2.

UNITS
International System of Units (SI) shall be used in accordance with IPS
IPS-E
E-GN-100, unless
otherwise specified in that document.

3. SCOPE OF WORK & SUPPLY

3.1. SCOPE OF SUPPLY

Description of Material or Services Required:

Item Description Qty


1 Material summary According to Attach.
ttach. No.1
All drawings required to allow the installation of
2 valves and accessories (scale dimension drawing) According to Attach. No. 8
Calculation sheets & datasheet shall be included in the
quotation for each “Safety
Safety Relief Valves
Valves”
3 Software , special tools and manuals for operation and According to Attach. No.4
maintenance

4 Spare parts and consumable for erection ,Pre


,Pre- Vendor to advise
commissioning, commissioning & Start up

5 Spare parts and consumable for two years operation According to Attach. No.7
No.

6 Drawings and Documents According to Attach. No.3

Materials indicated in this document and attachments have to be intended as a guide.


Vendor is responsible of the selection of materials suitable for the specified working conditions.

3.2. SCOPE OF WORK


B0
Fabrication, Assembly, Shop tests and Inspection, Painti
Painting
ng and Marking of bellow mentioned
equipment with all related accessories.
Purchaser’s approval shall in no way be construed as relieving Vendor of any of his obligation,
responsibilities or liabilities under the CONTRACT and/or applicable Codes and Standards.
Standa