a Republic ofthe Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS:
ROMBLON
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE IV-B
‘Odiongan, Romblon
CERTIFICATION
This is to certify that the herein attached contract was made and entered into by and
between the Department of Public Works and Highways represented by ELENA M.
CASTILAN, in her capacity as District Engineer, with office address at Odiongan,
Rombion, herein after called the Owner and SUNWEST CONSTRUCTION AND
DEVELOPMENT CORPORATION by ADERMA ANGELIE D. ALCAZAR, No. 1108
Textite Tower, Ortigas Pasig City (Provincial Address) Washington Drive, Legaspi City,
herein called the Contractor for the CONSTRUCTION OF CAUSEWAY/SHORE
PROTECTION, POBLACION, CONCEPCION, ROMBLON is In accordance with all
existing law, rules and regulations.
Issued this 2nd day of March 2022 in accordance with section 7 ¢ of Executive
Order No.109 dated March 27, 2002.
ELENA M. CASTILAN
District Engineer /Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ROMBLON
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE 1V-8
COdiongan, Romblon
Contract ID :22EH0040
Contract Name : CONSTRUCTION OF CAUSEWAY/SHORE
PROTECTION
Location of the Contract : POBLACION, CONCEPCION, ROMBLON
CONTRACT AGREEMENT
ENT CORPORATION
THIS AGREEMENT, made this 2nd day of March 2022 between The
Department of Public Works and Highways (DPWH), Rombion District
Engineering Office, represented herein by ELENA M. CASTILAN, District
Engineer, with main office address at 014 J.P. St, Tabin-Dagat, Odiongan,
Rombion, hereinafter called the “ENTITY”, and SUNWEST CONSTRUCTION
AND DEVELOPMENT CORPORATION, with Business address at No. 1108
Textite Tower, Ortigas Pasig City (Provincial Address) Washington Drive, Legaspi
City, represented herein by ADERMA ANGELIE D. ALCAZAR, President/CEO,
hereinafter called the “CONTRACTOR”.
SUNWEST CONSTRUCTION AND
Tresident/CEO
WHEREAS, the ENTITY is desirous that the CONTRACTOR executes
Contract ID NO. 22EHO040 — CONSTRUCTION OF CAUSEWAY/SHORE
PROTECTION, POBLACION, CONCEPCION, ROMBLON, hereinafter called
the “Works”, and the ENTITY has accepted the Bid for Fifty-One Million Seven
Hundred Thirteen Thousand Three Hundred Eighty-Two Pesos and
‘Twenty-Five Centavos Only (Php 51,713,382.25) by the Contractor for the
execution and completion of such works and remedying of any defects therein.
tem No. Description unit | Quantity | unitcost | Total Cost
ART A= FACILITIES FOR THE ENGINEER:
Provision of Combined Fleld Office,
‘A..1(6) | Laboratory & Living Quarters Bullding for | months | 8.33 | 16,361.34 136,289.96
‘the Engineers (Rental Basis)
Provision of 4x2 Pick Up Type Service
‘A1.2(4) | Vehicle for the Engineer on Bare Rental | months | 8.33 | 31,235.29 | 260,189.96
Basis
Subtotal | 396,479.92
PART B= OTHER GENERAL REQUIREMENTS
B.4(1) | Construction Survey and Staking [km [0.12 | 90,209.09 | 9,914.09
3.5 | Project Billboard) Signboard each _| 4.00 4,956.00 4,956.00
5.72) | Occupational Safety and Health Program | 1s. a:00” | 374,700.00 | 373,700.00.
2 B.8(1) | Traffic Management month | 8.33 | 46,109.28 | 384,089.96
8 3.9 _ | Mobiiization/Demobilization ~ is. 1.00 | 334,530.00 | 334,530.00
z oe Se ‘Sub-totat | £,105,187.95.
Se PART C= EARTHWORK
& 103(4)a-_| Structure Excavation (Comman Soil) eum] 155.0 57.8 7a aa8 5a
BS 104(3}2__| Selected Borrow for topping, case 4 ‘cum | 924.46 | 3,174.68 |
‘Subst
oft PART D = SUBBRSE AND BRSE COU
gs 200(4) | Agaregate Subbase Course ‘Gum_| 198.00] 2,463.29 | 487,733.42
aos g Sub-total ‘487,734.42
2 PART E=SURFACE COURSE = eee a
a3 > Portland Cement Concrete Pavement |
be GB yr [mos eames au aaa ||| ese
£38 tS Sub-total | 3,104, 68a.68
384 322 [panrrcunce constuction |
SZES(e a | sostie [Reinforcing test, Grade 0 EE
SRawee
age ras iz
gz gs TG ppwe-wer-si-2016 Page 10F 4Contract ID + 22EHO040
Contract Name : CONSTRUCTION OF CAUSEWAY/SHORE
PROTECTION
Location of the Contract : POBLACION, CONCEPCION, ROMBLON
;
| Ttem No. Description Unit Quantity ‘Total Cost
Sz 405(1)a2_| Structural Concrete Class “A”. cum 359.04 | 3,316,617.63
Zo 4,192,096.17,
ze PART G= DRAINAGE AND SLOPE PROTECTION STRUCTURE
os g '505(i)d _ | Riprap (Class D) m_| 2,480.13, 20,486,700.64
E =z '509(1)b1 | Stee! Sheet Pile (Slope Protection). 200.00 13,551,736.00
BS CS Cppior | pesien Sopra a eet
g js S| ener Goan aa ‘soissh2t
Es #8 ee
z 5 a PART H— MISCELLANEOUS STRUCTURES
8 Bo ‘600(7) | Curb and Gutter (Precast) Pe 220.00 278, 97,989.60
B/ N28 | gmt) 1 Samat acon ts) aon | “anat —[— faites | — eaten
ue Saath | sutsrttb sues tan ao | araao.oo | as20 300
bs Use zoom teas
3a : Sean Ton ee
a8 Se!
