You are on page 1of 21

EP 4-5-2

STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2


ERECTION SPECIFICATION Date: 04/2020
Page: 1 of 21

TABLE OF CONTENTS

1.0 SCOPE .......................................................................................................................................................2


2.0 REFERENCES ..............................................................................................................................................2
3.0 DEFINITIONS .............................................................................................................................................2
4.0 OVERLAY INSTRUCTIONS...........................................................................................................................2
4.1 GENERAL ..........................................................................................................................................................2
4.2 MODIFICATION TERMS ........................................................................................................................................3
4.3 PURCHASER REQUIREMENTS .................................................................................................................................3
5.0 TABLES ......................................................................................................................................................4
6.0 REVISION LOG ...........................................................................................................................................6
7.0 APPENDIX A – PIP STS05130 STRUCTURAL AND MISCELLANEOUS STEEL ERECTION .............SPECIFICATION
7

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 2 of 21

1.0 SCOPE
1.1 All structural and miscellaneous steel erection shall be in strict accordance with this Practice, the
applicable data sheet, and the referenced standards and publications.
1.2 Any deviation to this Practice shall be in accordance with the procedure given in EP 1-1-3.
1.3 A revision bar indicates all changes made to this revision.

2.0 REFERENCES
The latest edition of the following standards and publications are referred to herein.
Standards and Publications

Motiva Engineering Practices


EP 1-1-3 Deviations to Motiva Engineering Practices
EP 4-2-9 Nonshrink Cementitious Grout Specification
EP 4-2-20 Epoxy Grout Specification
EP 4-5-1 Structural and Miscellaneous Steel Fabrication Specification
EP 10-3-1 Shop and Field Painting
Process Industry Practices
PIP STS05130 Structural and Miscellaneous Steel Erection Specification

3.0 DEFINITIONS
3.1 Company – Motiva Enterprises LLC.
3.2 Contractor – Company or business that agrees to furnish materials or perform specified services
at a specified price and/or rate to the Owner.
3.3 Manufacturer – The recipient of a direct or indirect purchase order for materials and/or equipment.
In this context, a direct order is one issued to a manufacturer by a contractor or the Owner. An
indirect order is one issued to a manufacturer by a vendor (recipient of a direct order) for materials,
fabricated components, or subassemblies.
3.4 Owner – Motiva Enterprises LLC.
3.5 Owner’s Engineer – A Motiva Enterprises LLC appointed engineer.
3.6 Purchaser – The party placing a direct purchase order. The purchaser is the Owner’s designated
representative.
3.7 Vendor – Recipient of a direct purchase order.

4.0 OVERLAY INSTRUCTIONS


4.1 General
Paragraph numbers and modifications provided in Table 1 refer to PIP STS05130, August 2018
revision. Paragraph numbers may not be consecutive, and all PIP paragraphs not mentioned
herein shall be verbatim requirements of this Practice.
Any referral to approval by Owner or Company shall mean approval of Owner’s Engineer.

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 3 of 21

4.2 Modification Terms


4.2.1 (Add) – If information is “added” to an existing paragraph in the PIP standard, the requirements
of this Practice shall be read as a continuation of that particular PIP paragraph.
4.2.2 (Substitute) – If information is “substituted”, the affected PIP requirement shall be replaced in its
entirety by the requirements of this Practice.
4.2.3 (Revise) – If information is “revised”, the requirements of this Practice shall be read as a revision
to part of the particular PIP paragraph (i.e. changed sentence).
4.2.4 (New) – If information is “New”, it shall be read as an added requirement to the PIP standard (i.e.
new paragraph).
4.2.5 (Delete) – If information is “Delete”, to an existing paragraph in the PIP standard, the requirements
of that particular PIP paragraph shall be ignored.
4.3 Purchaser Requirements
A bullet (●) indicates that a decision by the Owner’s Engineer is required.

