IM Format No. : 12 A
IM Format No. : 12 A
vehicles
front & back, orange color safety helmet,
Safety shoes, baton lights & red/green
flags, whistle or air horn (for high noisy
area)..
·Where roads are affected by fog, rain, ice Communicate the 1 4 4
Fatal / Serious
Driving etc. and in the hours of darkness extra weather conditions to
injuries due to Normal
during Driver, precaution must be taken into operators
collision and
adverse Site considerations either delays or make
toppling of
weather workers, alternative travel arrangements.
5 vehicle 3 4 12 1 4 04
condition staff, ·Defensive driving training to all drivers &
s and visitors operators
during and public ·Implement IC Driving Policy effectively.
nights
IM Format No. : 12 A
Formwork system
Work additional instruction when specialized
porary work‐ erecting
General formwork systems are used.
and cessation
Personal site staff ·Formwork inspection program shall be
dismantlin
Site developing to check the
g by injury due to
visitors installation/dismantling are carried out as
incompete falls and
impact of per the scheme drawing and sequence of
nt persons
falling objects operations before commencement of
erection or dismantling activity.
·Formwork erection and dismantling
should be barricaded with display
board to restricted unauthorized
entry.
·Lifting equipment and accessories shall
Abnormal be fit for purpose, tested for its
capacity, certified by competent person,
carry valid color code and pre-inspected
Personal before every use.
General
injury / ·Local made lifting hooks, rebar hooks shall
site
Slings fatality never be used for any type of lifting
workers &
breakage/ ·Slings/belts shall be protected against sharp
Precast elements lifting
8 3 4 12 1 4 04
site staff
failure edges.
Site
visitors ·Slings shall be protected against welding
current by insulating hooks / insulation
packing etc. Only competent riggers /
slingers shall be permitted to work on
site. Evidence of valid training shall be
submitted prior to appointment
·Temporary base support is provided for
placing that type of material.
16
·Tag line system to be followed while lifting.
Roller type
Lifting Material fall Site workers
9 Normal 4 4 1 4 04
material tilt on person & staff
on
adjacent to
Personal
·Excessive noise producing machine shall
Working
IM Format No. : 12 A
loss
Normal
Personal
injury/ long General site
·Water to be sprayed before and during the
Dust term health workers,
11 4 3 12 operation to control the dust generation. 2 3 06
pollution issues staff, visitors
·Use approved dust filter mask
respiratory & Public
disease
IM Format No. : 12 A
Hit, Crush, fire Injury, fatality, Workmen Normal 2 4 8 ·Only competent operators to be operate 1 4 4
Illness due to vehicle.
Noise, air Helper, Staff
pollution
excessive noise ·Banks man/helper to be provided along
level Supervisor
with vehicle movement.
·Only certified vehicles to be deployed.
·Ensure Reverse horns for all vehicles.
·Ensure speed limit within the workplace.
Concrete supply by TM
IM Format No. : 12 A
each shift.
·Implement IC Driving Policy effectively
regular basis.
Electrical connection to be routed through
ELCB,
Workmen medical surveillance program shall
be implemented to check his/her fitness to
work on vibrating machines.
Where practical arrange for worker rotating
19
Gas Cutting Fire, Burn, Fatal Workmen Abnorma 3 4 12 Gas cylinders should be fixed on trolley 1 4 4
Explosion Helper, Staff l and properly tied.
Regulator should be standard and good
Supervisor
condition.
Hose pipes should be ISI standard and
damage free.
Flash-back arrestor should be ISI marked
and to be used with both the torch as
well as regulator.
Gas cutting operation shall be carried
out by trained person.
Look out man to be available with the
Environment, Health and Safety
Integrated Management System Manual
IM Format No. : 12 A
gas cutter.
Goggles, leather hand gloves and Apron
to be used during the gas cutting.
Fire extinguisher to be available near the
work area.
Mandatory PPEs to be ensured during
the cutting work.
Hot work permit to be adopted before
starting the gas cutting.
Pre-start Verification and briefing to be
ensured before starting of works.
20 Steel cutting Trips & Injury Workmen Normal 2 3 M Use of inspected m/c & good working 1 3 3
& Bending Falls of workmen & Helper, Staff condition.
workmen staff Only trained workmen to be deployed for
Supervisor
due to the steel cutting and bending works.
poor
The quantity reinforcement shall not be
material
more than permissible limit.
stacking in
access The area of cutting and bending should
be obstruction free, dry and cleaned.
Scraps should be stacked at the
designated places.
Electrical supply should be routed
through ELCB/RCCB.
The condition of electrical cables should
be as per required standard and to be
protected either underground or over the
ground on the stand.
22 Concrete Noise Long term ill General site Normal 2 3 6 Mould should good condition and regular 1 3 3
Placing and health – workers & inspection should be carried out.
compacting hearing loss site staff Noise assessments shall be carried out
Site visitors during the concreting.
Workers exposed to continuous noise in
Environment, Health and Safety
Integrated Management System Manual
IM Format No. : 12 A
27 Hit by Serious injury Workmen/St Abnormal 3 3 9 Only mechanically fit third party certified 2 3 6 1.Buddy system 1 3 3
moving or fatality due affs & dumpers shall be put to use. shall be followed
dumpers/rev to run over hit Machineries Only licensed drivers shall be deployed. 2. Breathalyzers
ersing by dumpers. Reverse horn shall be used. shall be used for
dumpers/top Toppling of Desired slope with compacted roads shall drunken driving.
pling of dumpers due be made for plying of dumpers. 3. Banks man shall
dumpers to uneven be deployed.
slope and un 4. HIRA briefing to
compacted be done to every
Environment, Health and Safety
Integrated Management System Manual
IM Format No. : 12 A