1. Critically review how projects are sanctioned and financed, including options
appraisal
2. Plan and rationalize the most effective procurement route
3. Critically appraise and investigate different types of contract and reimbursement
strategies
4. Demonstrate knowledge of different types of contractual risk and exposures to
range of stakeholders.
5. Analysis of financial ratios on decision making.
5. Map out a project’s supply chain
6. Investigate a range of options available for conflict, dispute and alternative
dispute resolution
Scenario
Jurong Town Hall MRT station is the part of Jurong Region Line (first fully elevated)
project based in Singapore consisting stations between Pandan Reservoir and Tengah.
This MRT station project is expected to complete by 2027.
The contract J109 - design and construct of 3 JRL stations (JE4 station, JE6 station, JE7
station) and their associated viaducts spanning 3.6km was awarded to Daewoo
Engineering & Construction Co. Pte Ltd – Youngnam Engineering and Construction
Pte Ltd Joint Venture for S$320.4 million in July 2020.
Even though, the entire project is expected to complete by 2027, it was pushed to 2028
due to Covid Pandemic.
https://www.propertyguru.com.sg/property-management-news/2020/7/190392/lta-
awards-four-jurong-region-line-contracts-worth-682-5mil
http://jrl-construction.blogspot.com/2019/
https://www.lta.gov.sg/content/ltagov/en/newsroom/2020/7/news-
releases/LTA_awards_four_JRL_contracts.html
https://www.aurecongroup.com/projects/transport/jurong-region-line-j109-singapore
Tasks
Assessment criteria
Grade Descriptor
0-49 – Fail
50-59 – Pass
60- 69 Merit
70-100 Distinction
0-1 2 3 4 5
A very poor Poor attempt Good and Fair Very good Excellent answer is
answer. No to complete attempt to attempt in developed in
knowledge on the task. Partly complete the task completing the completing the task.
the required completed with some task with Required
subject areas. No procurement understanding on properly tailored information was used
procurement plan the procurement procurement in preparing an
3 plan is presented. plan plan for the excellent
project procurement plan.
Proper justifications
were also mentioned
with an excellent
critical analysis.
0-1 2 3 4 5
Insufficient Little amount Good effort to Very good Excellently used
references were of references include amount of references. The
used and no were used and references to the references were amount of references
proper has shown report. Some used. is more than
referencing inconsistency amount of Referencing sufficient and the
9 styles were used. in referencing. inconsistency style is also very referencing
was observed in goof according guidelines were
citing the to the given properly followed.
references guidelines.
Softcopy of the assignment should be uploaded to ICBT SIS on or before the deadline.
In addition to this the softcopy of the assignment should be uploaded to the
TURNITIN via Cardiff Met Moodle.
MSc-7024 -2000000
Students are expected to keep a backup of all the assignments. ICBT and Cardiff
Metropolitan University have all the right to re call for soft copy of any assignment at
any time during the course.
Please note that plagiarism is treated as a serious offence and therefore the work you
produce must be individual and original although may work in groups in some
instances (Please refer to Student Handbook on Plagiarism & Cheating).
Please note that the submission date given for this assignment is the final date that you
can upload the assignment. No late submissions are allowed by the system. (Please
refer to the Student Handbook on Assessments - Late Submissions).
Please include the assignment coversheet in your answer. Please avoid copying
assignment question in your answer file.