You are on page 1of 5
'SUNWEST CONSTRUCTION AND ep ote Pines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROMBLON DISTRICT ENGINEERING OFFICE REGIONAL OFFICE VS ‘Goong, Rambion Contract 2280136 Contract Name # CONSTRUCTION OF SEAWALL/CAUSEWAY AT LANAS. Location ofthe Contract: SAN JOSE, ROMBLON. ‘CONTRACT AGREEMENT. THIS AGREEMENT, made this 15% day of July 2022 between ‘The Department of Public Works and Highways (DPWH), Romblon District Engineering Office, represented herein by ELENA M. CASTILAN, Distt Engineer, With main ofice address ot 014 3.P. St. Tabin-Dagat, Odlongan, Romblon, hereinafter called the “ENTITY”, and SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION, with Business address at No. 1108 Textite Tower, Ortigas Pasig Ciy (Provincial Address) Washington Drive, Legaspi City, represented herein by ADERMA ANGELIE D. ALCAZAR, Present/CEO, hereinafter called the "CONTRACTOR". Q [ANGELIE D, ALCAZAR WHEREAS, the ENTITY Is desirous that the CONTRACTOR executes Contract 1D NO. 22EH0136 - CONSTRUCTION OF SEAWALL/CAUSEWAY AT ANAS, SAN JOSE, ROMBLON, hereinafter called the "Works", and the ENTITY has sccepted the Bid for Ninety-Four Million Fifty-Six Thousand Six Hundred Eighty-six Pesos and One Centavo Only (Php 94,056,686.01) by the Contractor forthe execution and completion of such works and remedying of any defects therein i | { i £ a — Deepen | PART AS PACTS FoR Tie BREE - | revo Contin a Oc, ‘sx.1@ | ttt ring ents ead | monte | 1123 | anansoo|] — 210senos | rete 55 Up ye sae - —t sae | Weideermetnamerortow’™” | monte | a3 | soannoe | annem | Par 8 OTEK cent wrguanenes — ‘Const ure an ting | kn aaa [5090 7000 5 | rot bibaa/Soninad "|e _| 100 | asa | “aso | Segestetsameventtenns TL. | 00 [emeassi | ome ot anion ———| ts —| a9 — sz snn00 | —suzsze00 —1 Eset | aaa f [aaa et cin ener so_[ cam] suse] sec] — sana] & soap | Eeanment om Srow com | 190.39 | swmaso | aeasesa0 fe insan-| SEI eer | som] samara | gaa DS 2) ==. #3 yt {ere 0.2 mi 2a z Be def £8 Contract 1D 22EH0136 Contract Name # CONSTRUCTION OF SEAWALL/CAUSEWAY AT LANAS. Location ofthe Contract: SAN JOSE, ROMBLON na) orc Sena toon aa) Sar rb sec Ug, NOW THIS AGREEMENT WITNESSETH AS FOLLOWS: 1. _Inths Agreement, words and expressions shall have the same meanings as ‘are respectively assigned to them in the Conditions of Contract hereinafter refered to, 2. The ‘olloning documents as required by the 2016 revised Implementing Rules and Regulations of Reputile Act No, 9184 shall be deemed to form and be read and construed as part of this Agreement, viz: 8. Philpine Bidding Documents (PBDs); 1. Drawings/Plans; ‘Speciation; Bil of Quantities; \. General and Special Conltons of Contract; ¥. Supplemental or Bc Billets, any, b, Winning Bidders bid, including the Elgibity requirements, Technical ‘and Financial Proposals, and all other documents or statements submited; Bid form, induding all the decuments/statements contained in the Bidler’s bidding envelopes, as annexes, and all other documents submitted (e.., Bidders response to request for clarfcations on the bi), including corrections to the bi, iF any, resulting from the Procuring Extys bid evaluation; g i a Performance Security 4. Notice of Award of Contract and the Bidder’sconforme thereto; ‘ether documents that maybe required by existing laws and/or the Procuring Entity concerned in the PBDS. Deparment of Pune Werks ad Highways é B i ‘Winning Bidders agrees gis a ‘prescribed