Professional Documents
Culture Documents
L1-2.01
D
CK
NON-ACCESSIBLE M
U
M BU
ILDIN
A
(TOWER E)
G SETBA
TB
CK
SE
FFL +35.45
ING
G
POOL PUMP
ROOM
FFL +35.50
ILD
CHANGING
ROOM (M)
BU
FFL +36.75
E-ST2
MM
PARAPET WALL TO
MANAGEMENT
OFFICE
FFL +35.60
L1-2.01
CHANGING
ROOM (F)
44
FFL +37.00
91
HR FT
JANITOR
FFL+35.50
ARCHITECT'S DETAIL
FFL +35.50
PS
ELEC CORR.
LIFT
E-LF1
STORE
TEL / ELV BOMBA
WR
SP
CW
E-ST1
ABOVE GROUND LEVEL WITH 100MM
Ø PVC PERFORATED PIPE WRAPPED
PS - ST
D-ST1
FL. +36.75 WL. +36.75 TOW. +36.75 CADANGAN PEMBANGUNAN SEBUAH BANGUNAN PERNIAGAAN
(SCHOOL)
FFL+35.50
FG. +36.70 YANG MENGANDUNGI :-
G SETBACK
A - ST1
UP
TYPE C
03
A) 1 BLOK MENARA A 12 TINGKAT PEJABAT DAN KEMUDAHAN DI
TINGKAT BUMBUNG
15240MM BUILDIN
150MM X 900MM X 11MM THK. BL. +36.35 BL. +36.35
TYPE A2-1
02
B) 1 BLOK MENARA B 28 TINGKAT PEJABAT (376 UNIT)
SCREEDING
(MIRROR OF A2-1)
A,B-ST1
R.C STRUCTURE TO ENGR'S DETAIL
VOID
ELEC
TYPE B3
B - ST1
UP
LIFT MOTOR FFL +36.30 MEZZANINE YANG MENGANDUNGI TEMPAT LETAK KERETA, SURAU,
PORCELAIN MOSAIC TILES IN LIGHT BLUE
CW ROOM
A,B-LF4 A,B-LF2
06 SMTV WR
LIFT
REFUSE
A,B-LF5 BOMBA
LIFT
HR
WR
HR&
(BASEMEN 1 - BASEMEN 4) DI ATAS LOT 64627 (LOT PT 288),
SP HR
TOWER AB
MULTI PURPOSE
HALL
FFL+35.50
TRANSFER BEAM ADHESIVE & GROUTED WITH DAVCO COLOR PERSIARAN SUBANG PERMAI, USJ 1, SUBANG JAYA,
FFL +37.55
MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSAN.
FFL+35.50 GROUT C/W SCREEDING
CHANGING
ROOM (F)
CHANGING
ROOM (M)
GYM
PREPARATION
AREA UNTUK TETUAN:
HCK BUILDERS SDN. BHD.
15240MM BUILDING SETBACK
100MM Ø PIPE SLEEVE R.C STRUCTURE TO ENGR'S DETAIL 30MM THK. DRAINAGE VERSICELL
TO ENGR'S DETAIL C/W 1 LAYER OF GEOTEXTILE TO
SPECIALIST'S DETAIL
30MM THK. DRAINAGE VERSICELL R.C CURB TO ENGR'S DETAIL WITH 10MM THK. PEBBLEWASH IN LIGHT
C/W 1 LAYER OF GEOTEXTILE TO GREY COLOR (GCH) LAID ON ORDINARY PORTLAND CEMENT AS
SPECIALIST'S DETAIL BINDER MATRIX WITH 25MM THK. CEMENT SAND SCREED
AIWAH / SNA MT
L1-2.01 SCALE 1 25