SERVICE REPORT

Report Created: Dec 19, 2022 2:42 PM

Customer and Service Information


Customer PT. Supreme Energy Muara Laboh
PT. Supreme Energy Muara Laboh, Solok Regency Selatan, Muara Laboh Geothermal Power Plant, Alam Pauh Duo,
Business Location
Pauah Duo
City Solok Regency Selatan
Agreement 1-96146016275-PT. Supreme Energy Muara Laboh
Service Request 1-97759562232
Description Test Load Ex-SR 1-96143625111
PO Number SO 21000081-OS-10101
Billing Type Time & Material

Customer Contact Tatis Sutistna MHE Demag Contact Asron Kembaren


62-21-27882222
tatis-sutisna@supreme-energy.com asron.kembaren@mhe-demag.com

Assets
Steam Turbine Generator
Double girder EOT - 2 trolleys wire rope hoists

Manufacturer KONECRANES Lift 19m


Serial number ML01SMA01 Volt/Ph/Hz 380-3-50
Site Location Solok - Sumatera Barat
Capacity/SWL 75/38 T
Model CXT70820800P74FND0S
Service Products MAINMAN Planned Maintenance
Hoists
Asset Description Serial number Model Type Manufacturer Capacity
XCT70820800P74
Steam Turbine Generator 58014882 KONECRANES 75 t
FNDOS
CXT70420400P64
Steam Turbine Generator 58001972 KONECRANES 38 t
ELDOS

 Documentation
Repaired
Date Reported Dec 16, 2022
Technician Niko Andrian
Task Type Certified test load
Fault Code Acceptable
Risk No direct risk
Recommendation Adjustment Procedure
Comment:
. Load test 110 % 82 T
.

. Adjusting Hoist down Limit switch 38 t

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
1/8
SERVICE REPORT

Dec 19, 2022 9:09 AM Chaerudin Chaerudin, Customer Dec 16, 2022 10:23 PM Niko Andrian, Technician

Workshop
Single girder EOT - 1 trolley wire rope hoist

Manufacturer KONECRANES
Serial number ML01SMC01
Site Location Solok - Sumatera Barat
Capacity/SWL 10
Model EKKE CXT50410100P55FDL0S
Service Products MAINMAN Planned Maintenance
Hoists
Asset Description Serial number Model Type Manufacturer Capacity
CXT50410100P55
Workshop 12242959 KONECRANES 10 t
FDLOS

 Documentation
Repaired
Date Reported Dec 18, 2022
Technician Niko Andrian
Task Type Certified test load
Fault Code Acceptable
Risk No direct risk
Recommendation No Action
Comment:
. Test load OHC workshop
.

. Load 125 % swl 8 t

Dec 19, 2022 9:09 AM Chaerudin Chaerudin, Customer Dec 18, 2022 8:39 PM Niko Andrian, Technician

Hot Well Pump


Monorail system - 1 trolley electric wire rope hoist

Manufacturer KONECRANES
Serial number ML01SMD312
Site Location Solok - Sumatera Barat
Capacity/SWL 20.000 kg
Model EL1-CXT60410200P64EEN0S
Service Products MAINMAN Planned Maintenance

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
2/8
SERVICE REPORT
Hoists
Asset Description Serial number Model Type Manufacturer Capacity
EL1-
Hot Well Pump 12240944 CXT60410200P64 KONECRANES 20 t
EEN0S

 Documentation
Repaired
Date Reported Dec 17, 2022
Technician Niko Andrian
Task Type Certified test load
Fault Code Acceptable
Risk No direct risk
Recommendation Replace
Comment:
. Test load OHC Hot well pump
. test 110% swl 20 t
.

. Repair Rope end and install Rotary lamp

Dec 19, 2022 9:09 AM Chaerudin Chaerudin, Customer Dec 17, 2022 9:48 AM Niko Andrian, Technician

Cooling Tower
Pillar jib crane - electric chain hoist
Manufacturer KONECRANES Volt/Ph/Hz 400-3-50
Serial number ML01SMD21
Criticality Low
Site Location Solok - Sumatera Barat
Capacity/SWL 2500 kg
Jib Crane
Model
CLX2581250M52SP200N148405
Service Products MAINMAN Planned Maintenance
Hoists
Asset Description Serial number Model Type Manufacturer Capacity
CLX2581250M52
Cooling Tower Jib Crane 1801400007 KONECRANES 2.5 t
SP200N148405

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
3/8
SERVICE REPORT
 Documentation
Repaired
Date Reported Dec 18, 2022
Technician Niko Andrian
Task Type Certified test load
Fault Code Acceptable
Risk No direct risk
Recommendation Monitor/Follow insp. interval
Comment:
. Test load OHC Jib crane
.

. load 125% swl 2,5 t

Dec 19, 2022 9:09 AM Chaerudin Chaerudin, Customer Dec 18, 2022 8:44 PM Niko Andrian, Technician

Chemical Building
Monorail system - 1 trolley electric chain hoist

Manufacturer DEMAG Lift 8m


Serial number 94916959 Volt/Ph/Hz 380-3-50
Criticality Moderate
Muara Laboh Geothermal Power Plant,
Site Location
Alam Pauh Duo,
Capacity/SWL 2T
Model DC Pro-10 2000
Service Products MAINMAN Planned Maintenance
Hoists
Asset Description Serial number Model Type Manufacturer Capacity
Chemical building monorail chain DC-PRO 10-2000
94916959 DEMAG 2t
hoist 2/1 H8 V6/1.5

 Documentation
Repaired
Date Reported Dec 18, 2022
Technician Niko Andrian
Task Type Certified test load
Fault Code Acceptable
Risk No direct risk
Recommendation Monitor/Follow insp. interval
Comment:
. Test load OHC chemichal
.

