You are on page 1of 5

LIFTING / UNLOADING PLAN

Site - GE DIESEL LOCOMOTIVES PVT.LTD


Location of Activity -
Responsible Supervisor(s) present at work Place - Rajiv Das
Material to be Unloaded/Lifting - Automatic Shot Blasting Line

Vehicle No - MP 22 G 3405

LR No. - 137

Prepared By (Contractor) Reviewed By (Concern Dept.) Reviewed By EHS Dept.


Sign:- Sign:- Sign:-
Name:- Name:- Name:-

www.blastcleansystems.com
Date: - 26 / 03 /2018

UNLOADING PROCEDURE

Equipment to be used during Unloading as per weight standards


Maximum Weight to be lift - 1 ton
Maximum height to be lift - 4 mtr
EOT Crane 5 ton
OR
New Generation Hydra 12ton
Sealing to be use - ᴓ16 x 3mtr lg
D-Shackles to be use - 3 ton
Lifting belt to be use - 3 ton x 3mtr lg
If hydra, angle to be used for lift - 45ͦ

Plant or Equipment Requiring Certification

 Hydra / Crane
 Lifting belt / Wire rope / D-shackles
 Skilled, trained and experienced workers to be involved

Site Condition
 Area is cordoned off - Yes ⃝ No ⃝
 Area is clear for movement - Yes ⃝ No ⃝

 Proper Illumination Provided - Yes ⃝ No ⃝

www.blastcleansystems.com
1.
Part to be lift - Assy of S.C & Ele.Top (Sr no.-1-2)
Weight of the Material - 1 ton
Lifting/ Unloading by - 1. EOT Crane ⃝
2. Hydra ⃝
Crane or Hydra to be used - 5 ton / 12 ton
Lifting Belt to be Used - 3 ton x 3 mtr lg – 2nos
Maximum height to be lift - 4 mtr from floor
If hydra, angle used to be lift - 45ͦ

2.
Part to be lift - Structure, Gratings, Ducting (Sr no. 3-39)
Weight of the Material - 0.07 ton
Lifting/ Unloading by - Manual Handling
Maximum weight to be lift - ˂0.07ton
No. of Persons engage for lifting - 4

3.
Part to be lift - Roller conveyor (Sr no. 40 & 41)
Weight of the Material - ˂1 ton
Lifting/ Unloading by - 1. EOT Crane ⃝
2. Hydra ⃝
Crane or Hydra to be used - 5 ton / 12 ton
Sealing to be used & quantity - ᴓ16 x 3mtr lg -4nos
Other Lifting Accessories, Capacity & quantity - D-Shackles – 3 ton capacity – 4nos
Maximum height to be lift - 4 mtr
If hydra, angle used to be lift - 45ͦ

www.blastcleansystems.com
4.
Part to be lift - Ducting (Sr no. 42-63)
Weight of the Material - ˂1 ton
Lifting/ Unloading by - 1. EOT Crane ⃝
2. Hydra ⃝
Crane or Hydra to be used - 5 ton / 12 ton
Lifting belt to be used & quantity - 3 ton x 3 mtr – 2nos
Maximum height to be lift - 4 mtr
If hydra, angle used to be lift - 45ͦ

5.
Part to be lift - Roller Cover (Sr no. 64-68)
Weight of the Material - ˂1 ton
Lifting/ Unloading by - 1. EOT Crane ⃝
2. Hydra ⃝
Crane or Hydra to be used - 5 ton / 12 ton
Lifting belt to be used & quantity - 3 ton x 3 mtr – 2nos
Maximum height to be lift - 4 mtr
If hydra, angle used to be lift - 45ͦ

6.
Part to be lift - Ducting (Sr no. 69-89)
Weight of the Material - ˂1 ton
Lifting/ Unloading by - 1. EOT Crane ⃝
2. Hydra ⃝
Crane or Hydra to be used - 5 ton / 12 ton
Lifting belt to be used & quantity - 3 ton x 3 mtr – 2nos
Maximum height to be lift - 4 mtr

www.blastcleansystems.com
7.
Part to be lift - Paint Drums (Sr no. 90-94)
Weight of the Material - ˂0.025ton
Lifting/ Unloading by - Manual Handling
Maximum weight to be lift - ˂0.025ton
No. of Persons engage for lifting - 4

www.blastcleansystems.com