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
1. In this Agreement, words and expressions shall have the same
meanings as are respectively assigned to them in the Conditions of
Contract hereinafter referred to.
2, The following documents as required by the 2016 revised
Implementing Rules and Regulations of Republic Act No. 9184 shall be
deemed to form and be read and construed as part of this Agreement,
viz.
a, Philippine Bidding Documents (PEDs);
i. Drawings/Plans;
ii, Specifications;
iii, Bill of Quantities;
iv. General and Special Conditions of Contract;
v. Supplemental or Bid Bulletins, if any;
b. Winning Bidder’s bid, including the Eligibility requirements,
Technical and Financial Proposals, and all other documents or
statements submitted;
Bid form, including all the documents/statements contained in the
Bidder's bidding envelopes, as annexes, and all other documents
g submitted (e.g., Bidders response to request for clarifications on the
3 bid), including’ corrections to the bid, if any, resulting from the
Ss Procuring Entity’s bid evaluation;
3 6 c. Performance Security;
gen d. Notice of Award of Contract and the Bidder's conforme
Be S § thereto; and
fee J BS
gst 38
Spo 42
3 £ & 8
eRe ae - ee
ERE SHS shane stoie vege oFContract ID + 22EHO040
Contract Name. : CONSTRUCTION OF CAUSEWAY/SHORE
PROTECTION
Location of the Contract : POBLACION, CONCEPCION, ROMBLON
e. other contract documents that may be required by existing
laws and/or the Procuring Entity concerned in the PBDs.
Sz 2 Winnii i hi litional__contract
28 dos is i ribed by the GPPB that
és al ired for submission after the
ES = cont i i Pi
32 a Variation and Wal
—s 4 form part of the Contract
2 a
8 z Zo 3. In consideration for the sum of Fifty-One Million Seven Hundred
Bs <5 Thirteen Thousand Three Hundred Eighty-Two Pesos and
3 z Twenty-Five Centavos Only (Php 51,713,382.25) of such other
ze g sums as may be ascertained, SUNWEST CONSTRUCTION AND
ga BS 2 DEVELOPMENT CORPORATION agrees to execute and complete
the works and remedy of any defects therein in accordance with
his/her/its Bid.
4, The Department of Public Works and Highways (DPWH),
Romblon District Engineering Office, represented herein by
ELENA M. CASTILAN, District Engineer, agrees to pay the above-
mentioned sum in accordance with the terms of the Bidding.
5. That, after completion of the project, failure or refusal on the
contractor to undertake repair works within ninety (90) days from
demand of the HOPE on account of the use of materials of inferior
quality, “the Procuring Entity shall_undertake such repair
I_ be entitled to full reimbursement of expenses
Incurred therein upon demand” as provided under Section
62.2.2.1 of the RA 9184. “All payables of the GOP in his favor
shall be offset to recover the cost” (Underlining supplied)
IN WITNESS whereof the parties thereto hav ed this Agreement to be
executed the day and year first before writ
ELENA M. CASTILAN
District Engineer h
ADERMA ANGELIE D, ALCAZAR
g
£ for: for:
z=8 Department of Public ‘Sunwest Construction And
ES Works and Highways Development Corporation
(DPWH), Romblon DEO
ay
a=e 2
2 43 Witnessed by:
fay a j
£83 2
Seo S22
ges a
BE
see Wee
ese WA —_DPWH-INFR-51-2016 Page 3 of 4MENT CORPORATION
%
“
3
z
a
a
7
&
g
z
SUNWEST CONSTRUCTION AND
DEVE!
I. CASTILAN
Department of Public Works and Highways
District Engineers
Romblon District Engineering Office
Republic of the Philippines
ELEN,
REPUBLIC OF THE PHILIPPINES )
PROVINCE OF ROMBLON )ss.
MUNICIPALITY OF ODIONGAN )
BEFORE ME, as the Notary Public for and within the Province of Romblon,
personally appeared ELENA M. CASTILAN, District Frgineer, representing the
REPUBLIC OF THE PHILIPPINES (Department of Public Works and Highways),
with Residence Certificate No. 00038694 issued on January 6, 2022 at
Odiongan, Rombion, and ADERMA ANGELIE D. ALCAZAR President/CEO,
representing SUNWEST CONSTRUCTION AND DEVELOPMENT
CORPORATION with Community Tax Certificate No. 01341902 issued on
January 12, 2022 at City of Legazpi, known to me to be the same persons
who executed the foregoing CONTRACT and AGREEMENT and they
acknowledged to me that the same is their true act and deed for and in behalf of
the parties they represented,
This instrument consists of four (4) pages, including on this page, on which this,
acknowledgement is written duly signed by the contracting parties and their
witnesses on the left margin of the other page.
IN WITNESS WHEREOF, I have hereunto affixed my Signature and Official
Seal this Qf Haylee? 207.
Doc No.
Page No.,
Book No._ Zot
Series of 2022
DPWH-INFR-51-2016 Page 4of 4