You are on page 1of 4

[MPA004] [04]

ASSIGNMENT 04
Management Principles and Application

Colombo School of Construction


Technology

Ms. Aparna Samaraweera

hassaan

CSCT2010197 Page 1
[MPA004] [04]

Acknowledgment

It’s a great pleasure to me to acknowledge this assignment “Communication, Sustainable


Construction & Environmental Management”, under the subject of Management principles
& application.

I would like to thank my lecturer Ms. Aparna Samaraweerawho guided me and gave me
a good knowledge about “Management Principles and Application” which is a very
important subject to my carrier.

And also I would like to thank my friends who support me to do this assignment
successfully even by words and thoughts. I thank every person who helps me to my carrier.

CSCT2010197 Page 2
[MPA004] [04]

Introduction

As a quantity surveyor to have to have the good practice, Management Principles and
Application is an important subject to gained the knowledge of Management Principles and
Application to the critical path using the following network diagram and quality managed and
Estimated cost, actual cost, cost planning, cost control, cash flow, monitoring of construction
and installation work and quality standards and statutory compliance are achieved in a project

To perform these tasks I used several books, tutorials, websites and consulting with
professionals. I hope the given explanations should fulfill the tasks.

CSCT2010197 Page 3
[MPA004] [04]

Contents
TASK 01 ................................................................................................................................................... 5
Draw a typical sketch site layout and accommodate all relevant resources. (P10) ................................ 5
TASK 02 ................................................................................................................................................... 9
Identify critical path using the following network diagram (P11). ....................................................... 11
Critical path of net work diagram ....................................................................................................... 12
TASK 03 (P12) ........................................................................................................................................ 13
TASK 04 ................................................................................................................................................. 18
Discuss the methods employed to plan, schedule and manage the supply and utilization of resources
(P13).................................................................................................................................................. 18
Concepts in the Development of Construction Plans ...................................................................... 18
Estimating Resource Requirements for Work Activities .................................................................. 20
TASK 5 ................................................................................................................................................... 22
Briefly explain how quality managed and quality standards and statutory compliance are achieved in a
project (P14) ...................................................................................................................................... 22
Construction Quality Control ......................................................................................................... 22
Different Steps in Construction ...................................................................................................... 22
Conclusion............................................................................................................................................. 25
Reference .............................................................................................................................................. 26

CSCT2010197 Page 4

You might also like