CONSTRUCTION SUPERVISION OF MARAWI TRANSCENTRAL ROAD, CONTRACT PACKAGES IIIA, IIIB, IIIC AND IIID, ROAD NETWORK DEVELOPMENT

PROJECT IN CONFLICT- AFFECTED AREAS IN MINDANAO (RNDP-CAAM), UNDER JICA LOAN AGREEMENT NO. PH-F-P1

Project Name: Marawi Transcentral Road, Phase III, under Road Network Development in Conflict
Affected Areas in Mindanao (RNDP-CAAM), JICA Loan Agreement No. PH-F-P1, Contract Package 3-B
Rehabilitation of Transcentral Roads.
Consultant: Woodfields Consultant Inc.
DATE COVERED: JUNE 2022
TRAFFIC MANAGEMENT PLAN
Road 13 Road 14 Road 9-1
PCCP REMOVAL SUBBASE PREPARATION
STA. 0+085-0+220 L/S STA. 2+380-2+446 B/S
STA. 0+250-0+446 R/S
SURPLUS COM. EXCAVATION
STA. 0+085-0+220 L/S Pouring of Lined Canal
STA. 0+250-0+446 R/S STA. 2+620-2+800 R/S

SUBGRADE PREPARATION
STA. 0+085-0+220 L/S
STA. 0+250-0+446 R/S

SUBBASE PREPARATION
STA. 0+085-0+220 L/S
STA. 0+250-0+446 R/S

PCCP (Unreinforced, 280mm thk)


STA. 0+085-0+220 L/S
STA. 0+344-0+437 R/S

PCCP (Unreinforced, 230mm thk)


STA. 0+085-0+220 L/S
STA. 0+344-0+437 R/S

Pouring of Lined Canal


STA. 0+000-0+170 L/S
Ro