DTO-Performance-Report-Dec-2022 (Week 53)

You might also like

You are on page 1of 4

1.1.

RADIO ACCESS NETWORK PERFORMANCE


1.1.1. Key Performance Indicators

2G GSM – QoS Performance


27 Nov – 01 January 2023
Week 1 Week 2 Week 3 Week 4 Week 5
KPIs Baseline
[27th Nov – [04 Dec – [11 Dec – [18th Dec –
th th
[25th Dec –
Dec 04th] Dec 11th] Dec 18th] Dec 25th] Jan 01st]
Call Setup
96.13 97.39 97.32 97.68 97.65
Success Rate >98
(Accessibility)
Call Drop Rate 1.22 1.14 1.28 1.28 1.34
≤2
(Retainability)
Cell Available
85.88 89.05 86.27 84.77 82.86
Rate >98
(Availability)
Traffic Channel
2.27 2.26 2.23 1.97 2.01
Congestion ≤2
(Utilization)

3G UMTS – QoS Performance


27 Nov – 01 January 2023
Week 1 Week 2 Week 3 Week 4 Week 5
KPIs Baseline
[27th Nov – [04 Dec – [11 Dec – [18th Dec –
th th
[25th Dec –
Dec 04th] Dec 11th] Dec 18th] Dec 25th] Jan 01st]
CS Call Setup
99.80 99.86 99.85 99.86 99.85
Success Rate >98
(Accessibility)
PS Call Setup
99.38 99.41 99.40 99.40 99.42
Success Rate >98
(Accessibility)
PS Service
0.92 0.88 0.87 0.90 0.92
Drop Ratio (%) ≤2

CS Service
0.28 0.26 0.26 0.26 0.26
Drop Ratio (%) ≤2

Page 1 of 4
Cell Available
97.16 97.65 97.58 97.13 97.86
Rate >98
(Availability)
Total Carrier
27.35 27.81 27.90 28.21
Power Usage ≤ 70 28.13
(%)

4G LTE – QoS Performance


27 Nov – 01 January 2023
Week 1 Week 2 Week 3 Week 4 Week 5
KPIs Baseline
[27 Nov – [04 Dec – [11 Dec – [18th Dec –
th th th
[25th Dec –
Dec 04th] Dec 11th] Dec 18th] Dec 25th] Jan 01st]
Call Setup 97.41
97.58 98.81 98.61 96.83
Success Rate >98
(Accessibility)
LTE Service
0.56
Abnormal 0.53 0.47 0.51 0.59
≤2
Release Rate
(Drop) (%)
Cell Available
95.67 95.45 97.25 97.11 97.53
Rate >98
(Availability)

1.1.2. Capacity Utilization


2G GSM
KPIs 27 Nov – 01 January 2023
Week 2 Week 3 Week 4 Week 5
Week 1
[04 Dec –
th
[11th Dec – [18th Dec – [25th Dec –
[27th Nov – Dec 04th]
Dec 11th] Dec 18th] Dec 25th] Jan 01st]
Traffic Volume
(Erl) 659109.98 696037.89 639509.48 591146.21 573172.01

Page 2 of 4
3G UMTS
27 Nov – 01 January 2023
Week 2 Week 3 Week 4 Week 5
KPIs Week 1
[04 Dec –
th
[11 Dec –
th
[18th Dec – [25th Dec –
[27 Nov – Dec 04th]
th
Dec 11 ]
th
Dec 18 ]
th
Dec 25th] Jan 01st]
Traffic
Volume 4007531612.21 4405211325.13 4238092556.86 4250141996.25 4400992802.67
(MB)

Circuit-
Switched
(CS) 116504.42 117975.91 118103.99 114941.57 103083.39
Speech
Erlang
(Erl)

4GLTE
27 Nov – 01 January 2023
Week 2 Week 3 Week 4 Week 5
KPIs Week 1
[04 Dec –
th
[11th Dec – [18th Dec – [25th Dec –
[27th Nov – Dec 04th]
Dec 11th] Dec 18th] Dec 25th] Jan 01st]

DL Payload 673555.49 630039.17 616924.09 595235.07 604671.90


(Gbits)

UL Payload 75407.85 67418.26 68473.37 63861.95 65004.80


(Gbits)

1857610.00 1652608.00 1652969.00 1625204.00 1579905.00


Maximum Users

1.1.3. Challenges and Notes


 Congestion and unreliable power supply systems for rural sites.
 Spare part is a major challenge
 Some license issues that require to be resolved

Page 3 of 4
 Coverage issues are inevitable in the small network like ours.
 PS traffic has been decreasing since the raise of price of bundles.

2. CONCLUSION
The management is requested to take note and deliberate on various issues presented in this paper.

Page 4 of 4

You might also like