You are on page 1of 4
eletax: 080-22945108, ‘e-mail: cep@bwssb.gov.in cetacean 080-22945108 Borictedd decd AOvoew we) eeesdo® sos BANGALORE WATER SUPPLY AND SEWERAGE BOARD Office of Chief Engineer (WWM-110V) ‘Cauvery Bhavan, III Floor, Bangalore 560009 No. BWSSB/CE(WWM-110V)/ ACE(WWM-110V)-1/ (3% /2022-23 Dt: 04/05/ 2022 MEMORANDUM Sub: - BWSSBP III CP 27, Design Engineering construction and commissioning of Srp and ISPS with O&M thereof for 7 years (Works A) and Procurement and construction of Main sewers including manholes in Dasarahalli and RR Nagar zones (V Valley catchment) (Works B) under JICA - Regarding construction of Retaining Wall at Chikkabanavara. A “ORef: 1) BWSSB/EE(Cstr)/TS/11/2022-23 Dt:06.04.2022 m 2) O.N approved by Hon'ble Chairman Dated:30.04.2022 3) ONTB/BWSSB/BWSSBIII/CP-27/2022/4190 Date:23.03.2022 4) ONTB/BWSSB/BWSSBIII/CP-27/2022/4558 Date:05.05.2022 5) wesc dG (aio. /80.26.800:5694-1:2022 8:18.02.2022 PREAMBLE: The work of Design Engineering construction and commissioning of STP and ISPS with O&M thereof for 7 years (Works A) and Procurement and construction of Main sewers including manholes in Dasarahalli and RR Nagar zones (V Valley catchment) (Works B) under JICA assistance has-been awarded to M/s. KBR- AIPPL JV at an contract price of Rs. 363,53,40,269/-. The construction of 4MLD capacity STP at Chikkabanavara is a part of the contract. ‘The proposed location of STP is adjacent to the nala and at the upstream of the STP Chikkabanavara lake weir exists. Due to this, the STP as well as the properties/area adjacent to the STP is susceptible for flooding during monsoon. Hence, by constructing the drain the rain water can be channelized from the lake side and the encroachment of BWSSB premises can also be avoided. But, the construction of retaining wall and drain is not in the original scope of work. Hence, the expenditure towards the said works is proposed to be met out under Provisional sum of Rs. 13,30,00,000/- at the estimated rates based on PWD/Common 2022 along with 10% area weightage,12% GST with all necessary provisions for easy /execution of the work. 60-8 ORDERS THEREON: Pursuant to the above, the work of construction of Retaining Wall at Chikkabanavara STP premises is technically sanctioned for Rs.1,48,10,000/- (Rupees One Crore Forty Eight Lakh Ten Thousand Only) based on PWD/Common SR 2022 along with 19», area weightage,12% GST. f the above estimate is chargeable under the Head of Main Work Cp.z “27 0,00,000/ ted in this office register The cost of under -Provisional Sum of Rs.13,3 The sanction to the estimate is nol vide CER No.01/2022-23, Dated:09.05.2022. Chief Engiicer (WWM-110V)(I/c) _ See ACE(WWM)-110)-1 for information and necessary action, spy to EE(Cstr) for information alon; with co, Sanctione , eae mecicnry atom’ 1s py of the sanctioned estimate for taking COPY 40 onrg $8. Infrmosion and to Subnaiee dy Prawings Acepclinglyp, Retaining Wai 10 meters on the nana oppouae te STP mn tear ore | aa] aRP—— [2 | cure | aay = eae] / crs racy amano | | frwes \ eee nea wean eo | ine nana oth opto 37 88 Bet Sawn ety asm ed watees_ spon Peay sresang ot exon ae eeu cane aie > (Gea ecg te tees | fnseyhaattSitncarg esc on | [rain See | tae ietopcto mt ec cand SH rectemcadg cauien hts comer SOR 2022 [rons cum | 1 | 5000] co | 200 | s20000| r2coco| 72 ereon00 ea ang WATE OTT a (ETS OR | > [ronches pin, sees ef foundatons and anal ee ee ney ok etre Oey = 2 [Sea Ma Siang cach ceprted yor "oy| Cum | 1 | 19000 ssoco | seo | zo | roumen | oomemn tone se ae at wis 3 dl eae Praring ana apm. poaTOR pi [nar eonerte fo" leveling cuts frat wos Jsmcaton The gramenaptasat crushes grea] [Grae cggrognes ano tne sgnegsles os. pe| |eirat Ie Codes racine mee, fad n tyes nl Joceeang 180 men tuexness, wel campacie usin] [Sie vovaors, elidng ai lesa & is, cost oa a eras of vaity. about, Usage charges of] Cum | 1 | 15000] 400 | 010 | ooo | sooo | ssee the ote appurtenances Cconeran SOR 2022, papers) 212 savedoco [rat be pad seperate 148 MS) Using 40 Rr ld wn se graded rushed couse sas (Ruble Stag tr toing below PCC Tor uration) = [osng 1S0men to 230mm Yacx ube siones cu Pl exec aes a PS Pe. Imsoral charges. losdng & wsoesng, layng win) CA” faza} ios) (Gi labow et comp lace. mas grade-Provaing od laying Renters Jesmentconeete fora Basemert & surace level [retro wal etaning wats sunken foo [the ganfe! apbssat crusnod graced cowse [dgpagetes and tie opgegstes 2s per raven (S| [cedes mecrine med win super passers, lcyers not exceeding 160. mm theenes, wel Jcoroacied usog neode Virals powang ween |rous wherever nessa, euang a tad ® ts Joa of afters ef ua, labour, Usage charges lt machinery. cvieg ata tober appurtenances fate Using 39 mm and down size graded crushed] Ready Mix Concrete = 125 Up to 150 meters Wom Culver” on tie ban lopposne to STP i co sr | sa aes gt pon OTe Gan [1 | 15000 | o200| 207A 6000 CComan SOR 2022 reper ssoco| (02s| 400 | 240 00 76725 00 pe poten of wal cum | + | 150 2aoon | sas: sereras ea JFommort :Provang and removing steal entering Jrutera sisting, propping et. and remove! ol ls wor tr tundatons,fostngs bases of cours lor moss concrete neing cost of a male lavrcompete as per speccabons oe 8 i Fem Ci a rw Damo Joctna Fa sqm | 2 | 12000 050 | 16000 | 5000 | exe sears [Seat ponent wat = sen | 2 | ss0000] 200 | sooco | eoooo | axes 37700 0 | | | een | 2 [oon co | women | aooeo | ens | veemee | —- Kos - 58500 00 | 56500 00 106 ‘6201000.00) J common SOR 2022 Nosim | 2 | 15000 30000 | 30000 238 7170.00 VOL3, PAGE NO -% SLNO-13 4 Total Total cost with Area Weighlago @ GST PMC charges @ 1% : Privisional Sum @ Contengency @ 3% Re aa6ass] 1 Pacey ‘Admin Charges @ 1% Rs_1.48,487| Price escalation @ 6% Rs. 8,90,922| IEF B35. TOTAL AMOUNT] Rs. 1,64.82,064 Ay MH, INS 04, 823 5) A ty | Lee, re he (wwen-nov)-t4 jee lovme9p 3 E:

You might also like