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 4 of 21

5.0 TABLES

Table 1 – Modifications to PIP STS05130,


Structural and Miscellaneous Steel Erection Specification

PIP STS05130
Term Description
Paragraph
2.0 –– References
–– Process Industry Practices (PIP)
2.1
Delete Delete PIP references.
4.0 –– Requirements
–– Products and Materials
4.2
Revise “PIP STS05120” to EP 4-5-1.
4.3 –– Execution
4.3.4 –– Setting Base Plates
Unless specified otherwise in contract documents, structural
base plates shall be grouted in accordance with EP 4-2-9,
Nonshrink Cementitious Grout. Grout shall not extend above the
4.3.4.5 Substitute bottom edge of base plate. Fill anchor sleeves with grout only if
specified in contract documents. Chamfer or cut off exposed
edges of grout at 45 degrees after grout has acquired its initial
set.
4.3.5 –– Bolted Connections
4.3.5.8 Add One-sided framed beam connections shall not be used
High-strength bolts in slip-critical and pretensioned connections
4.3.5.9 Add shall be tightened by means of load direct tension indicator (DTI)
washers.
Hardened washers shall be used as recommended by the
4.3.5.10 Add
manufacturer of the DTI washers.
If calibrated wrench tightening is used, calibration and tightening
4.3.5.11 Add
procedures shall comply with AISC 360.
Holes that shall be made in the field shall be drilled, cleaned of
4.3.5.12 Add
burrs and rough edges, and countersunk when required.
In locations difficult to access, a “starter” hole, no larger than 3/8
4.3.5.13 Add inch (10 mm) diameter, may be burned in the member. The
“starter” hole shall then be reamed to the required diameter.
4.3.6.2 Substitute All welds shall be completely seal welded.
Grating shall be fastened with galvanized mechanical grating
clamps capable of being installed from above grating surface.
4.3.9.2 Substitute Use a minimum of one fastener at each corner of each individual
piece of grating and two fasteners at each support member the
grating crosses.
4.3.9.3 New Floor plate shall be fastened with 3/8 inch (10 mm) countersunk
head bolts 18 inches (450 mm) on centers. Use a minimum of four

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 5 of 21

Table 1 – Modifications to PIP STS05130,


Structural and Miscellaneous Steel Erection Specification

PIP STS05130
Term Description
Paragraph
fasteners per panel, with one fastener within 4 inches (100 mm)
of each corner.
4.3.12 –– Coating Repairs
4.3.12.1 Revise “PIP STS05120” to EP 4-5-1.
Repair all erection damage to shop-applied paint coatings in
4.3.12.2 Substitute
accordance with EP 10-3-1.
4.3.13 New Finishing
Contact or faying surfaces of slip-critical connections shall be
4.3.13.1 New lightly scored by wire brushing or grit blasting after galvanizing
and prior to assembly.
Galvanizing shall not be applied within 2 in. from all edges
4.3.13.2 New
prepared for field welding.
All structural steel not receiving a galvanized coating shall be
4.3.13.3 New
painted in accordance with EP 10-3-1.
The shop prime coat shall not be applied within 2 in. from all edges
4.3.13.4 New
prepared for field welding.
The contact or faying surfaces of slip-critical connections shall not
4.3.13.5 New
be painted unless the paint is inorganic zinc.

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 6 of 21

6.0 REVISION LOG

Action Date Rev. Originator Approver Description

Motiva
Create 10/2018 0.0 Cason Horn First issuance of this practice.
Enterprises LLC

Motiva Magen Revised 1.1, S&P table and


Revision 02/2019 0.1
Enterprises LLC Stephens Table 1.

Motiva
Revision 04/2020 0.2 Drew Troyer Removed 4.4 through 4.4.3.
Enterprises LLC

Notes:
1) The timeframe for acceptance specified on the revision request form (EP 1-1-2 Form A) was exceeded. Thus,
in accordance with EP 1-1-2, Motiva Enterprises LLC is considered to have approved the proposed changes.
2) Company customization.

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 7 of 21

7.0 APPENDIX A – PIP STS05130 STRUCTURAL AND MISCELLANEOUS STEEL ERECTION


SPECIFICATION

PIP STS05130
STRUCTURAL AND MISCELLANEOUS STEEL ERECTION SPECIFICATION 08-2018

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 8 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 9 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 10 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 11 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 12 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 13 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 14 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 15 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 16 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 17 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 18 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 19 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 20 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21


EP 4-5-2
STRUCTURAL AND MISCELLANEOUS STEEL Revision 0.2
ERECTION SPECIFICATION Date: 04/2020
Page: 21 of 21

This document may not be used or reproduced without the permission of Motiva Enterprises LLC – Maintained by E2G

Printed copies are not controlled. Printed on 10/04/2021 18:50:21

You might also like