LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION

SUMMARY
MINIMUM TOTAL NO. OF HOURS
FIELD OF PRACTICE % (MAX)
CREDIT HOURS
balance/excess
ACCOMPLISHED

ARCHITECTURAL DESIGNING/DRAFTING, STRUCTURAL CONCEPTUALIZATION,


PLANNING & THE LIKE
30% 1152 1252 A
100
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF
MATERIALS, COST ESTIMATES, GENERAL CONDITIONS, BIDDING DOCUMENTS,
CLERK OF WORKS AND THE LIKE
25% 960 976 B
16
FIELD SUPERINTEDENCE, PROJECT MANAGEMENT ADMINISTRATION & THE
LIKE
15% 576 836 C 260
TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES, PROJECT
PROMOTIONAL, PRE-DESIGN & THE LIKES
10% 384 400 D 16
ARCHITECTURAL LAY-OUTING OF MECHANICAL ELECTRICAL, ELECTRONIC,
SANITARY, PLUMBING, COMMUNICATIONS AND OTHER UTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'L LIGTHING, ACOUSTICS AND ALLIED FIELD
10% 384 528 E
OF PRACTICE 144
ARCHITECTURAL INTERIORS/SPACE PLANNING, RESTORATION/PRESERVATION
AND OTHER ANCILLARY SERVICES
10% 384 460 F 76
TOTAL 3840 4452

PERIOD COVERED Corresponding Number of hours of Described Total No.


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP) of hours
Day Mo. Yr. Day Mo. Yr. A B C D E F
Project title: Ms. XX Residence
Location: Porac Pampanga
Conducted ar. Programming and feasibility 8 11 10 21 1 11 188 212
Schematic Design preparation 24 1 11 7 2 11 44 44
Consultation and presentation to client 8 2 11 18 2 11 36 36
Preparation of drawings for building permit 21 2 11 25 2 11 100 100
Architectural Interior space planning 28 2 11 25 3 11 80 80
Preparation of estimates, specifications and materials 28 3 11 2 5 11 92 92
Meeting with client and project approval 6 5 11 13 5 11 24 24
Application for building permit 16 5 11 23 5 11 24 24
Site Supervision 24 5 11 29 11 11 380 380
Preparation of Architectural shop drawings 1 12 11 29 12 11 48 48
Consultation meeting with client 4 1 12 13 1 12 32 32
Application for occupancy 16 1 12 31 1 12 48 48
Architectural Interior detailing 1 2 12 29 2 12 76 76
Final cost analysis of the project 1 3 12 23 3 12 68 68

TOTAL NO OF HOURS
192 232 380 280 0 156 1264

PERIOD COVERED Corresponding Number of hours of Described Total No.


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP) of hours
Day Mo. Yr. Day Mo. Yr. A B C D E F
Project title: Dr. XYZ Residence
Location: Villa Teresa, Brgy. Sto Rosario, Angeles City
Site Inspection, data gathering and analysis 2 5 12 11 5 12 64 64
Conducted ar. Programming and feasibility 14 5 12 25 5 12 80 80
Schematic Design preparation and rendering 28 5 12 15 6 12 112 112
Consultation and presentation to client 18 6 12 22 6 12 40 40
Preparation of drawings for building permit 25 6 12 17 8 12 304 304
Preparation of estimates, specifications and materials 20 8 12 21 9 12 184 184
Preparation of Bid documents and contracts 24 9 12 28 9 12 80 80
Architectural Interior Planning 1 10 12 12 10 12 80 80
Application for building permit 15 10 12 22 10 12 48 48
Site Supervision 23 10 12 27 3 13 352 352
Layouting of Electrical, mechanical, Sanitary, plumbing 2 2 13 27 3 13 480 480
Architectural show drawings 1 4 13 10 5 13 228 228
Preparation of Asbuilt plans 14 5 13 12 7 13 336 336
Architectural Interior Detailing 15 7 13 31 7 13 104 104
Application for Occupancy 1 8 13 23 8 13 96 96

TOTAL NO OF HOURS
980 408 416 120 480 184 2588
TOTAL NO OF HOURS
980 408 416 120 480 184 2588

PERIOD COVERED Corresponding Number of hours of Described Total No.


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP) of hours
Day Mo. Yr. Day Mo. Yr. A B C D E F
Project title: ABC Medical Arts building Renovation
Location: Rizal St. Balibago Angeles City
Site Inspection, data gathering and analysis 26 8 13 30 8 13 40 40
Asbuilt drawing of plans 2 9 13 6 9 13 40 40
Schematic Design preparation and rendering 16 9 13 20 9 13 40 40
Layouting of Electrical, mechanical, Sanitary, plumbing 23 9 13 30 9 13 48 48
Preparation of estimates, specifications and materials 1 10 13 15 11 13 256 256
Preparation of Bid documents and contracts 18 11 13 29 11 13 80 80
Architectural Interior detailing and planning 2 12 13 20 12 13 120 120

TOTAL NO OF HOURS
80 336 40 0 48 120 #NAME?
Prepared by:
Ar. Jan Philippe N. Cortes
Hope it will help! Cheers and good luck!