Mdata Miano-26
Job in Progress…
Comments :
Estimated Cost :
Description : Amount US$ :
SLB WL RO # 4500077893 $26,625
SLB SWT RO # 4500077887 Job in progress
NWSL RO # 4500077867 Job in progress
SPRINT CT RO # 4500077882 Job in progress
SPRINT Pumping RO # 4500077880 Job in progress
WBS: O.MEHAR.E.W016.W01.110C -
Total = 26,625 US $
Prepared by: Ali Ahmed
660256622.xlsx
UEPL Beta G.m.b.H Main Data 1
WELL TESTING DATA SHEET
Miano/Miano-26/ClT Miano-26/22032
deg
Flowing Condition Production Rate Ratio
Time Bottomhole Wellhead Separator
Choke Size Cond. Gas
BHP BHT WHP1 WHT WHP2 Diff Casing Sep Gas Cond. Chloride
Gravity Gravity
CO2 H2S Cond. Gas Water WGR
Size Equiv. Press Temp Press Temp Press Press Press Press Temp Temp
hr:min 64 ths 64 ths psiA degF psiG degF psiG psi psiG psiG degF degF SG60 air=1 % ppm bbl/d MMscfd bwpd bbl/MM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
15-Jun-22 WHP1 - Upstream of Sand Filter, WHP2 - downstream of Sand Filter but upstream of Choke Manifold. stbd
01:49 Opened master valve.
01:50 Opened well at 16/64" adjustable choke to water pit.
01:57 Gradually increased adjustable choke size up-to 128/64".
01:58 CT OPERATION - UNDERBALANCE
01:59 CT started RIH.
02:00 128 2 94 0 ###
02:15 128 2 94 0 ###
02:30 128 2 95 1 ###
02:45 128 1 95 0 ###
02:48 Observed liquid returns at choke manifold sampling point.
03:00 128 1 96 1 ###
03:15 128 1 96 1 ###
03:26 CT stationed at 3500 ft KB and started pumping N2 at 400 scf/min.
03:30 128 2 96 1 ###
03:45 128 1 99 0 ###
04:00 128 1 102 0 ###
04:01 Observed liquid returns at choke manifold sampling point.
04:15 128 1 101 0 ###
04:27 Observed nitrified brine at choke manifold sampling point.
04:28 Observed lean N2 at surface.
04:29 CT resumed RIH and stopped pumping N2.
04:30 128 3 107 0 ###
04:45 128 14 102 0 ###
05:00 128 1 101 0 ###
Draft Copy
Some parameters may or may not have been updated yet