Professional Documents
Culture Documents
01
NOTE:- ALSTOM COVID 19 RESTART GUIDELINES SUPERCEDES ALL OTHER CONTROL MEASURE
REQUIREMENTS AND MUST BE FOLLOWED WITH ZERO DEVIATION.
Avoid touching face, mouth, nose, eyes and other body parts which could trigger virus transmission by contact.
Transmission of
COVID-19 through
Reporting employees who are showing symptoms such as fever or high body temperature, coughing, difficulty of
gatherings, walking by
breathing or chest pain. Sending them to clinic or nearest hospital immediately.
or simply being in the
- Body temperature monitoring through Thermal Scanner or other devices to monitor the body temperature of each
same room with the
employee at site.
person who's
- Awareness and implementation of Quaratine Procedure for all employees joining from other locations
experiencing symptoms
- Implementing safe distancing (atleast 1.8meter) on camp/accomodation, workplace area, Mess Hall, Rest Shelters
of COVID-19 (fever,
and other Welfare Facilities to avoid spreading of the virus.
cough, difficulty in
- No Hand Shake Policy.
breathing) -
1.Health Hazard - Suspension of meetings/gatherings for certain period of time Or Limiting participation, maintaining social N95 Masks/Surgical MASKS
(Respiratory illness distancing as far as reasonably practicable. are Mandatory.
Transmission through
1 SITE/ Non Routine caused by COVID-19 No 2 5 10 B - Conduct regular housekeeping and sanitation for all area. Provision of Hand Sanitizer / Alcohol / Hand Wash 1 5 5 B
Infection that may lead droplets from a close Materials. Inlcuding proper sanitation/pest control and cleaning/disinfecting of camp premises and welfare facilities Other PPEs like Goggles, Hand
to fatality) contact with a possible
including transportaion vehicles. Gloves, etc Advised.
COVID-19 .
- Provide sufficient numbers of cleaners to cover all area and sanitize all parts of the working site
- Provision of adequate PPE's (N95 face mask/ Surgical Mask or any other as required).
- Unsanitized things
- Conduct awareness on how to protect yourself against the infection of COVID-19 through campaign (posters,
such as door knobs,
distribution of brochure, HSE Messages).
tables, chairs, floors and
- Communicating and implementing COVID-19 Guidelines
other part of the room or
welfare facilities,
vehicle body, etc.
1-Ensuring proper spacing/Gap between the two parts/ two pallets (400mm)
2-Ensure fastening/slinging according to the lifting plan.
3.Ensure that the slings are within the SWL. 1.Safety Helmet
4.Visual inspection to ensure that no sharp edges are present on the sling. 2.Safety Shoe
6.Fastening/ Slinging of 5. Ensuring that no slip/trip hazard exists by maintaining proper housekeeping (Ensure no unsafe condition)
Injury to body arts Yes 3 5 15 A 3.Reflective Jacket/Boiler suit 2 3 6 C
load 6.Do not climb on pallets (Unsafe act) 4.Cut
7. Wear mandatory PPEs, Cut resistant gloves. resistant gloves
8..Visual inspection to ensure that no sharp edges are present on the sling.if sharp edges present give packing on
sharp edges under the belt to avoid cut of sling or damage of slings.
9.Tag line/guide rope should be use to control the swinging load. 10.
1. Fall of personal Ensure warning barrier arround crane operation / movement area to prevent entry of personnel
2. Fall of materials 11. Safe load
3. Slipping & indicator must be in working condition, Hoist Limit Switch must be operational of Crane (F15 farana) i.e; Daily 1.Safety Helmet
tripping 1. Physical injury 2. check or inspection of crane prior to use . Ensure Audible signal for crane movement 2.Safety Shoe
4. Toppling Serious injury/struck by 3.Reflective Jacket/Boiler suits
4 Assy & Fixing of Belt conveyor Non Routine 5. Falure of farana injury/fatality No 3 3 9 B 12. Ensure no one is working under suspended load and around 4.Cut 1 2 2 D
lifting gear 3. Material Damage the swinging load 13.Tool box talk will be resistant gloves 5. Weldor
5. Fire ( hot work) 4. Properties damage given for all movements & lifting operations. 14. Ensuring that no slip/trip PPE 's 6. Grinding
6. Electric shock hazard exists by maintaining proper housekeeping (Ensure no unsafe condition) Sheild
(Power tools) 15.Do not climb on pallets (Unsafe act).