. Load 125% swl 2 t

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
4/8
SERVICE REPORT

Dec 19, 2022 9:09 AM Chaerudin Chaerudin, Customer Dec 18, 2022 8:50 PM Niko Andrian, Technician

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
5/8
SERVICE REPORT
Report Created: Dec 19, 2022 2:42 PM

Labour Hours and Expenses


Date Description Asset Pcs Distance Hours
Dec 14, 2022 Niko Andrian / Prepare Steam Turbine 8
tools perjalanan Generator
PT.Supreme energy
muara labuh
Dec 14, 2022 Niko Andrian / meal Steam Turbine 1
adjustment Generator
Dec 14, 2022 Niko Andrian / Material Steam Turbine 1
cost Generator
Cost travel to office
pekanbaru
Dec 14, 2022 Niko Andrian / Material Steam Turbine 1
cost Generator
1.purchase oil 4L
Dec 14, 2022 Niko Andrian / Steam Turbine 1
Transportation cost Generator
BK 8208 CJ
petrol 50L
Dec 15, 2022 Niko Andrian / Travel Steam Turbine 8
pekanbaru - muara labuh Generator
PT.Supreme energy
Dec 15, 2022 Niko Andrian / Travel Steam Turbine 1
pekanbaru - muara labuh Generator
PT.Supreme energy
Dec 15, 2022 Niko Andrian / Travel Steam Turbine 3
pekanbaru - muara labuh Generator
PT.Supreme energy
Dec 15, 2022 Niko Andrian / meal Steam Turbine 1
adjustment Generator
Dec 15, 2022 Niko Andrian / Steam Turbine 1
Transportation cost Generator
BK 8208 CJ
petrol 20L
Dec 15, 2022 Niko Andrian / Material Steam Turbine 1
cost Generator
Dec 16, 2022 Niko Andrian / Load test Steam Turbine 1
OHC Steam turbine Generator
generator PT.Supreme
energy muara labuh
Dec 16, 2022 Niko Andrian / Test load Steam Turbine 8
OHC steam turbine Generator
generator PT.Supreme
energy muara labuh
Dec 16, 2022 Niko Andrian / meal Steam Turbine 1
adjustment Generator
Dec 16, 2022 Niko Andrian / Material Steam Turbine 1
cost Generator
Cost antigent permit to site
PT.Supreme energy
Dec 16, 2022 Niko Andrian / Material Steam Turbine 1
cost Generator
purchase taspen
Dec 17, 2022 Niko Andrian / Test load Hot Well Pump 8
OHC Hot well pump
PT.Supreme energy
muara labuh
Dec 17, 2022 Niko Andrian / meal Hot Well Pump 1
adjustment
Dec 18, 2022 Niko Andrian / Test load Cooling Tower 2.5
OHC Slewing jib
PT.Supreme energy

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
6/8
SERVICE REPORT
muara labuh
Dec 18, 2022 Niko Andrian / Test load Chemical 1.5
OHC chemichal Building
PT.Supreme energy
muara labuh
Dec 18, 2022 Niko Andrian / Test load Chemical 1
OHC chemichal Building
PT.Supreme energy
muara labuh
Dec 18, 2022 Niko Andrian / Test load Workshop 4
workshop PT.Supreme
energy muara labuh
Dec 18, 2022 Niko Andrian / meal Workshop 1
adjustment
Dec 19, 2022 Niko Andrian / Reporting Steam Turbine 8
PT.Supreme energy Generator
muara labuh
Dec 19, 2022 Niko Andrian / meal Steam Turbine 1
adjustment Generator
0 54

Travelling Time, Expenses and any Overtime Premium incurred will be charged extra to the above hours.
Please note that this is not the final report version and some information may change. Your final report will be available later in yourKONECRANES.com

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
7/8
SERVICE REPORT

Component Condition
 Acceptable (No issues detected)
! Need Attention

Findings and Actions


Safety Risk
Indicates an unsafe condition. Failure to remedy such condition before continued operation of the identified Asset may result in personal injury
including death, or property damage.

Production Risk
Indicates an inefficient condition. Failure to remedy such condition before continued operation of the identified asset may result in inefficient asset
performance or an interruption in production.

Undetermined Condition
Indicates that the condition could not be directly verified through visual inspection as a result of asset configuration and/or obstruction.
The condition of certain components cannot be directly verified through visual inspection without further disassembly and/or the use of other
inspection methods. These advanced services are generally excluded from the scope of typical compliance and preventive maintenance inspections.
Consultation Services may be added to a Service Program or offered on a stand-alone basis to assess the condition of these components. Inspection
frequency for these components should follow OEM recommendations and/or governing regulations. If no records are available, we recomm end
appropriate inspections be carried out to determine current condition and to establish a baseline for recurring inspections.

Improvement Opportunity
Indicates a potential opportunity to improve the safety, productivity, application or useful life of the asset.

Acceptable / Repaired Item


Component condition is verified by Konecranes service technician. No actions required. If a component or other object has been repaired within the
service visit, green color code is shown as well.

A member of the Konecranes Group. © 2022 Konecranes. All rights reserved. All services are subject to and carried
out under Konecranes General Terms and Conditions for Services (v. 23.5.2021), which are attached hereto or made
available upon request.
8/8

You might also like