N O : 7877072 I S S U E D O N : JANUARY 8, 2018 EAST KALAYAAN, SBFZ T I N : 900774226 I S S U E D A T : O LO N GA PO CIT Y