16.Ladder will be used for Entry and exit into the pit/foundation
17.Ensure excavation permit before executing the work
22. Use fall arrest equipment (harness) attached at all times to the scaffold when working. Fall protection
equipment to be subject to three monthly thorough inspections by a competent person with results recorded.
1. Fall of personal 23. Supervision will monitor the environmental working conditions to ensurethat employees are not put at risk
2. Fall hazard of 1. Helmet 2.
Booth Enclosure 1. Physical 24. Ensure Area/ground preparation will be done wherever required for the movement of scaffolding
materials Safety Goggles
injury/fatality 2. 25. Only trained operator /
3.Collapse of 3. Safety Shoe 4.
Blast Booth serious injury /struck by competent person is allowed to operate the MEWP. Operate on level ground and on a stable base
8
(Booth structure, Routine scaffolding / failure of YES 3 6 18 A safety Gloves 5. Full 2 4 8 C
injury 26. Ensure daily
roof structure, booth & roof JLG 4. Body harness 6. Safety
2. Damage of materials inspection and funchiof JLG/MEWP on check prior to using before operation
panels, Man door) Slipping & tripping 5. life line 7. Weldor
3. Damage of properties 27 keep platform og JLG/MEWP floor free of debris, mud, oil,
Failure of farana lifting grease andother slippery substances PPE'S
gear 28. Prior to entering and existing platformof JLG at ground level fully lower the boom . Enter/Exit through
gate only
28.Don’t climb or sit on outer edges of JLG and scaffolding
29.Do not carry material on platform railing of JLG/MEWP( Weight should not exceed)
30. Check, clearance above, on sides, on bottom of platform, when raising,
lowering, swinging and telescoping boom og JLG/MEWP.
31.Use fall arrest equipment (harness) attached at all times when
working 32. Work at height to be undertaken either in good levels
of daylight or with adequate task lighting provided.
33.Lifeline will be provided on the top of the
enclosure for the personal to work at roof platform 34 Ensure the load handled in
lifeline is well with in SWL 35.Fire extinguisher
will be placed nearer to hot work execution. Fire blanket will be used during execution of hot work at height
36 Good housekeeping
and flamable items to keep far from hot work execution 37. When two
contractors working at same location, duly signed permission to be taken and barrication to be done and should
not enter restricted area.
38. Don’t leave the suspended load unattended.
1. Barricating the working zone to prevent unauthorized entry.
2 Trained and expierenced manpower will perform the activity
3.Ensure All mandatody PPE worn by personal involved in the activity
4. TBT will be given before starting the work.
5. Ensure Cut resistant gloves/cotton hand gloves for manual assembly
6. Ensiure Manual handling should not exceed more than 55kg. Work rotation to be considered
7. Ensuring that no slip/trip hazard exists by maintaining proper housekeeping (Ensure no unsafe condition)
8. Mnaual lifting will be done as per lifting standards. Lifting will be done vertically
9. Use tested lifting tool-tackles of appropriate capacity (sling / synthetic belt / Dshackle / tailing hook etc.).
Visual inspection prior to use lifting tools
10. Visual inspection to ensure that no sharp edges are present on the sling.if sharp edges present give packing on
sharp edges under the belt to avoid cut of sling or damage of slings. 11.