by the GPPB that are subsequently required for ey BY Ee ee BRE zo likewise form part of the Contract FETED ssscssme a ro Contract 1D +: 22EH0136 Contract Name CONSTRUCTION OF SEAWALL/CAUSEWAY AT LANAS, Location ofthe Contract: SAN JOSE, ROMBLON In consideration for the sum of Ninety-Four Million Fifty-Six Thoweand Six Hundred Eighty-six Pesos and One Centavo Only (Pho 94,056,686.01) or such other sums as may be ascetained, SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION agrees to execute and complete the works and remedy of any defects therein in accordance with his/her id. 4. The Department of Public Works and Highways (DPWH), Romblon District Engineering Office, represented herein. by ELENA M. CCASTILAN, District Engineer, agrees to pay the above-mentioned sum in ‘accardance withthe terms of the Bidding, IENT CORPORATION 5, Thal after completion ofthe projec, fallure or refusal on the contractor to undertake repair works within ninety (80) days from demand of the HOPE ‘on account of the use of materials of inferior qually, “the Procuring SSUNWEST CONSTRUCTION AND it nd” as provided under Section 62.2.2. of the RA 9184. “All payables of the is favor shall (underlining supplied) IN WITNESS whereof the parties thereto have caused this Agreement to be executed the day and year rst before written. Citas ELENA M. CASTILAN, Dist Engine ADERMA ANGELIE D. ALCAZAR for ‘Sunwost Construction and iu Hs ef BY BPs qe HEED scwcmascae - resets REPUBLIC OF THE PHILIPPINES) PROVINCE OFROMBLON ss, MUNICIPALITY OF ODTONGAN ) sz BEFORE ME as the tary Pfr and tin the Prine of Ronn, any Shpened ELENA'M, CABTILAN, Dict Eg ersetg the REPUBLIC OF 3 TRE Muremes"ospatment of ric wore and hoy) with Rese Cote io, 003864 eset on nuary 6, 2022 st Olongar, Romblon, a 3 ADERMA "ANGELIE, D.ALCRZAR Pesca rewereingSUMWEST ‘CORPORATION. CONSTRUCTION AND DEVELOPMENT CORPORATION with Communty Tax CCrtfiate No, 01341902 issued on January 12, 2022 at City of Legazpi, known fg {2.me to be the some persins who executed the foregoing CONTRACT and [NGREEMENT and they acknowledged to me that the same Is their ue act and deed for and in behaf ofthe partes they represented. ‘SUNWEST CONSTRUCTION AND ris sumer costs of four (4 pages ang on ts page on whch the 2einonfegunt een dyed the cncing parte de wines rie it nrg othe er Page IN WITESS WHEREO, hve her fd Signature ond Ol Sal hs Seat ae nouiyt POLO thy pa acne. #2 a Book No.1V# bt a) Sores of 2022 : Z a5 oft bad eee BS eee ah Bs ge Hl Go scacar——— - etre Repti the Pines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS. ROMBLON DISTRICT ENGINEERING OFFICE REGIONAL OFFICE V8 ‘ders, Ronbin CERTIFICATION ‘This isto erty thatthe herein attached contract was made and entered into by and between the Department of Pubic. Works and Highways represented by ELENA M. CCASTILAN, in her capacity as District Engineer, with office address at Oclongan, Rombion, herein after called the Cuner and SUNWEST CONSTRUCTION AND DEVELOPMENT CORPORATION by ADERMA ANGELIE D. ALCAZAR, No, 1108 Textite Tower, Ortigas Pasig Cty (Provincial Adress) Washington Drive, Legaspi City, herein called the Contractor for the CONSTRUCTION OF SEAWALL/CAUSEWAY AT LANAS, SAN JOSE, ROMBLON is in ‘2ccordance with all existing law, rules and regulations. Issued this 25th day of July 2022 in accordance with section 7 cof Executive Order No.109 dated March 27, 2002, ELENA M. CASTILAN Distt Engineer]

You might also like