You are on page 1of 7

CURRICULUM VITAE

Personal information

Name : Deni
Date of birth : Sukabumi, 01 st March ,1990
Gender : Male
Nationality : Indonesian
Marital Status : Married

Address : Kp.Cimapag Rt. 010/003


Desa Buniwangi
Kec.Palabuhan Ratu,
Kab.Sukabumi West Java

Telephone : 081281649982
No. Pasport : C6968422
Email : denietea01@gmail.com

Personal skills and competences

▪ Mother Tongue : INDONESIAN

▪ Another Language : ENGLISH

▪ Social skill : Good interpersonal and team work


skill, hard worker.

Training

▪ BOSIET,Huet,Sea Survival & Tsbb Opito Training at SMTC Group

▪ Electrical Habilitation Level1 APAVE QATAR W.LL


▪ H2S Hazard Training Samson Tiara

▪ PASPOR
_______ Work Experiences

1. Period of service 06 th Sept ,2022 up to 30 st Nov ,2022


Occupation Instrument and Control Technician Commissioning

Project Name ZAWTIKA 1D WHP PROJECT


Company PT.GUNA NUSA UTAMA FABRICATORS
Responsibilities

- Instrument loop test, function test, Calibration and troubleshoot.


- Presure Transmiter,ON/OFF Valve,Level Transmiter,Temperatur
Transmiter,Gas Detector.

2. Period of service 15 th Dec ,2022 up to 06th Aug ,2022


Occupation Instrument and Control Technician Commissioning

Project Name Gallaf WHP project bath 2 Al-shaheen Oil


Field Qatar (Offshore)
Company PT.ANGKASA ENGINEER INDONESIA
(SMOE)
Responsibilities

- Instrument loop test, function test, Calibration and troubleshoot.


- Presure Transmiter,Level Transmiter,Temperatur Transmiter,ON/OFF
Valve,Control Valve,Gas Detector,H2S,Flame Detector.

3. Period of service 22 th Jun ,2021 up to 08 th Nov ,2021


Occupation Instrument and Control Technician Commissioning

Project Name Be halp PT.SMOE INDONESIA Gallaf WHP


Project bath 2(Onshore)
Company PT.ANGKASA ENGINEER INDONESIA
(SMOE)
Responsibilities

- Instrument loop test, function test, Calibration and troubleshoot.


- Presure Transmiter,Level Transmiter,Temperatur Transmiter,ON/OFF
Valve,Gas Detector.

Period of service 24th Dec ,2020 up to 08th March,2021

Occupation Instrument and Control Technician Commissioning

Project Name MERAKES PROJECT ENI MUARA BAKAU (Offshore)

Company PT.ADIARTHA SWABUANA (SAIPEM)

Responsibilities

- Instrument loop test, function test, Calibration and troubleshoot.


- Presur Transmiter,Level Transmiter,Temperatur Transmiter,ON/OFF
Valve,Control Valve,Gas Detector,Flame Detector

4. Period of service 24 th Feb 2020 up to 30th June 2020


Occupation Instrument and Control Technician Commissioning

Project Name PLTU UNIT 4 LONTAR PROJECT 1X315 MW


Company PT.HAMAN ENERGI INDONESIA (Black And
Veatch)
Responsibilities
- Instrument loop test, function test, Calibration and troubleshoot
- Presure Transmiter,Temperatur Transmiter,Level Transmiter,ON/OFF
Valve,Control Valve,MOV AUMA,ABB,ROTORK.

5. Period of service 30 th Sep 2019 up to 19 th Feb 2020


Occupation Instrument and Control Technician Commissioning

Project Name Proyek Pembangunan NPK Fusion II 2 X 100.000 MTPY

PT.Pupuk Sriwidjadja Pusri _Palembang

Company PT.WIJAYA KARYA (persero)

Responsibilities
- Instrument loop test, function test and troubleshoot
- Presure Transmiter,Temperatur Transmiter,Limit Switch,ON/OFF Valve,Control
Valve.
6. Period of service 24 th Jan 2019 up to 30th Sept 2019
Occupation Instrument and Control Technician Commissioning

Project Name Project EPPC Pengembangan dan Modernis


PG. Assembagoes
Company PT.WIJAYA KARYA (Persero)
Responsibilities
- Instrument loop test, function test and troubleshoot
- Presure Transmiter,Temperatur Transmiter,Level Transmiter,Limit Switch,ON/OFF
Valve,Control Valve.

7. Period of service 20 th Mar 2018 up to 20th Dec 2018


Occupation Instrument and Control Technician Commissioning

Project Name Palm Cooking Oil Plant Project 600.000MTPY


Sei Mangkei Simalungun-North Sumatera
Company PT. WIJAYA KARYA Persero Tbk
Responsibilities
- Instrument loop test, function test, troubleshoot & Calibration Equipment
Transmitter
- Presure Transmiter,Temperatur Transmiter,Limit Switch,ON/OFF Valve,Control
Valve.

8. Period of service Apr 05th ,2017 up to Mei 27th ,2017


Occupation Instrument and Control Technician
Project Name PT. PERTAMINA EP ASSET 4 CPP
GUNDIH (CEPU)
Company PT.TITIS SAMPURNA
Responsibilities
- Instrument loop test, function test, Sequence test, troubleshoot.
- Presure Transmiter,Temperatur Transmiter,Limit Switch,ON/OFF Valve,Control
Valve.

9. Period of service 20 th Jan ,2015 up to 31 st Jan 2017


Occupation Instrument and Control Technician Commissioning
Project Name Paket P3FP Non Crucible
ESF-4 jl.jendral ahmad yani No.5
Pomala,Kolalaka,Sulawesi Tenggara
Company PT. WIJAYA KARYA Persero Tbk
Responsibilities

- Instrument loop test, function test, Sequence test, troubleshoot.


- Presure Transmiter,Temperatur Transmiter,Level Transmiter,Limit Switch,ON/OFF
Valve,Control Valve.

10. Period of service 23 th Dec ,2014 up to 03th Feb 2015


Occupation Instrument and Control Skill 1
Project Name Jl.TB Simatupang Kav.150B Tanjung Barat
Company PT.ODG INDONESIA
Responsibilities

- Instrument loop test, function test, Sequence test, troubleshoot.

11. Period of service 09 th Jan ,2014 up to 30 th Jun 2014


Occupation Instrument and Control Technician Commissioning
Project Name ICA – CGA ALUMINA TAYAN
Company PT. WIJAYA KARYA Persero Tbk
Responsibilities

- Instrument loop test, function test, Sequence test, troubleshoot.


- Presure Transmiter,Temperatur Transmiter,Limit Switch,ON/OFF Valve,Control
Valve.

12. Period of service 01 st Dec ,2011 up to 30th Sept ,2013


Occupation Instrument and Control Skill 2
Project Name PLTU 2 JAWA BARAT 3 X 350 MW
Palabuhan Ratu Sukabumi
Company SHANG HAI
Responsibilities
- Instrument loop test, function test, Sequence test, troubleshoot.
- Presure Transmiter,Temperatur Transmiter,Level Transmiter,ON/OFF Valve,Control
Valve,MOV AUMA,

There By certified about information are and the best of my knowledge and can believed

You might also like