tc., shall be agreed with the Purchaser before proceeding. Any contradiction or difficulty in interpreting the different documents raised by the Supplier shall be notified to Purchaser to obtain their clarification. All the components shall be designed for the prevailing local ambient conditions.
5. SITE CONDITIONS For site condition please refer to the document 2055-ED-000-PR-RT-0001 "Site Condition Report".
B0 6. LIST OF ATTACHEMENTS
Document No. Document Title Attach. Rev.
1 Material Summery List 1 2 Letter Of Conformity 2 3 Vendor Data Requirement (VDR) 3 4 Special Tools 4 5 Deviation/Exceptions 5 6 Vendor Recommendation to Specifications 6 7 Spare Part List 7 8 2055-EP-000-IN-IP-0006 ITP For For Safety Relief Valves 8 Latest