You are on page 1of 2

POOR NEEDS DEVELOPMENT CAPABLE SATISFACTORY MASTERED TOTAL

GRADE 11
Unsatisfac Satisfactory performance Capable of Satisfactory Mastered
LIGHTING WIRING SYSTEM tory of some elements of task performing task performance of task. competency. Able to
(HORN SYSTEM) performan and unsatisfactory adequately, but Acceptable perform all elements
ce of task. performance of some some elements need performance of all of task successfully
elements of task. improvement elements of task with and independently
mastery of some without supervision.
elements.
1 3 5 7 10

Diagnose electrical/ electronic


integrity of series parallel and
series parallel circuits using
principles of electricity.
Demonstrate proficiency in
connecting wiring horn system.
Diagnose, service in horn wiring
connection.
Demonstrate the ability to think
critically.
Demonstrate the proper use of
during diagnosis of electrical
circuits problems including source
voltage.
TOTAL SCORE

PREPARED BY:

RYAN D. ABANICO
Instructor
POOR NEEDS DEVELOPMENT CAPABLE SATISFACTORY MASTERED TOTAL
GRADE 12
Unsatisfac Satisfactory performance Capable of Satisfactory Mastered
SERVICE IGNITION SYSTEM tory of some elements of task performing task performance of task. competency. Able to
performan and unsatisfactory adequately, but Acceptable perform all elements
ce of task. performance of some some elements need performance of all of task successfully
elements of task. improvement elements of task with and independently
mastery of some without
elements. supervision.

1 3 5 7 10

Diagnose electrical/ electronic


integrity of ignition system
Demonstrate proficiency in
connecting ignition system
Diagnose, service ignition system

Demonstrate the ability to think


critically.
Demonstrate the proper use of
tools during diagnosis ignition
system

TOTAL SCORE

PREPARED BY:

RYAN D. ABANICO
Instructor

You might also like