Risk Matrix and Categorization
5 Catas5tro
5 Supervisor attention
10needed. Monitor effectiveness of existing
15 controls and determine 20 Legal Compliance
25
to p
8 hic Moderate
(Mo d e rate ) Risk (Hig h) practicable.. (Extre me ) (Extre me ) (Extre me )
corrective actions where
Reputation
3 Mo d eConsequence
rate
3 Immediate and on-going
6 intervention is required from Senior9 management to ensure 12 15
= Catastrophic
(Lo w ) (Mo d e rate ) (Hig h) (Hig h) (Extre me )
control measures are adequate, irrespective of Probability/Likelihood
2 4 6 8 10
2 Mino r
(Lo w ) (Lo w ) (Mo d e rate ) (Mo d e rate ) (Hig h)
1 2 3 4 5
1 Ins ig nific ant
(Lo w ) (Lo w ) (Lo w ) (Lo w ) (Mo d e rate )
Hierarchy of Control
1. ELIMINATION
2. ISOLATION Date
3. SUBSTITUTION Dewatering Pipeline Project South, North Prepared:
Work Area: Contractor / Department: UMT/P&P Expire Date:
4. ENGINEERING Series
Review Date:
5. ADMINISTATION
Task/Activity:
6. PPE Hydro Test of Pipeline
JSA SUMMARY
STEP JOB STEP POTENTIAL HAZARDS Current Controls CURRENT REQUIRED HAZARD RESIDUAL
NO RISK CONTROL RISK
List the steps Against each step list the potential All those controls which are
SCORE SCORE
required to hazards that could cause currently implemented and in-place For each hazard identified list
perform the task in injury/damage when the task step the control measures required
the sequence they is performed. to eliminate or minimize the
are carried out. risk of injury.
Non Compliance with • Obtain Cold Work Permit & other
SECMC and Facility’s HSE associated permits
MS Procedures
1 Planning • Conduct tool box talk. L-3
Unauthorized Personnel • Barricade the area where hydro-
test is to be carried out
JOB SAFETY ANALYSIS (JSA) JSA #:
STEP JOB STEP POTENTIAL HAZARDS Current Controls CURRENT REQUIRED HAZARD RESIDUAL
NO RISK CONTROL RISK
List the steps required to Against each step list the potential All those controls which are
SCORE SCORE
perform the task in the hazards that could cause currently implemented and in-place For each hazard identified list
sequence they are injury/damage when the task step the control measures required
carried out. is performed. to eliminate or minimize the
risk of injury.
• Post warning signs
• Ensure the equipment/tool to be • All equipment, pressure
Defective used for hydro-testing (such as gauges, HT pump, generator,
hose, pump, coupling, pressure L-3
Tool/Equipment’s Electrical DB should be
gauge, spade, gasket etc.) are free inspected and tagged.
from defect and suitable for the
pressure rating of the system.
• Persons supervising
pressure/leak tests must be trained,
competent and qualified.
• Testing should be carried out
Unsafe Practice under PTW, which is required for
Hydro-test preparation each test or at least a test package Site Manager/Site
2 L-3
(water filling) Pinch Point for the same location. Supervisor & HSE
• Ensure the equipment tested by
the competent person, prior to
testing.
• Avoid Pinch point activity.
Properly signage at place.
Failure of • Rating of line/gasket/flange
line/gasket/flange should be suitable for hydro-test.
Air entrapment inside • Test spade/test blind should be as
pipeline per line rating.
Site Manager/Site
3 Hydro-Testing Activity • Gradually filling of water. L-4
Supervisor & HSE
Suddenly increase of • Pressure should be raised
pressure gradually.
PSV failure • All hoses/gasket is with line rating.
JOB SAFETY ANALYSIS (JSA) JSA #:
STEP JOB STEP POTENTIAL HAZARDS Current Controls CURRENT REQUIRED HAZARD RESIDUAL
NO RISK CONTROL RISK
List the steps required to Against each step list the potential All those controls which are
SCORE SCORE
perform the task in the hazards that could cause currently implemented and in-place For each hazard identified list
sequence they are injury/damage when the task step the control measures required
carried out. is performed. to eliminate or minimize the
risk of injury.
• Calibrated PSV should be
attached.
• Ensure to use allowable pressure
of HT pump.
Air hoses & Pneumatic tool • Use Ear Plug for Noise.
failure. • Access to the test area must be
limited to essential personnel only,
High intensity sound. barriers, warning signs, patrolling
the test boundaries.
Contact with equipment • Persons supervising
High pressure pressure/leak tests must be trained,
competent and qualified.
Exceeding max allowable Site Manager/Site
pressure. • Pressuring equipment should not L-4
Supervisor & HSE
be left unattended at any time
Un-attended pressurized during the test.
tool/equipment. • When the test pressure has been
reached, the pressuring equipment
Changing the duration of shall be isolated from the equipment
hydro-test. under test and where performable
disconnected.
Unsafe depressurization of • Ensure the equipment tested by
hydro-test fluid the competent person, prior to
testing.
JOB SAFETY ANALYSIS (JSA) JSA #:
STEP JOB STEP POTENTIAL HAZARDS Current Controls CURRENT REQUIRED HAZARD RESIDUAL
NO RISK CONTROL RISK
List the steps required to Against each step list the potential All those controls which are
SCORE SCORE
perform the task in the hazards that could cause currently implemented and in-place For each hazard identified list
sequence they are injury/damage when the task step the control measures required
carried out. is performed. to eliminate or minimize the
risk of injury.
• Close examination of equipment
at above maximum allowable
working pressure shall not take
place until the pressure has been
held for 30 min.
• Support of piping and equipment
exposed to the hydro-test should
have proper strength. Site Manager/Site
L-4
• Should have vent points at high Supervisor & HSE
position.
• Make sure no air trapped in line.
• Vent valves will be open after
pressure release.
• Never stand in front of the
pressure gauge during test. (Use
Face shield also)
Extension
Reviewed by
Area Owner (DM Name Signature Date
SECMC):
Reviewed by
SECMC HSE Name Signature Date
(Manager/ DM):
Approved by:
Department Name Signature Date
Manager:
NOTES:
1. Any additional controls or changes to controls following a change to scope or other “trigger” event shall be updated in the relevant section or on an additional sheet and
the workgroup consulted. Trigger events can be considered as:
a. Change to workplace;
b. Change to workplace environment;
c. Change to workplace conditions;
d. Change to Plant, People or Procedures; or
e. Following an event / incident / near miss that has occurred whilst applying the existing JSA controls.
I hereby confirm I have read, understand, and agree to comply with this JSA.
JOB SAFETY ANALYSIS (JSA) JSA #:
SIGNATURE SIGNATURE
EMPLOYEE NAME DATE EMPLOYEE NAME DATE