DESIGN MIX WITH NO CHEMICAL DESIGN MIX WITH CHEMICAL

Coarse Aggregate: 1083 kg Coarse Aggregate: 1083 kg


Fine Aggregate: 784 kg Fine Aggregate: 784 kg
Cement: 400 kg Cement: 320 kg
Water: 180 kg Water: 112 kg
W/C Ratio: 0.45 Admix CF 56: 2.1L
W/C Ratio: 0.35
Key Notes:
Conserved Cement (X): 80 kg
Conserved Water (Y): 68 kg

Cost of X: Ghs 86/Cubic

Cost of Chemical (Z): Ghs 21/Cubic

Cost of X - Z = GHS 65

Amount saved on 10 cubic: Ghs 650