Ensure warning barrier arround crane operation / movement area to prevent entry of personnel
12.Ensure the load handled is well with in SWL
1. Proper training will be given prior to job start on safe manual lifting techniques 2.
Only competent and expierenced technician will be allowed to perform this work 3. TBT will
be given for manual handling. Manual handling should not exceed more than 55kg. Work rotation to be considered
4. Fire 1. Safety Helmet
extinguisher will be placed at site during the execution of hot work 5. 2 . SafetyGoggles
1. Manual Handling 2. 1. Physical injury Mandatory PPE will be worn by all who involves to perform the work 6. 3 Safety Shoes
Fall of Material 3. Ensuring that no slip/trip hazard exists by maintaining proper housekeeping (Ensure no unsafe condition) 7. Ladder will be
11 Gear motor assembly Routine Fall of person 4. 2. Damage of materials NO 2 4 8 D
used for Entry and exit into the pit/foundation 8. Maintaining lifting 4. Hand Gloves 1 1 1 D
Slipping & Tripping 3. Fire plan before the execution 9. Use tested lifting 5. Full body harness 6.
hazard tool-tackles of appropriate capacity (sling / synthetic belt / Dshackle / tailing hook etc.). Visual inspection prior to use lifting Reflective jacket/full body
tools 10. Ensure the load handled is well harness
with in SWL 11. Ensure full body harness and
railings when working on height 12. Ensure no one is working under
suspended load
1. Barricating the working zone to prevent unauthorized entry. 2
Trained and expierenced manpower will perform the activity
3.Ensure All mandatody PPE worn by personal involved in the activity 4. TBT
will be given before starting the work. 5.
Ensure Cut resistant gloves/cotton hand gloves for manual assembly 6. Ensiure
Manual handling should not exceed more than 55kg. Work rotation to be considered 7. Ensure no one is
working under the suspended load 8. Ensuring that no
slip/trip hazard exists by maintaining proper housekeeping (Ensure no unsafe condition)
9. Manual lifting will be done as per lifting
standards. Lifting will be done vertically 10. Scaffolding to be erected and dismantled by a 1. Safety Helmet
1. Fall of personals 1. Physical competent person 11. Scaffold construction area to be isolated and cleared 2 . Safety goggles
2. Fall of materials injury/fatality/struck by of all persons 12. Scaffolds to be physically tied throughout all stages of
3 Safety Shoes
12 Working Platform (trolley) Routine 3. Fire hazards during injury YES 4 4 16 A erection and dismantling. 13. Maximum weight of scaffolding is agreed upon prior to set-up of 2 4 8 C
scaffold /Scaffolds must never be overloaded. Maintain awareness of total weight on scaffold, including employees ) 4. Hand gloves
welding 2. Damage of materials
14. Scaffolding is inspected for defects or damage prior to use /Operatives must inspect material prior to 5. Full body harness
4.Fire Hazard 3. Damage of properties use 6. Reflective jacket/ Boiler suit
15. Use fall arrest equipment (harness) attached at all times to the scaffold when working. Fall protection equipment
to be subject to three monthly thorough inspections by a competent person with results recorded.
16. Ensure Area/ground
preparation will be done wherever required for the movement of scaffolding 17. Ensure lifeline during working on
height 17. Fire extinguisher will be placed
nearer to hot work execution. Fire blanket will be used during execution of hot work at height
18. Good housekeeping and flamable items
to keep far from hot work execution 19.Ensure fire watcher for 4hrs after completion of hot
work
Risk Calculator
Severity
1 2 3 4
minor Notifiable
injury Serious injury injury Major injury
Medium Medium High High
5 Likely 5 10 15 20
Medium Medium High High
4 Probable 4 8 12 16
Low Medium Medium High
3 Possible 3 6 9 12
Likelihood
Low Medium Medium Medium
2 Remote 2 4 6 8
Low Low Low Medium
1 Improbable 1 2 3 4
A High Risk
B Substantial Risk
C Medium Risk
D Low Risk
5
Fatality
High
25 A High Risk
High
20 B Substantial Risk
High
15 C Medium Risk
Medium
10 D Low Risk
Medium
5
RISK BASED Control Plan